Archon Energy 1, Inc.: Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 26749-26750 [2014-10613]

Download as PDF ehiers on DSK2VPTVN1PROD with NOTICES Federal Register / Vol. 79, No. 90 / Friday, May 9, 2014 / Notices would take water from the existing Eastman Lake; (2) a new powerhouse at the base of the existing Buchanan dam containing a 2.98-megawatt turbinegenerator; (3) a new estimated 0.5-milelong primary transmission line connecting the project to Pacific Gas and Electric Company’s transmission lines south of the project; and; (4) appurtenant facilities. The proposed project would have an estimated average annual generation of 11,258 megawatthours and operate utilizing releases from Eastman Lake, as directed by the Corps. Applicant Contact: Mr. Kurt Johnson, Telluride Energy, LLC, 100 West Colorado, Suite 222, P.O. Box 1646, Telluride, CO 81435; phone: (970) 729– 5051. FERC Contact: Shana Murray; phone: (202) 502–8333. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14578) in the docket number field to access the document. For assistance, contact FERC Online Support. VerDate Mar<15>2010 14:53 May 08, 2014 Jkt 232001 Dated: May 1, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10616 Filed 5–8–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14577–000] Telluride Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 15, 2014, Telluride Energy, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Hidden Dam Hydroelectric Project (Hidden Dam Project or project) at the U.S. Army Corps of Engineers’ (Corps) Lake Hensley and Hidden dam on the Fresno River, near the city of Madera in Madera County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new penstock that would take water from the existing Hensley Lake; (2) a new powerhouse at the base of the existing Hidden dam containing a 2.48-megawatt turbinegenerator; (3) a new estimated 0.25mile-long primary transmission line connecting the project to Pacific Gas and Electric Company’s transmission lines west of the project; and; (4) appurtenant facilities. The proposed project would have an estimated average annual generation of 9,350 megawatthours and operate utilizing releases from Lake Hensley, as directed by the Corps. Applicant Contact: Mr. Kurt Johnson, Telluride Energy, LLC, 100 West Colorado, Suite 222, P.O. Box 1646, Telluride, CO 81435; phone: (970) 729– 5051. FERC Contact: Shana Murray; phone: (202) 502–8333. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 26749 intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14577) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 1, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10610 Filed 5–8–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14571–000] Archon Energy 1, Inc.: Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On December 16, 2013, Archon Energy 1, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Stony Creek Hydropower Project (Stony Creek Project or project) to be located on Stony Creek, near the city of Orland, Glenn County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary E:\FR\FM\09MYN1.SGM 09MYN1 ehiers on DSK2VPTVN1PROD with NOTICES 26750 Federal Register / Vol. 79, No. 90 / Friday, May 9, 2014 / Notices permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 650-feet-wide and up to 7-feet-high concrete diversion structure; (2) a 6-mile-long penstock that would feed up to five, 1-mile-long pressurized, reinforced concrete pipes creating approximately 125 feet of head; (3) a powerhouse, containing up to four turbine-generators; and (4) an undefined interconnection point to the grid within five to eight miles of the proposed powerhouse. The estimated annual generation of the Stony Creek Project would be 100,000 megawatt-hours. Applicant Contact: Mr. Paul Grist, President, Archon Energy 1, Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602; phone: (415) 377–2460. FERC Contact: Shana Murray; phone: (202) 502–8333. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14571–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14571) in the docket number field to access the document. For assistance, contact FERC Online Support. VerDate Mar<15>2010 14:53 May 08, 2014 Jkt 232001 Dated: May 1, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10613 Filed 5–8–14; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9014–8] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 04/28/2014 through 05/02/2014 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20140132, Final EIS, FHWA, TX, Grand Parkway Segments H and I–1, Review Period Ends: 06/09/2014, Contact: Gregory S. Punske 512–536– 5900. EIS No. 20140133, Final EIS, FERC, LA, Cameron Liquefaction Project, Review Period Ends: 06/09/2014, Contact: Danny Laffoon 202–502–6257. EIS No. 20140134, Draft Supplement, BPA, ID, Hooper Springs Transmission Project, Comment Period Ends: 08/07/2014, Contact: Tish Eaton 503–230–3469. EIS No. 20140135, Draft EIS, RUS, SC, McClellanville 115 kV Transmission Project, Comment Period Ends: 06/23/ 2014, Contact: Lauren McGee Rayburn 202–695–2540. EIS No. 20140136, Draft EIS, FTA, WA, Link Light Rail Operations and Maintenance Satellite Facility, Comment Period Ends: 06/23/2014, Contact: James Saxton 206–220–7954. EIS No. 20140137, Draft Supplement, BLM, ID, Cottonwood Resource Management Plan Amendment for Domestic Sheep Grazing, Comment Period Ends: 08/07/2014, Contact: Scott Pavey 208–769–5059. EIS No. 20140138, Final EIS, FHWA, OH, Cleveland Opportunity Corridor, Contact: Naureen Dar 614–280–6846. Under MAP–21 section 1319, FHWA has issued a single FEIS and ROD. Therefore, the 30-day wait/review PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 period under NEPA does not apply to this action. EIS No. 20140139, Draft EIS, USAF, FL, Gulf Regional Airspace Strategic Initiative Landscape Initiative, Comment Period Ends: 06/23/2014, Contact: Michael Spaits 850–882– 2836. EIS No. 20140140, Draft EIS, CALTRANS, CA, Centennial Corridor Project, Comment Period Ends: 07/08/ 2014, Contact: Jennifer Taylor 559– 445–6455. EIS No. 20140141, Final EIS, NPS, NJ, Gateway National Recreation Area Final General Management Plan, Review Period Ends: 06/09/2014, Contact: Jennifer Nersesian 718–354– 4664. EIS No. 20140142, Draft Supplement, STB, UT, Six County Association of Governments Proposed Rail Line between Levan and Salina, Comment Period Ends: 06/23/2014, Contact: Phillis Johnson-Ball 202–245–0304. EIS No. 20140143, Draft EIS, BR, CA, Contra Loma Reservoir and Recreation Area Resource Management Plan, Comment Period Ends: 07/02/2014, Contact: David Woolley 559–487– 5049. EIS No. 20140144, Draft EIS, USMC, BR, CA, Santa Margarita River Conjunctive Use Project, Comment Period Ends: 06/23/2014, Contact: Kristin Thomas 760–725–9741. The U.S. Department of Defense’s Marine Corps and the U.S. Department of the Interior’s Bureau of Reclamation are joint lead agencies for the above project. EIS No. 20140145, Final EIS, USFS, CO, Cumbres Vegetation Management Project, Review Period Ends: 06/20/ 2014, Contact: Diana McGinn 719– 852–6241. Amended Notices EIS No. 20140086, Draft EIS, USFS, ID, Upper North Fork HFRA Ecosystem Restoration Project, Comment Period Ends: 05/05/2014, Contact: Maggie Seaberg 208–756–2711. Revision to FR Notice Published 3/21/2014; Extending Comment Period from 5/5/ 2014 to 5/19/2014. EIS No. 20140087, Final EIS, FHWA, TX, Trinity Parkway, From IH–35E/ SH–183 to US–17/SH–310, Review Period Ends: 05/09/2014, Contact: Salvador Deocampo 512–536–5950. Revision to the FR Notice Published 3/21/2014; Extending Review Period from 05/05/2014 to 05/09/2014. E:\FR\FM\09MYN1.SGM 09MYN1

Agencies

[Federal Register Volume 79, Number 90 (Friday, May 9, 2014)]
[Notices]
[Pages 26749-26750]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10613]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14571-000]


Archon Energy 1, Inc.: Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions to Intervene, and 
Competing Applications

    On December 16, 2013, Archon Energy 1, Inc. filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act (FPA), proposing to study the feasibility of the Stony Creek 
Hydropower Project (Stony Creek Project or project) to be located on 
Stony Creek, near the city of Orland, Glenn County, California. The 
sole purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary

[[Page 26750]]

permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A 650-
feet-wide and up to 7-feet-high concrete diversion structure; (2) a 6-
mile-long penstock that would feed up to five, 1-mile-long pressurized, 
reinforced concrete pipes creating approximately 125 feet of head; (3) 
a powerhouse, containing up to four turbine-generators; and (4) an 
undefined interconnection point to the grid within five to eight miles 
of the proposed powerhouse. The estimated annual generation of the 
Stony Creek Project would be 100,000 megawatt-hours.
    Applicant Contact: Mr. Paul Grist, President, Archon Energy 1, 
Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602; phone: 
(415) 377-2460.
    FERC Contact: Shana Murray; phone: (202) 502-8333.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14571-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14571) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10613 Filed 5-8-14; 8:45 am]
BILLING CODE 6717-01-P