Environmental Assessment and Finding of No Significant Impact; Final Issuance: Dominion Energy Kewaunee; Kewaunee Power Station, 25156-25158 [2014-10097]
Download as PDF
25156
Federal Register / Vol. 79, No. 85 / Friday, May 2, 2014 / Notices
Wilson Boulevard, Suite 1105,
Arlington, Virginia 22203 703/292–8900
Purpose of Meeting: To advise NSF on
the impact of its policies, programs and
activities on the CISE community. To
provide advice to the Assistant Director
for CISE on issues related to long-range
planning, and to form ad hoc
subcommittees and working groups to
carry out needed studies and tasks.
Agenda
• Overview of CISE FY 2015 budget
priorities
• CISE programmatic updates
• Updates from other NSF AC’s,
including CEOSE and ACCI
• Working group breakout sessions
• Discussion on Computer Science
Education and Workforce
Development
• Update from CISE Vision 2025
working group
´
• Discussion with Dr. France Cordova
• Closing remarks and wrap up
Dated: April 28, 2014.
Suzanne Plimpton,
Acting, Committee Management Officer.
[FR Doc. 2014–09993 Filed 5–1–14; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. NRC–2014–0015]
Agency Information Collection
Activities: Submission for the Office of
Management and Budget (OMB)
Review; Comment Request
Nuclear Regulatory
Commission.
ACTION: Notice of the OMB review of
information collection and solicitation
of public comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has recently
submitted to OMB for review the
following proposal for the collection of
information under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35). The NRC hereby
informs potential respondents that an
agency may not conduct or sponsor, and
that a person is not required to respond
to, a collection of information unless it
displays a currently valid OMB control
number. The NRC published a Federal
Register notice with a 60-day comment
period on this information collection on
February 5, 2014.
1. Type of submission, new, revision,
or extension: Revision.
2. The title of the information
collection: NRC Form 5, ‘‘Occupational
Dose Record for a Monitoring Period.’’
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
00:23 May 02, 2014
Jkt 232001
3. Current OMB approval number:
3150–0006.
4. The form number if applicable:
NRC Form 5.
5. How often the collection is
required: Annually.
6. Who will be required or asked to
report: NRC licensees who are required
to comply with Part 20 of Title 10 of the
Code of Federal Regulations (10 CFR).
7. An estimate of the number of
annual responses: 4,346 (200 reporting
responses plus 4,146 recordkeepers).
8. The estimated number of annual
respondents: 4,146 respondents (104
reactors plus 4,042 materials licensees).
9. An estimate of the total number of
hours needed annually to complete the
requirement or request: 130,852 hours
(6,000 hours reporting plus 124,852
hours recordkeeping).
10. Abstract: NRC Form 5 is used to
record and report the results of
individual monitoring for occupational
radiation exposure during a monitoring
(one calendar year) period to ensure
regulatory compliance with annual
radiation dose limits specified in 10
CFR 20.1201.
The public may examine and have
copied for a fee, publicly-available
documents, including the final
supporting statement, at the NRC’s
Public Document Room, Room O–1F21,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852. The
OMB clearance requests are available at
the NRC’s Web site: https://www.nrc.gov/
public-involve/doc-comment/omb/. The
document will be available on the
NRC’s home page site for 60 days after
the signature date of this notice.
Comments and questions should be
directed to the OMB reviewer listed
below by June 4, 2014. Comments
received after this date will be
considered if it is practical to do so, but
assurance of consideration cannot be
given to comments received after this
date.
Danielle Y. Jones, Desk Officer, Office
of Information and Regulatory Affairs
(3150–0006), NEOB–10202, Office of
Management and Budget, Washington,
DC 20503.
Comments can also be emailed to
Danielle_Y_Jones@omb.eop.gov or
submitted by telephone at 202–395–
1741.
The Acting NRC Clearance Officer is
Kristen Benney, telephone: 301–415–
6355.
Dated at Rockville, Maryland, this 28th day
of April, 2014.
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
For the Nuclear Regulatory Commission.
Kristen Benney,
Acting NRC Clearance Officer, Office of
Information Services.
[FR Doc. 2014–10112 Filed 5–1–14; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–305; NRC–2013–0056]
Environmental Assessment and
Finding of No Significant Impact; Final
Issuance: Dominion Energy
Kewaunee; Kewaunee Power Station
Nuclear Regulatory
Commission.
ACTION: Environmental assessment and
finding of no significant impact; final
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of exemptions in response to
an April 4, 2013, request from Dominion
Energy Kewaunee (DEK, the licensee).
One exemption would permit the
licensee to use a portion of the funds
from the Kewaunee Power Station (KPS)
decommissioning trust fund (Trust) for
irradiated fuel management activities.
Another exemption would allow the
licensee to make the withdrawals from
the Trust for irradiated fuel management
activities without prior notification to
the NRC. The NRC staff is issuing an
Environmental Assessment and Finding
of No Significant Impact associated with
the proposed exemptions.
ADDRESSES: Please refer to Docket ID
NRC–2013–0056 when contacting the
NRC about the availability of
information regarding this document.
You may access publicly-available
information related to this document
using any of the following methods:
• Federal rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0056. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search’’. For problems with ADAMS,
please contact the NRC’s Public
SUMMARY:
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 79, No. 85 / Friday, May 2, 2014 / Notices
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this notice (if
that document is available in ADAMS)
is provided the first time that a
document is referenced. The request for
exemption, dated April 4, 2013, is
available electronically under ADAMS
Accession No. ML13098A031. The
supplement, dated November 6, 2013, is
available at ADAMS Accession No.
ML13312A916.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
William Huffman, Office of Nuclear
Reactor Regulation, 301–415–2046;
William.Huffman@nrc.gov; U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering issuance of
exemptions from Part 50, Section
82(a)(8)(i)(A) and 10 CFR Part 50
Section 75(h)(1)(iv) of Title 10 of the
Code of Federal Regulations (10 CFR)
for Renewed Facility Operating License
No. DPR–43, issued to Dominion Energy
Kewaunee (DEK, the licensee), for the
Kewaunee Power Station located in
Kewaunee County, Wisconsin. The
licensee requested the exemptions by
letter dated April 4, 2013, and
supplemented its request by letter dated
November 6, 2013. The exemptions
would allow the licensee to use a
portion of the funds from the KPS Trust
for irradiated fuel management activities
without prior notification to the NRC.
Consistent with 10 CFR 51.21, the NRC
has reviewed the requirements in 10
CFR 51.20(b) and 10 CFR 51.22(c) and
determined that an environmental
assessment is the appropriate form of
environmental review. Based on the
results of the environmental assessment,
which is provided in Section II below,
the NRC is issuing this final finding of
no significant impact.
II. Environmental Assessment
mstockstill on DSK4VPTVN1PROD with NOTICES
Identification of the Proposed Action
The proposed action would exempt
DEK from meeting the requirements set
forth in 10 CFR 50.82(a)(8)(i)(A) and 10
CFR 50.75(h)(1)(iv). The proposed
action would allow DEK to use a portion
of the funds from the Trust for
irradiated fuel management without
prior notification to the NRC.
VerDate Mar<15>2010
00:23 May 02, 2014
Jkt 232001
The proposed action is in accordance
with the licensee’s application dated
April 4, 2013, as supplemented by letter
dated November 6, 2013.
The Need for the Proposed Action
By letter dated February 25, 2013,
DEK informed the NRC of its intention
to permanently cease operation of KPS
on May 7, 2013 (ADAMS Accession No.
ML13058A065). By separate letters
dated February 26, 2013, DEK submitted
an update to the KPS Irradiated Fuel
Management Plan, as required by 10
CFR 50.54(bb), and a Post-Shutdown
Decommissioning Activities Report
(PSDAR), as required by 10 CFR
50.82(a)(4)(i) (ADAMS Accession Nos.
ML13059A028 and ML13063A248,
respectively). On May 7, 2013, DEK
permanently ceased power operations at
KPS. On May 14, 2013, DEK certified
that it had permanently defueled the
KPS reactor vessel (ADAMS Accession
No. ML13135A209).
As required by 10 CFR
50.82(a)(8)(i)(A), decommissioning trust
funds may be used by the licensee if the
withdrawals are for legitimate
decommissioning activity expenses,
consistent with the definition of
decommissioning in 10 CFR 50.2. The
definition of ‘‘decommissioning’’ in 10
CFR 50.2 does not include activities
associated with irradiated fuel
management. Similarly, the
requirements of 10 CFR 50.75(h)(1)(iv)
restrict the use of decommissioning
trust fund withdrawals (other than for
ordinary and incidental expenses) to
decommissioning expenses until final
decommissioning is completed.
Therefore, exemptions from 10 CFR
50.82(a)(8)(i)(A) and 10 CFR
50.75(h)(1)(iv) are needed to allow DEK
to use funds from the Trust for
irradiated fuel management.
The licensee states that the Trust
contains funds for decommissioning
comingled with funds needed for
irradiated fuel management not
associated with radiological
decontamination. The adequacy of the
Trust to cover the costs of activities
associated with irradiated fuel
management and radiological
decontamination through license
termination is supported by the site
specific decommissioning cost estimate
in the PSDAR and the KPS updated
Irradiated Fuel Management Plan. The
licensee needs access to the funds in
excess of those needed for radiological
decontamination to support irradiated
fuel management not associated with
radiological decontamination.
The requirements of 10 CFR
50.75(h)(1)(iv) further provide that,
except for decommissioning
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
25157
withdrawals being made under 10 CFR
50.82(a)(8) or for payment of ordinary
and incidental expenses, no
disbursement may be made from the
Trust without written notice to the NRC
at least 30 working days in advance.
Therefore an exemption from 10 CFR
50.75(h)(1)(iv) is needed to allow DEK
to use funds from the Trust for
irradiated fuel management without
prior NRC notification.
In summary, by letter dated April 4,
2013, as supplemented by letter dated
November 6, 2013, DEK requested
exemptions to allow Trust withdrawals,
without prior written notification to the
NRC, for irradiated fuel management
consistent with both the KPS updated
Irradiated Fuel Management Plan and
the PSDAR.
Environmental Impacts of the Proposed
Action
The proposed action involves
exemptions from requirements that are
of a financial or administrative nature
which do not have an impact on the
environment. The NRC has completed
its evaluation of the proposed action
and concludes that there is reasonable
assurance that adequate funds are
available in the Trust to complete all
activities associated with license
termination and irradiated fuel
management. There is no decrease in
the safety associated with the Trust
being used to fund activities associated
with irradiated fuel management. The
exemptions would permit the use of
Trust funds to effectuate DEK’s plan to
manage irradiated fuel in accordance
with the updated Irradiated Fuel
Management Plan and PSDAR. Since
the exemption would allow DEK to use
funds from the Trust that are in excess
of those required for radiological
decontamination of the site and the
funds dedicated for radiological
decontamination are not affected by the
proposed exemption, there is reasonable
assurance that there will be no
environmental impact due to lack of
adequate funding for decommissioning.
The proposed action will not
significantly increase the probability or
consequences of accidents. No changes
are being made in the types of effluents
that may be released offsite. There is no
significant increase in the amount of
any effluent released offsite. There is no
significant increase in occupational or
public radiation exposure. Therefore,
there are no significant radiological
environmental impacts associated with
the proposed action.
With regard to potential nonradiological impacts, the proposed
action does not have any foreseeable
impacts to land, air, or water resources,
E:\FR\FM\02MYN1.SGM
02MYN1
25158
Federal Register / Vol. 79, No. 85 / Friday, May 2, 2014 / Notices
including impacts to biota. In addition,
there are also no known socioeconomic
or environmental justice impacts
associated with such proposed action.
Therefore, there are no significant nonradiological environmental impacts
associated with the proposed action.
Accordingly, the NRC concludes that
there are no significant environmental
impacts associated with the proposed
action.
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
action, the staff considered denial of the
proposed action (i.e., the ‘‘no-action’’
alternative). Denial of the application
would result in no change in current
environmental impacts. The
environmental impacts of the proposed
action and the alternative action are
similar.
Alternative Use of Resources
The action does not involve the use of
any different resources than those
previously considered in the Final
Environmental Statement for the KPS,
dated December 1972, and the ‘‘Generic
Environmental Impact Statement for
License Renewal of Nuclear Plants
Regarding Kewaunee Power Station,
Final Report,’’ NUREG–1437,
Supplement 40, dated August 2010
(ADAMS Accession No. ML102150106).
mstockstill on DSK4VPTVN1PROD with NOTICES
Agencies or Persons Consulted
The staff did not enter into
consultation with any other Federal
Agency or with the State of Wisconsin
regarding the environmental impact of
the proposed action. On April 10, 2014,
the Wisconsin state representative was
notified.
III. Finding of No Significant Impact
The licensee has proposed
exemptions from 10 CFR
50.82(a)(8)(i)(A) and 10 CFR
50.75(h)(1)(iv) which would allow DEK
to use funds from the Trust for
irradiated fuel management activities in
accordance with the updated Irradiated
Fuel Management Plan and PSDAR,
without prior written notification to the
NRC.
The NRC decided not to prepare an
Environmental Impact Statement for the
proposed action. On the basis of the
environmental assessment included in
Section II above and incorporated by
reference in this finding, the NRC
concludes that the proposed action will
not have significant effects on the
quality of the human environment.
Accordingly, the NRC has determined
that a finding of no significant impact is
appropriate.
VerDate Mar<15>2010
00:23 May 02, 2014
Jkt 232001
Other than the licensee’s letters, dated
April 4, 2013, as supplemented by letter
dated November 6, 2013, there are no
other environmental documents
associated with this review. These
documents are available for public
inspection as indicated above.
Dated at Rockville, Maryland, this 25th day
of April 2014.
For the Nuclear Regulatory Commission.
Douglas A. Broaddus,
Chief, Plant Licensing IV–2 and
Decommissioning Transition Branch,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2014–10097 Filed 5–1–14; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
I. Accessing Information and
Submitting Comments
[NRC–2011–0237]
Event Reporting Guidelines
Nuclear Regulatory
Commission.
ACTION: Draft NUREG; request for
comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment a draft NUREG–1022, Revision
3, Supplement 1, ‘‘Event Reporting
Guidelines: 10 CFR 50.72(b)(3)(xiii).’’ In
draft NUREG–1022, Revision 3,
Supplement 1, the NRC proposes to
endorse Nuclear Energy Institute (NEI)
13–01, ‘‘Reportable Action Levels for
Loss of Emergency Preparedness
Capabilities,’’ dated October 2013. NEI
13–01 provides specific guidance for
reporting to the NRC any event that
results in a major loss of emergency
assessment capability, offsite response
capability, or offsite communications
capability.
SUMMARY:
Submit comments by June 2,
2014. Comments received after this date
will be considered if it is practical to do
so, but the Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comment
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2011–0237. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
DATES:
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
3WFN, 06–44M, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on accessing
information and submitting comments,
see ‘‘Accessing Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Christopher Regan, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
2768, email:
Christopher.Regan@nrc.gov.
SUPPLEMENTARY INFORMATION:
A. Accessing Information
Please refer to Docket ID NRC–2011–
0237 when contacting the NRC about
the availability of information regarding
this document. You may access
publicly-available information related to
this action by the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2011–0237.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. Draft
NUREG–1022, Revision 3, Supplement
1 is available in ADAMS under
Accession No. ML14114A384. NEI 13–
01, dated October 2013, is also available
in ADAMS under Accession No.
ML13281A794.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
II. Background
NUREG–1022, Revision 3, ‘‘Event
Reporting Guidelines: 10 CFR 50.72 and
50.73,’’ (ADAMS Accession No.
ML13032A220) contains guidelines that
the NRC considers acceptable for use in
meeting the requirements of §§ 50.72
and 50.73 of Title 10 of the Code of
Federal Regulations (10 CFR). The NRC
uses the information reported under 10
CFR 50.72 and 10 CFR 50.73 in
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 79, Number 85 (Friday, May 2, 2014)]
[Notices]
[Pages 25156-25158]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10097]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-305; NRC-2013-0056]
Environmental Assessment and Finding of No Significant Impact;
Final Issuance: Dominion Energy Kewaunee; Kewaunee Power Station
AGENCY: Nuclear Regulatory Commission.
ACTION: Environmental assessment and finding of no significant impact;
final issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of exemptions in response to an April 4, 2013, request from
Dominion Energy Kewaunee (DEK, the licensee). One exemption would
permit the licensee to use a portion of the funds from the Kewaunee
Power Station (KPS) decommissioning trust fund (Trust) for irradiated
fuel management activities. Another exemption would allow the licensee
to make the withdrawals from the Trust for irradiated fuel management
activities without prior notification to the NRC. The NRC staff is
issuing an Environmental Assessment and Finding of No Significant
Impact associated with the proposed exemptions.
ADDRESSES: Please refer to Docket ID NRC-2013-0056 when contacting the
NRC about the availability of information regarding this document. You
may access publicly-available information related to this document
using any of the following methods:
Federal rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0056. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section
of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search''. For problems with ADAMS,
please contact the NRC's Public
[[Page 25157]]
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to pdr.resource@nrc.gov. The ADAMS accession number for each
document referenced in this notice (if that document is available in
ADAMS) is provided the first time that a document is referenced. The
request for exemption, dated April 4, 2013, is available electronically
under ADAMS Accession No. ML13098A031. The supplement, dated November
6, 2013, is available at ADAMS Accession No. ML13312A916.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: William Huffman, Office of Nuclear
Reactor Regulation, 301-415-2046; William.Huffman@nrc.gov; U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering issuance of exemptions from Part 50, Section
82(a)(8)(i)(A) and 10 CFR Part 50 Section 75(h)(1)(iv) of Title 10 of
the Code of Federal Regulations (10 CFR) for Renewed Facility Operating
License No. DPR-43, issued to Dominion Energy Kewaunee (DEK, the
licensee), for the Kewaunee Power Station located in Kewaunee County,
Wisconsin. The licensee requested the exemptions by letter dated April
4, 2013, and supplemented its request by letter dated November 6, 2013.
The exemptions would allow the licensee to use a portion of the funds
from the KPS Trust for irradiated fuel management activities without
prior notification to the NRC. Consistent with 10 CFR 51.21, the NRC
has reviewed the requirements in 10 CFR 51.20(b) and 10 CFR 51.22(c)
and determined that an environmental assessment is the appropriate form
of environmental review. Based on the results of the environmental
assessment, which is provided in Section II below, the NRC is issuing
this final finding of no significant impact.
II. Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt DEK from meeting the requirements
set forth in 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv). The
proposed action would allow DEK to use a portion of the funds from the
Trust for irradiated fuel management without prior notification to the
NRC.
The proposed action is in accordance with the licensee's
application dated April 4, 2013, as supplemented by letter dated
November 6, 2013.
The Need for the Proposed Action
By letter dated February 25, 2013, DEK informed the NRC of its
intention to permanently cease operation of KPS on May 7, 2013 (ADAMS
Accession No. ML13058A065). By separate letters dated February 26,
2013, DEK submitted an update to the KPS Irradiated Fuel Management
Plan, as required by 10 CFR 50.54(bb), and a Post-Shutdown
Decommissioning Activities Report (PSDAR), as required by 10 CFR
50.82(a)(4)(i) (ADAMS Accession Nos. ML13059A028 and ML13063A248,
respectively). On May 7, 2013, DEK permanently ceased power operations
at KPS. On May 14, 2013, DEK certified that it had permanently defueled
the KPS reactor vessel (ADAMS Accession No. ML13135A209).
As required by 10 CFR 50.82(a)(8)(i)(A), decommissioning trust
funds may be used by the licensee if the withdrawals are for legitimate
decommissioning activity expenses, consistent with the definition of
decommissioning in 10 CFR 50.2. The definition of ``decommissioning''
in 10 CFR 50.2 does not include activities associated with irradiated
fuel management. Similarly, the requirements of 10 CFR 50.75(h)(1)(iv)
restrict the use of decommissioning trust fund withdrawals (other than
for ordinary and incidental expenses) to decommissioning expenses until
final decommissioning is completed. Therefore, exemptions from 10 CFR
50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) are needed to allow DEK to
use funds from the Trust for irradiated fuel management.
The licensee states that the Trust contains funds for
decommissioning comingled with funds needed for irradiated fuel
management not associated with radiological decontamination. The
adequacy of the Trust to cover the costs of activities associated with
irradiated fuel management and radiological decontamination through
license termination is supported by the site specific decommissioning
cost estimate in the PSDAR and the KPS updated Irradiated Fuel
Management Plan. The licensee needs access to the funds in excess of
those needed for radiological decontamination to support irradiated
fuel management not associated with radiological decontamination.
The requirements of 10 CFR 50.75(h)(1)(iv) further provide that,
except for decommissioning withdrawals being made under 10 CFR
50.82(a)(8) or for payment of ordinary and incidental expenses, no
disbursement may be made from the Trust without written notice to the
NRC at least 30 working days in advance. Therefore an exemption from 10
CFR 50.75(h)(1)(iv) is needed to allow DEK to use funds from the Trust
for irradiated fuel management without prior NRC notification.
In summary, by letter dated April 4, 2013, as supplemented by
letter dated November 6, 2013, DEK requested exemptions to allow Trust
withdrawals, without prior written notification to the NRC, for
irradiated fuel management consistent with both the KPS updated
Irradiated Fuel Management Plan and the PSDAR.
Environmental Impacts of the Proposed Action
The proposed action involves exemptions from requirements that are
of a financial or administrative nature which do not have an impact on
the environment. The NRC has completed its evaluation of the proposed
action and concludes that there is reasonable assurance that adequate
funds are available in the Trust to complete all activities associated
with license termination and irradiated fuel management. There is no
decrease in the safety associated with the Trust being used to fund
activities associated with irradiated fuel management. The exemptions
would permit the use of Trust funds to effectuate DEK's plan to manage
irradiated fuel in accordance with the updated Irradiated Fuel
Management Plan and PSDAR. Since the exemption would allow DEK to use
funds from the Trust that are in excess of those required for
radiological decontamination of the site and the funds dedicated for
radiological decontamination are not affected by the proposed
exemption, there is reasonable assurance that there will be no
environmental impact due to lack of adequate funding for
decommissioning.
The proposed action will not significantly increase the probability
or consequences of accidents. No changes are being made in the types of
effluents that may be released offsite. There is no significant
increase in the amount of any effluent released offsite. There is no
significant increase in occupational or public radiation exposure.
Therefore, there are no significant radiological environmental impacts
associated with the proposed action.
With regard to potential non-radiological impacts, the proposed
action does not have any foreseeable impacts to land, air, or water
resources,
[[Page 25158]]
including impacts to biota. In addition, there are also no known
socioeconomic or environmental justice impacts associated with such
proposed action. Therefore, there are no significant non-radiological
environmental impacts associated with the proposed action.
Accordingly, the NRC concludes that there are no significant
environmental impacts associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed action, the staff considered
denial of the proposed action (i.e., the ``no-action'' alternative).
Denial of the application would result in no change in current
environmental impacts. The environmental impacts of the proposed action
and the alternative action are similar.
Alternative Use of Resources
The action does not involve the use of any different resources than
those previously considered in the Final Environmental Statement for
the KPS, dated December 1972, and the ``Generic Environmental Impact
Statement for License Renewal of Nuclear Plants Regarding Kewaunee
Power Station, Final Report,'' NUREG-1437, Supplement 40, dated August
2010 (ADAMS Accession No. ML102150106).
Agencies or Persons Consulted
The staff did not enter into consultation with any other Federal
Agency or with the State of Wisconsin regarding the environmental
impact of the proposed action. On April 10, 2014, the Wisconsin state
representative was notified.
III. Finding of No Significant Impact
The licensee has proposed exemptions from 10 CFR 50.82(a)(8)(i)(A)
and 10 CFR 50.75(h)(1)(iv) which would allow DEK to use funds from the
Trust for irradiated fuel management activities in accordance with the
updated Irradiated Fuel Management Plan and PSDAR, without prior
written notification to the NRC.
The NRC decided not to prepare an Environmental Impact Statement
for the proposed action. On the basis of the environmental assessment
included in Section II above and incorporated by reference in this
finding, the NRC concludes that the proposed action will not have
significant effects on the quality of the human environment.
Accordingly, the NRC has determined that a finding of no significant
impact is appropriate.
Other than the licensee's letters, dated April 4, 2013, as
supplemented by letter dated November 6, 2013, there are no other
environmental documents associated with this review. These documents
are available for public inspection as indicated above.
Dated at Rockville, Maryland, this 25th day of April 2014.
For the Nuclear Regulatory Commission.
Douglas A. Broaddus,
Chief, Plant Licensing IV-2 and Decommissioning Transition Branch,
Division of Operating Reactor Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2014-10097 Filed 5-1-14; 8:45 am]
BILLING CODE 7590-01-P