Federal Register / Vol. 79, No. 90 / Friday, May 9, 2014 / Notices
would take water from the existing
Eastman Lake; (2) a new powerhouse at
the base of the existing Buchanan dam
containing a 2.98-megawatt turbinegenerator; (3) a new estimated 0.5-milelong primary transmission line
connecting the project to Pacific Gas
and Electric Company’s transmission
lines south of the project; and; (4)
appurtenant facilities. The proposed
project would have an estimated average
annual generation of 11,258 megawatthours and operate utilizing releases
from Eastman Lake, as directed by the
Corps.
Applicant Contact: Mr. Kurt Johnson,
Telluride Energy, LLC, 100 West
Colorado, Suite 222, P.O. Box 1646,
Telluride, CO 81435; phone: (970) 729–
5051.
FERC Contact: Shana Murray; phone:
(202) 502–8333.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14578) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
VerDate Mar<15>2010
14:53 May 08, 2014
Jkt 232001
Dated: May 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10616 Filed 5–8–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14577–000]
Telluride Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 15, 2014, Telluride
Energy, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Hidden
Dam Hydroelectric Project (Hidden Dam
Project or project) at the U.S. Army
Corps of Engineers’ (Corps) Lake
Hensley and Hidden dam on the Fresno
River, near the city of Madera in Madera
County, California. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new penstock that
would take water from the existing
Hensley Lake; (2) a new powerhouse at
the base of the existing Hidden dam
containing a 2.48-megawatt turbinegenerator; (3) a new estimated 0.25mile-long primary transmission line
connecting the project to Pacific Gas
and Electric Company’s transmission
lines west of the project; and; (4)
appurtenant facilities. The proposed
project would have an estimated average
annual generation of 9,350 megawatthours and operate utilizing releases
from Lake Hensley, as directed by the
Corps.
Applicant Contact: Mr. Kurt Johnson,
Telluride Energy, LLC, 100 West
Colorado, Suite 222, P.O. Box 1646,
Telluride, CO 81435; phone: (970) 729–
5051.
FERC Contact: Shana Murray; phone:
(202) 502–8333.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
26749
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14577) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: May 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10610 Filed 5–8–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14571–000]
Archon Energy 1, Inc.: Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
On December 16, 2013, Archon
Energy 1, Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Stony Creek Hydropower Project (Stony
Creek Project or project) to be located on
Stony Creek, near the city of Orland,
Glenn County, California. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
E:\FR\FM\09MYN1.SGM
09MYN1
ehiers on DSK2VPTVN1PROD with NOTICES
26750
Federal Register / Vol. 79, No. 90 / Friday, May 9, 2014 / Notices
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 650-feet-wide and
up to 7-feet-high concrete diversion
structure; (2) a 6-mile-long penstock that
would feed up to five, 1-mile-long
pressurized, reinforced concrete pipes
creating approximately 125 feet of head;
(3) a powerhouse, containing up to four
turbine-generators; and (4) an undefined
interconnection point to the grid within
five to eight miles of the proposed
powerhouse. The estimated annual
generation of the Stony Creek Project
would be 100,000 megawatt-hours.
Applicant Contact: Mr. Paul Grist,
President, Archon Energy 1, Inc., 101 E.
Kennedy Blvd., Suite 2800, Tampa,
Florida 33602; phone: (415) 377–2460.
FERC Contact: Shana Murray; phone:
(202) 502–8333.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14571–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14571) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
VerDate Mar<15>2010
14:53 May 08, 2014
Jkt 232001
Dated: May 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10613 Filed 5–8–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9014–8]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 04/28/2014 through 05/02/2014
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20140132, Final EIS, FHWA,
TX, Grand Parkway Segments H and
I–1, Review Period Ends: 06/09/2014,
Contact: Gregory S. Punske 512–536–
5900.
EIS No. 20140133, Final EIS, FERC, LA,
Cameron Liquefaction Project, Review
Period Ends: 06/09/2014, Contact:
Danny Laffoon 202–502–6257.
EIS No. 20140134, Draft Supplement,
BPA, ID, Hooper Springs
Transmission Project, Comment
Period Ends: 08/07/2014, Contact:
Tish Eaton 503–230–3469.
EIS No. 20140135, Draft EIS, RUS, SC,
McClellanville 115 kV Transmission
Project, Comment Period Ends: 06/23/
2014, Contact: Lauren McGee
Rayburn 202–695–2540.
EIS No. 20140136, Draft EIS, FTA, WA,
Link Light Rail Operations and
Maintenance Satellite Facility,
Comment Period Ends: 06/23/2014,
Contact: James Saxton 206–220–7954.
EIS No. 20140137, Draft Supplement,
BLM, ID, Cottonwood Resource
Management Plan Amendment for
Domestic Sheep Grazing, Comment
Period Ends: 08/07/2014, Contact:
Scott Pavey 208–769–5059.
EIS No. 20140138, Final EIS, FHWA,
OH, Cleveland Opportunity Corridor,
Contact: Naureen Dar 614–280–6846.
Under MAP–21 section 1319, FHWA
has issued a single FEIS and ROD.
Therefore, the 30-day wait/review
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
period under NEPA does not apply to
this action.
EIS No. 20140139, Draft EIS, USAF, FL,
Gulf Regional Airspace Strategic
Initiative Landscape Initiative,
Comment Period Ends: 06/23/2014,
Contact: Michael Spaits 850–882–
2836.
EIS No. 20140140, Draft EIS,
CALTRANS, CA, Centennial Corridor
Project, Comment Period Ends: 07/08/
2014, Contact: Jennifer Taylor 559–
445–6455.
EIS No. 20140141, Final EIS, NPS, NJ,
Gateway National Recreation Area
Final General Management Plan,
Review Period Ends: 06/09/2014,
Contact: Jennifer Nersesian 718–354–
4664.
EIS No. 20140142, Draft Supplement,
STB, UT, Six County Association of
Governments Proposed Rail Line
between Levan and Salina, Comment
Period Ends: 06/23/2014, Contact:
Phillis Johnson-Ball 202–245–0304.
EIS No. 20140143, Draft EIS, BR, CA,
Contra Loma Reservoir and Recreation
Area Resource Management Plan,
Comment Period Ends: 07/02/2014,
Contact: David Woolley 559–487–
5049.
EIS No. 20140144, Draft EIS, USMC, BR,
CA, Santa Margarita River
Conjunctive Use Project, Comment
Period Ends: 06/23/2014, Contact:
Kristin Thomas 760–725–9741.
The U.S. Department of Defense’s
Marine Corps and the U.S. Department
of the Interior’s Bureau of Reclamation
are joint lead agencies for the above
project.
EIS No. 20140145, Final EIS, USFS, CO,
Cumbres Vegetation Management
Project, Review Period Ends: 06/20/
2014, Contact: Diana McGinn 719–
852–6241.
Amended Notices
EIS No. 20140086, Draft EIS, USFS, ID,
Upper North Fork HFRA Ecosystem
Restoration Project, Comment Period
Ends: 05/05/2014, Contact: Maggie
Seaberg 208–756–2711. Revision to
FR Notice Published 3/21/2014;
Extending Comment Period from 5/5/
2014 to 5/19/2014.
EIS No. 20140087, Final EIS, FHWA,
TX, Trinity Parkway, From IH–35E/
SH–183 to US–17/SH–310, Review
Period Ends: 05/09/2014, Contact:
Salvador Deocampo 512–536–5950.
Revision to the FR Notice Published
3/21/2014; Extending Review Period
from 05/05/2014 to 05/09/2014.
E:\FR\FM\09MYN1.SGM
09MYN1
Agencies
[Federal Register Volume 79, Number 90 (Friday, May 9, 2014)]
[Notices]
[Pages 26749-26750]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10613]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14571-000]
Archon Energy 1, Inc.: Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions to Intervene, and
Competing Applications
On December 16, 2013, Archon Energy 1, Inc. filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Stony Creek
Hydropower Project (Stony Creek Project or project) to be located on
Stony Creek, near the city of Orland, Glenn County, California. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary
[[Page 26750]]
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) A 650-
feet-wide and up to 7-feet-high concrete diversion structure; (2) a 6-
mile-long penstock that would feed up to five, 1-mile-long pressurized,
reinforced concrete pipes creating approximately 125 feet of head; (3)
a powerhouse, containing up to four turbine-generators; and (4) an
undefined interconnection point to the grid within five to eight miles
of the proposed powerhouse. The estimated annual generation of the
Stony Creek Project would be 100,000 megawatt-hours.
Applicant Contact: Mr. Paul Grist, President, Archon Energy 1,
Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602; phone:
(415) 377-2460.
FERC Contact: Shana Murray; phone: (202) 502-8333.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14571-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14571) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: May 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10613 Filed 5-8-14; 8:45 am]
BILLING CODE 6717-01-P