Rugraw, LLC: Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 25857 [2014-10338]
Download as PDF
25857
Federal Register / Vol. 79, No. 87 / Tuesday, May 6, 2014 / Notices
API GRAVITY RANGES
≤20.0
20.1 to 30.0
30.1 to 35.0
35.1 to 40.0
Note that it is expected that the
‘‘unknown’’ category will be rarely used
by the respondent companies, typically
under exceptional and temporary
circumstances.
(5) Estimated Number of Survey
Respondents: 600 respondents.
(6) Annual Estimated Number of
Total Responses: The annual number of
total responses is 7200. Annual
Estimated Number of Burden Hours:
The annual estimated burden is 21,600
hours.
(7) Annual Estimated Reporting and
Recordkeeping Cost Burden: Additional
costs to respondents are not anticipated
beyond costs associated with response
burden hours.
(8) Comments submitted in response
to this notice will be summarized and/
or included in the request for OMB
approval of the form. They also will
become a matter of public record.
Statutory Authority: Section 13(b) of
the Federal Energy Administration Act
of 1974, Pub. L. 93–275, codified at 15
U.S.C. 772(b).
Issued in Washington, DC on April 30,
2014.
Stephen J. Harvey,
Assistant Administrator for Energy Statistics,
U.S. Energy Information Administration.
[FR Doc. 2014–10352 Filed 5–5–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12496–002]
sroberts on DSK5SPTVN1PROD with NOTICES
Rugraw, LLC: Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major original
license
b. Project No.: 12496–002
c. Date filed: April 21, 2014
d. Applicant: Rugraw, LLC
e. Name of Project: Lassen Lodge
Hydroelectric Project
f. Location: On the South Fork Battle
Creek, nearby the Town of Mineral,
Tehama County, California. No federal
lands or Indian reservations are located
within the proposed project boundary.
VerDate Mar<15>2010
17:34 May 05, 2014
Jkt 232001
40.1 to 45.0
45.1 to 50.0
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r)
h. Applicant Contact: Charlie Kuffner,
70 Paseo Mirasol, Tiburon, CA 94920;
(415) 652–8553
i. FERC Contact: Adam Beeco at (202)
502–8655; email—adam.beeco@ferc.gov
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: June 20, 2014
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–12496–002.
m. The application is not ready for
environmental analysis at this time.
n. The proposed Lassen Lodge Project
consists of: (1) A 6-foot-high and 94foot-long diversion dam; (2) an
impoundment of approximately 0.5
acre; (3) a 20 by 10 foot enclosed
concrete intake structure; (4) a 7,258foot-long pipeline and a 5,230-foot-long
PO 00000
Frm 00044
Fmt 4703
Sfmt 9990
50.1 to 55.0
≥55.0
unknown
penstock with a net head of 791 feet; (5)
a 50 by 50 foot powerhouse containing
one generating unit with a 5,000kilowatt capacity; (6) a 50 by 50 foot
substation area; (7) a 40 by 35 foot
switchyard; (8) 100 by 100 foot
multipurpose area; and (9) a new 12mile-long, 60-kilovolt transmission line.
The project is estimated to produce
approximately 25,000,000 kilowatthours annually.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Acceptance or Deficiency Letter.
Request Additional Information.
Issue Acceptance Letter ........
Issue Scoping Document 1
for Comments.
Request Additional Information (if necessary).
Issue Scoping Document 2
(if necessary).
Notice that application is
ready for environmental
analysis.
Notice of the availability of
the draft EA.
Notice of the availability of
the final EA.
June 2014
June 2014
September 2014
October 2014
December 2014
January 2015
January 2015
July 2015
October 2015
Dated: April 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10338 Filed 5–5–14; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 79, Number 87 (Tuesday, May 6, 2014)]
[Notices]
[Page 25857]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10338]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12496-002]
Rugraw, LLC: Notice of Application Tendered for Filing With the
Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major original license
b. Project No.: 12496-002
c. Date filed: April 21, 2014
d. Applicant: Rugraw, LLC
e. Name of Project: Lassen Lodge Hydroelectric Project
f. Location: On the South Fork Battle Creek, nearby the Town of
Mineral, Tehama County, California. No federal lands or Indian
reservations are located within the proposed project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r)
h. Applicant Contact: Charlie Kuffner, 70 Paseo Mirasol, Tiburon,
CA 94920; (415) 652-8553
i. FERC Contact: Adam Beeco at (202) 502-8655; email_
adam.beeco@ferc.gov
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: June 20, 2014
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-12496-002.
m. The application is not ready for environmental analysis at this
time.
n. The proposed Lassen Lodge Project consists of: (1) A 6-foot-high
and 94-foot-long diversion dam; (2) an impoundment of approximately 0.5
acre; (3) a 20 by 10 foot enclosed concrete intake structure; (4) a
7,258-foot-long pipeline and a 5,230-foot-long penstock with a net head
of 791 feet; (5) a 50 by 50 foot powerhouse containing one generating
unit with a 5,000-kilowatt capacity; (6) a 50 by 50 foot substation
area; (7) a 40 by 35 foot switchyard; (8) 100 by 100 foot multipurpose
area; and (9) a new 12-mile-long, 60-kilovolt transmission line. The
project is estimated to produce approximately 25,000,000 kilowatt-hours
annually.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Acceptance or Deficiency Letter.. June 2014
Request Additional Information......... June 2014
Issue Acceptance Letter................ September 2014
Issue Scoping Document 1 for Comments.. October 2014
Request Additional Information (if December 2014
necessary).
Issue Scoping Document 2 (if necessary) January 2015
Notice that application is ready for January 2015
environmental analysis.
Notice of the availability of the draft July 2015
EA.
Notice of the availability of the final October 2015
EA.
Dated: April 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10338 Filed 5-5-14; 8:45 am]
BILLING CODE 6717-01-P