Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 26241-26242 [2014-10423]
Download as PDF
Federal Register / Vol. 79, No. 88 / Wednesday, May 7, 2014 / Notices
your search to documents published by
the Department.
Lynn B. Mahaffie,
Senior Director, Policy Coordination,
Development, and Accreditation Service,
delegated the authority to perform the
functions and duties of the Assistant
Secretary for Postsecondary Education.
[FR Doc. 2014–10495 Filed 5–6–14; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Environmental Management Advisory
Board Meeting
Department of Energy.
Notice of open meeting.
AGENCY:
ACTION:
This notice announces a
meeting of the Environmental
Management Advisory Board (EMAB).
The Federal Advisory Committee Act
(Pub. L. 92–463, 86 Stat. 770) requires
that public notice of this meeting be
announced in the Federal Register.
DATES: Thursday, May 22, 2014 9:30
a.m.–4:30 p.m.
ADDRESSES: Pacific Northwest National
Laboratory, 902 Battelle Boulevard,
Richland, Washington 99354.
FOR FURTHER INFORMATION CONTACT:
Kristen G. Ellis, Designated Federal
Officer, EMAB (EM–3.2), U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585. Phone (202)
586–5810; fax (202) 586–0293 or email:
kristen.ellis@em.doe.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
EMAB is to provide the Assistant
Secretary for Environmental
Management (EM) with advice and
recommendations on corporate issues
confronting the EM program. EMAB
contributes to the effective operation of
the program by providing individual
citizens and representatives of
interested groups an opportunity to
present their views on issues facing EM
and by helping to secure consensus
recommendations on those issues.
Tentative Agenda Topics:
• EM Program Update
• Advanced Simulation Capability of
Environmental Management
Demonstration
• Updates on EMAB Work Plan
Assignments
Æ Science and Technology
Æ Risk and Risk Communications
Æ Acquisition and Project
Management
Æ Management Excellence
Public Participation: EMAB welcomes
the attendance of the public at its
pmangrum on DSK3VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
15:11 May 06, 2014
Jkt 232001
advisory committee meetings and will
make every effort to accommodate
persons with physical disabilities or
special needs. If you require special
accommodations due to a disability,
please contact Kristen G. Ellis at least
seven days in advance of the meeting at
the phone number or email address
listed above. Written statements may be
filed with the Board either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
the agenda should contact Kristen G.
Ellis at the address or telephone number
listed above. Requests must be received
five days prior to the meeting and
reasonable provision will be made to
include the presentation in the agenda.
The Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Kristen G. Ellis at the
address or phone number listed above.
Minutes will also be available at the
following Web site: https://energy.gov/
em/services/communicationengagement/environmentalmanagement-advisory-board-emab.
Issued at Washington, DC, on May 1, 2014.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2014–10526 Filed 5–6–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2146–160]
Alabama Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Non-project
use of project lands and waters.
b. Project No: 2146–160.
c. Date Filed: March 25, 2014.
d. Applicant: Alabama Power
Company.
e. Name of Project: Coosa River
Project.
f. Location: The project is located on
the Coosa River, in Cherokee, Etowah,
Calhoun, St. Clair, Talladega, Shelby,
Coosa, Chilton, and Elmore counties,
Alabama, and Floyd County, Georgia.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
26241
The proposed action would occur on the
Logan Martin Development, in Lincoln
(Talladega County), Alabama.
g. Pursuant to: Federal Power Act, 16
U.S.C. 791a—825r.
h. Applicant Contact: Mr. Matthew J.
Akin, Alabama Power Company, 600
18th Street North, Birmingham, AL
35203, telephone 205–257–1000.
i. FERC Contact: Mr. Lorance Yates at
678–245–3084 or email: lorance.yates@
ferc.gov.
j. Deadline for filing comments and/
or motions: May 30, 2014.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–2146–160) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Application:
Alabama Power Company proposes to
permit Cathy Harris to use project land
and waters for development of the
England Isles RV park/campground by
installing two new docks for common
use: One (1) dock with 4 slips and 16
cleats, accommodating no more than 8
vessels; one (1) courtesy dock 50′ in
length with 2 cleats and accommodating
no more than 2 vessels. Additionally
eleven (11) RV lots will be platted out
with water, sewer and power provided
to each lot. Each RV lot will have a
gravel pad and one 50′ pier. The RV
E:\FR\FM\07MYN1.SGM
07MYN1
pmangrum on DSK3VPTVN1PROD with NOTICES
26242
Federal Register / Vol. 79, No. 88 / Wednesday, May 7, 2014 / Notices
sites will be rented by the year and will
have a full time manager. Each RV will
be placed on a gravel pad on natural
ground and there will be no grading or
other dirt work.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
202–502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits
(P–2146) in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call 202–502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
VerDate Mar<15>2010
15:11 May 06, 2014
Jkt 232001
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: April 30, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10423 Filed 5–6–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC14–81–000.
Applicants: NatGen Southeast Power
LLC, Calpine Oneta Power, LLC,
Decatur Energy Center, LLC, MOBILE
ENERGY LLC, Santa Rosa Energy
Center, LLC, Calpine Energy Services,
L.P.
Description: Joint Application for
Approval Under Section 203 of the
Federal Power Act and Request for
Expedited Action of NatGen Southeast
Power LLC, et al.
Filed Date: 4/28/14.
Accession Number: 20140428–5361.
Comments Due: 5 p.m. ET 5/19/14.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1852–007.
Applicants: Florida Power & Light
Company.
Description: Notice of Non-material
Change in Status of Florida Power &
Light Company.
Filed Date: 4/28/14.
Accession Number: 20140428–5212.
Comments Due: 5 p.m. ET 5/19/14.
Docket Numbers: ER10–3097–002.
Applicants: Bruce Power Inc.
Description: Notice of Non-Material
Change in Status of Bruce Power Inc.
Filed Date: 4/28/14.
Accession Number: 20140428–5358.
Comments Due: 5 p.m. ET 5/19/14.
Docket Numbers: ER14–1786–000.
Applicants: Southwestern Public
Service Company.
Description: 2014–4–28_SPS–BCEC–
GSEC–CA–KELLEY–669–0.0.0 to be
effective 4/29/2014.
Filed Date: 4/28/14.
Accession Number: 20140428–5292.
Comments Due: 5 p.m. ET 5/19/14.
Docket Numbers: ER14–1787–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Queue Position Y2–067;
Original SA No. 3806 & Cancellation of
SA No. 2429 to be effective 3/28/2014.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Filed Date: 4/28/14.
Accession Number: 20140428–5293.
Comments Due: 5 p.m. ET 5/19/14.
Docket Numbers: ER14–1788–000.
Applicants: MidAmerican Energy
Company.
Description: Service Agreement 333
Termination—Clipper—Fowler Wind to
be effective 4/29/2014.
Filed Date: 4/28/14.
Accession Number: 20140428–5306.
Comments Due: 5 p.m. ET 5/19/14.
Docket Numbers: ER14–1789–000.
Applicants: California Independent
System Operator Corporation.
Description: 2014–04–28_NCPA_
MSSA to be effective 5/1/2014.
Filed Date: 4/28/14.
Accession Number: 20140428–5312.
Comments Due: 5 p.m. ET 5/19/14.
Docket Numbers: ER14–1790–000.
Applicants: California Independent
System Operator Corporation.
Description: 2014–04–28_SVP_
MSSA_Amendment to be effective 5/1/
2014.
Filed Date: 4/28/14.
Accession Number: 20140428–5314.
Comments Due: 5 p.m. ET 5/19/14.
Docket Numbers: ER14–1791–000.
Applicants: Footprint Power Salem
Harbor Operations.
Description: Footprint Cancellation
Filing to be effective 6/1/2014.
Filed Date: 4/29/14.
Accession Number: 20140429–5045.
Comments Due: 5 p.m. ET 5/20/14.
Docket Numbers: ER14–1792–000.
Applicants: Pinnacle Power, LLC.
Description: Pinnacle Power, LLC
Market Based Rates Application to be
effective 6/1/2014.
Filed Date: 4/29/14.
Accession Number: 20140429–5049.
Comments Due: 5 p.m. ET 5/20/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\07MYN1.SGM
07MYN1
Agencies
[Federal Register Volume 79, Number 88 (Wednesday, May 7, 2014)]
[Notices]
[Pages 26241-26242]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10423]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2146-160]
Alabama Power Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Non-project use of project lands and
waters.
b. Project No: 2146-160.
c. Date Filed: March 25, 2014.
d. Applicant: Alabama Power Company.
e. Name of Project: Coosa River Project.
f. Location: The project is located on the Coosa River, in
Cherokee, Etowah, Calhoun, St. Clair, Talladega, Shelby, Coosa,
Chilton, and Elmore counties, Alabama, and Floyd County, Georgia. The
proposed action would occur on the Logan Martin Development, in Lincoln
(Talladega County), Alabama.
g. Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r.
h. Applicant Contact: Mr. Matthew J. Akin, Alabama Power Company,
600 18th Street North, Birmingham, AL 35203, telephone 205-257-1000.
i. FERC Contact: Mr. Lorance Yates at 678-245-3084 or email:
lorance.yates@ferc.gov.
j. Deadline for filing comments and/or motions: May 30, 2014.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
Please include the project number (P-2146-160) on any comments,
motions, or recommendations filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Application: Alabama Power Company proposes to
permit Cathy Harris to use project land and waters for development of
the England Isles RV park/campground by installing two new docks for
common use: One (1) dock with 4 slips and 16 cleats, accommodating no
more than 8 vessels; one (1) courtesy dock 50' in length with 2 cleats
and accommodating no more than 2 vessels. Additionally eleven (11) RV
lots will be platted out with water, sewer and power provided to each
lot. Each RV lot will have a gravel pad and one 50' pier. The RV
[[Page 26242]]
sites will be rented by the year and will have a full time manager.
Each RV will be placed on a gravel pad on natural ground and there will
be no grading or other dirt work.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling 202-502-8371. This filing may also be viewed on
the Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits (P-2146)
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call 202-502-8659. A copy is also
available for inspection and reproduction at the address in item (h)
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: April 30, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10423 Filed 5-6-14; 8:45 am]
BILLING CODE 6717-01-P