FFP Project 10, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 25863-25864 [2014-10314]
Download as PDF
25863
Federal Register / Vol. 79, No. 87 / Tuesday, May 6, 2014 / Notices
Milestone
Target date
Comments on EA ....................................................................................................................................................................
Modified terms and conditions .................................................................................................................................................
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: April 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10312 Filed 5–5–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14583–000]
sroberts on DSK5SPTVN1PROD with NOTICES
ECOsponsible, Inc.: Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 3, 2014, ECOsponsible,
Inc filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Caughdenoy Lock Hydro Project
(Caughdenoy Project or project) to be
located on the Oneida River, near the
Town of Clay, in Onondaga County,
New York. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An existing
abandoned steam ship canal at the
Caughdenoy dam; (2) three turbines for
a total installed capacity of 3,000kilowatts; (3) a new 50-foot-long
transmission line from the powerhouse
to an existing 15-kilovolt grid
connection point located adjacent to
county Highway #33; and (4)
VerDate Mar<15>2010
17:34 May 05, 2014
Jkt 232001
appurtenant facilities. The estimated
annual generation of the Caughdenoy
Project would be 13,446 megawatthours.
Applicant Contact: Mr. Dennis Ryan,
Executive Director, ECOsponsible, Inc.,
120 Mitchell Road, Ease Aurora, New
York 14052; phone: (716) 655–3524.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14583–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14583) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: April 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10339 Filed 5–5–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
November 25, 2014.
January 24, 2015.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14595–000]
FFP Project 10, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 3, 2014, FFP Project 10,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Allegheny Lock and Dam #4
Hydroelectric Project (Allegheny #4
Project or project) to be located at the
U.S. Army Corps of Engineers’ (Corps)
Allegheny Lock and Dam #4 on the
Allegheny River in Allegheny County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new 150-foot-wide
by 200-foot-long intake; (2) a new 150foot-wide by 200-foot-long powerhouse;
(3) a new 150-foot-wide by 300-foot-long
tailrace; (4) new 250-foot-long and 150foot-long concrete retaining walls
upstream of the new intake and
downstream of the new powerhouse,
respectively; (5) three horizontal Kaplan
turbine-generators each rated at 5
megawatts; (6) a 20-megavolt-ampere,
4.16-kilovolt (kV)/69-kV three-phase
step-up transformer; (7) a new 40-footwide by 40-foot-long substation; and (8)
a new 69-kV transmission line
approximately 1,630 feet long from the
new substation to an existing substation.
The estimated annual generation of the
Allegheny #4 Project would be 89
gigawatt-hours.
Applicant Contact: Mr. Daniel
Lissner, FFP Project 10, LLC, 239
Causeway Street, Suite 300, Boston, MA
02114; phone: (978) 283–2822.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
E:\FR\FM\06MYN1.SGM
06MYN1
25864
Federal Register / Vol. 79, No. 87 / Tuesday, May 6, 2014 / Notices
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14595–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14595) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: April 29, 2014.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM01–5–000; RM95–3–000]
sroberts on DSK5SPTVN1PROD with NOTICES
Electronic Tariff Filings; Filing and
Reporting Requirements for Interstate
Natural Gas Company Rate Schedules
and Tariffs; Notice of Updated and
Combined Instruction Manuals
Take notice that today the
Commission’s Instruction Manual for
Electronic Filing of Rate Filings
(Instruction Manual) applicable to rate
filings made pursuant to Part 154 of the
Commission’s regulations 1 has been
updated. The updates reflect the
1 18 CFR part 154 (2013). The Instruction Manual
for Electronic Filing of Rate Filings was issued
pursuant to Filing and Reporting Requirements for
Interstate Natural Gas Company Rate Schedules
and Tariffs, Order No. 582, FERC Statutes and
Regulations, Regulations Preambles January 1991–
June 1996 ¶ 31,025 (1995).
17:34 May 05, 2014
Dated: April 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10315 Filed 5–5–14; 8:45 am]
BILLING CODE 6717–01–P
EQUAL EMPLOYMENT OPPORTUNITY
COMMISSION
Agency Information Collection
Activities: Proposed Collection;
Submission for OMB Review
Equal Employment
Opportunity Commission.
ACTION: Final Notice of Submission for
OMB Review—Extension Without
Change: Elementary-Secondary Staff
Information Report (EEO–5).
AGENCY:
In accordance with the
Paperwork Reduction Act (PRA), the
Equal Employment Opportunity
Commission (EEOC or Commission)
hereby gives notice that it has submitted
to the Office of Management and Budget
(OMB) a request for a three-year
extension without change of the
Elementary-Secondary Staff Information
Report (EEO–5).
DATES: Written comments on this notice
must be submitted on or before June 5,
2014.
ADDRESSES: A copy of this ICR and
applicable supporting documentation
submitted to OMB for this review may
be obtained from: Ronald Edwards,
Equal Employment Opportunity
Commission, Director, Program
Research and Surveys Division, 131 M
Street NE., Room 4SW30F, Washington,
DC 20507. Comments on this final
notice must be submitted to Chad A.
Lallemand, Office of Information and
SUMMARY:
[FR Doc. 2014–10314 Filed 5–5–14; 8:45 am]
VerDate Mar<15>2010
changes in electronic filing
requirements, data elements and
acceptable file types instituted by Order
No. 714 for tariff filings,2 and updated
contact information. In addition, the
Instruction Manual has been combined
with and made an Appendix to the
Implementation Guide for Electronic
Filing of Parts 35, 154, 284, 300, and
341 Tariff Filings.3 Other than the
addition of the Appendix, there are no
other changes to the Implementation
Guide.
For more information, contact Keith
Pierce, Office of Energy Market
Regulation at (202) 502–8525, or send
an email to FERConline@ferc.gov.
Jkt 232001
2 Electronic Tariff Filings, Order No. 714, FERC
Statutes and Regulations ¶ 31,276 (2008).
3 Implementation Guide for Electronic Filing of
Parts 35, 154, 284, 300, and 341 Tariff Filings
available at https://www.ferc.gov/docs-filing/etariff/
implementation-guide.pdf (Implementation Guide).
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
Regulatory Affairs, Office of
Management and Budget, 725 17th
Street NW., Room 10235, New
Executive Office Building, Washington,
DC 20503 or electronically mailed to
Chad_A._Lallemand@omb.eop.gov.
Copies of comments should be sent to
Bernadette Wilson, Acting Executive
Officer, Executive Secretariat, Equal
Employment Opportunity Commission,
131 M Street NE., Washington, DC
20507. As a convenience to
commenters, the Executive Secretariat
will accept comments totaling six or
fewer pages by facsimile (‘‘FAX’’)
machine. This limitation is necessary to
assure access to the equipment. The
telephone number of the fax receiver is
(202) 663–4114. (This is not a toll-free
number). Receipt of FAX transmittals
will not be acknowledged, except that
the sender may request confirmation of
receipt by calling the Executive
Secretariat staff at (202) 663–4070
(voice) or (202) 663–4074 (TTD). (These
are not toll-free telephone numbers.)
Instead of sending written comments to
EEOC, you may submit comments and
attachments electronically at https://
www.regulations.gov, which is the
Federal eRulemaking Portal. Follow the
instructions online for submitting
comments. All comments received
through this portal will be posted
without change, including any personal
information you provide. Copies of
comments submitted by the public to
EEOC directly or through the Federal
eRulemaking Portal will be available for
review, by advance appointment only,
at the Commission’s library between the
hours of 9:00 a.m. and 5:00 p.m. Eastern
Time or can be reviewed at https://
www.regulations.gov. To schedule an
appointment to inspect the comments at
EEOC’s library, contact the library staff
at (202) 663–4630 (voice) or (202) 663–
4641 (TTY). (These are not toll-free
numbers.)
FOR FURTHER INFORMATION CONTACT:
Ronald Edwards, Equal Employment
Opportunity Commission, Director,
Program Research and Surveys Division,
131 M Street NE., Room 4SW30F,
Washington, DC 20507; (202) 663–4949
(voice) or (202) 663–7063 (TTY).
SUPPLEMENTARY INFORMATION: A notice
that EEOC would be submitting this
request was published in the Federal
Register on January 28, 2014 allowing
for a 60-day public comment period.
There were no comments received from
the public.
Overview of Information Collection
Type of Review: Extension—No
change.
OMB Control No.: 3046–0003.
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 79, Number 87 (Tuesday, May 6, 2014)]
[Notices]
[Pages 25863-25864]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10314]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14595-000]
FFP Project 10, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On March 3, 2014, FFP Project 10, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Allegheny Lock and Dam
4 Hydroelectric Project (Allegheny 4 Project or
project) to be located at the U.S. Army Corps of Engineers' (Corps)
Allegheny Lock and Dam 4 on the Allegheny River in Allegheny
County, Pennsylvania. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) A new 150-
foot-wide by 200-foot-long intake; (2) a new 150-foot-wide by 200-foot-
long powerhouse; (3) a new 150-foot-wide by 300-foot-long tailrace; (4)
new 250-foot-long and 150-foot-long concrete retaining walls upstream
of the new intake and downstream of the new powerhouse, respectively;
(5) three horizontal Kaplan turbine-generators each rated at 5
megawatts; (6) a 20-megavolt-ampere, 4.16-kilovolt (kV)/69-kV three-
phase step-up transformer; (7) a new 40-foot-wide by 40-foot-long
substation; and (8) a new 69-kV transmission line approximately 1,630
feet long from the new substation to an existing substation. The
estimated annual generation of the Allegheny 4 Project would
be 89 gigawatt-hours.
Applicant Contact: Mr. Daniel Lissner, FFP Project 10, LLC, 239
Causeway Street, Suite 300, Boston, MA 02114; phone: (978) 283-2822.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of
[[Page 25864]]
intent to file competing applications: 60 days from the issuance of
this notice. Competing applications and notices of intent must meet the
requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14595-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14595) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: April 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10314 Filed 5-5-14; 8:45 am]
BILLING CODE 6717-01-P