Copper Valley Electric Association, Inc.; Notice of Application To Amend License and Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 26748 [2014-10612]
Download as PDF
26748
Federal Register / Vol. 79, No. 90 / Friday, May 9, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13124–015]
ehiers on DSK2VPTVN1PROD with NOTICES
Copper Valley Electric Association,
Inc.; Notice of Application To Amend
License and Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
to License.
b. Project No: 13124–015.
c. Date Filed: April 14, 2014.
d. Applicant: Copper Valley Electric
Association, Inc.
e. Name of Project: Allison Creek
Hydroelectric Project.
f. Location: On Allison Creek in
Valdez, Alaska. This project does not
occupy any federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Robert A.
Wilkinson, CEO, Copper Valley Electric
Association, Inc., P.O. Box 45, Mile 187
Glenn Highway, Glennallen, AK 99588,
(907) 822–3211.
i. FERC Contact: Steven Sachs at (202)
502–8666; or Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 30
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file any motion
to intervene, protest, comments, and/or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13124–005.
k. Description of Request: As licensed,
the unconstructed project includes two
3.25-megawatt (MW) turbine-generator
units, a 120-foot-long tailrace exiting the
west side of the powerhouse, and a 3.8mile-long, 34.5-kilovolt (kV)
transmission line following an existing
VerDate Mar<15>2010
14:53 May 08, 2014
Jkt 232001
right-of-way. In its application, the
licensee proposes to install a single 6.5MW turbine-generator unit, construct a
70.5-foot-long tailrace extending from
the north side of the powerhouse, and
erect a 3.8-mile-long, 25-kV
transmission line south of the original
location and following a utility
easement entirely on land owned by the
State of Alaska. The new transmission
line routing would interconnect with
the grid at the same location as
originally proposed.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P–13124 in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208- 3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and at the Commission’s Public
Reference Room, located at 888 First
Street NE., Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10612 Filed 5–8–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14578–000]
Telluride Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 15, 2014, Telluride
Energy, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Buchanan
Dam Hydroelectric Project (Buchanan
Dam Project or project) at the U.S. Army
Corps of Engineers’ (Corps) Eastman
Lake and Buchanan dam on the
Chowchilla River, near the city of
Chowchilla in Madera County,
California. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new penstock that
E:\FR\FM\09MYN1.SGM
09MYN1
Agencies
[Federal Register Volume 79, Number 90 (Friday, May 9, 2014)]
[Notices]
[Page 26748]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10612]
[[Page 26748]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13124-015]
Copper Valley Electric Association, Inc.; Notice of Application
To Amend License and Accepted for Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment to License.
b. Project No: 13124-015.
c. Date Filed: April 14, 2014.
d. Applicant: Copper Valley Electric Association, Inc.
e. Name of Project: Allison Creek Hydroelectric Project.
f. Location: On Allison Creek in Valdez, Alaska. This project does
not occupy any federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley
Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway,
Glennallen, AK 99588, (907) 822-3211.
i. FERC Contact: Steven Sachs at (202) 502-8666; or
Steven.Sachs@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice by the
Commission. The Commission strongly encourages electronic filing.
Please file any motion to intervene, protest, comments, and/or
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13124-005.
k. Description of Request: As licensed, the unconstructed project
includes two 3.25-megawatt (MW) turbine-generator units, a 120-foot-
long tailrace exiting the west side of the powerhouse, and a 3.8-mile-
long, 34.5-kilovolt (kV) transmission line following an existing right-
of-way. In its application, the licensee proposes to install a single
6.5-MW turbine-generator unit, construct a 70.5-foot-long tailrace
extending from the north side of the powerhouse, and erect a 3.8-mile-
long, 25-kV transmission line south of the original location and
following a utility easement entirely on land owned by the State of
Alaska. The new transmission line routing would interconnect with the
grid at the same location as originally proposed.
l. Locations of the Application: This filing may be viewed on the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P-13124 in the docket number field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208- 3676 or email FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above and at the Commission's
Public Reference Room, located at 888 First Street NE., Room 2A,
Washington, DC 20426, or by calling (202) 502-8371.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license amendment.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10612 Filed 5-8-14; 8:45 am]
BILLING CODE 6717-01-P