Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings, 25126-25127 [2014-10044]
Download as PDF
25126
Federal Register / Vol. 79, No. 85 / Friday, May 2, 2014 / Notices
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 22, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–10087 Filed 5–1–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Filings in Existing Proceedings
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
mstockstill on DSK4VPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: CP14–227–000
Applicants: Texas Eastern
Transmission, LP and Enable Gas
Transmission, LLC
Description: Joint Abbreviated
Application of Texas Eastern
Transmission, LP and Enable Gas
Transmission, LLC for Authorization to
Abandon Leased Capacity and to
Reacquire the Capacity
Filed Date: 4/23/14
Accession Number: 20140423–5218
Comments Due: 5 p.m. ET 5/7/14
Docket Numbers: RP14–769–000
Applicants: Trailblazer Pipeline
Company LLC
Description: Neg Rate 2014–04–25
Green Plains to be effective 5/1/2014
Filed Date: 4/25/14
Accession Number: 20140425–5123
Comments Due: 5 p.m. ET 5/7/14
Docket Numbers: RP14–770–000
Applicants: Discovery Gas
Transmission LLC
Description: Discovery Gas
Transmission LLC annual cash-out
imbalance report in accordance with
Section 9.9 of the General Terms and
Conditions
Filed Date: 4/25/14
Accession Number: 20140425–5167
Comments Due: 5 p.m. ET 5/7/14
Docket Numbers: RP14–771–000
Applicants: National Fuel Gas Supply
Corporation
Description: Market Pooling 2014 to
be effective 6/1/2014
Filed Date: 4/25/14
Accession Number: 20140425–5228
Comments Due: 5 p.m. ET 5/7/14
Docket Numbers: RP14–772–000
Applicants: Millennium Pipeline
Company, LLC
Description: Negotiated Rate Service
Agmts—SW to be effective 5/1/2014
VerDate Mar<15>2010
00:23 May 02, 2014
Filed Date: 4/25/14
Accession Number: 20140425–5275
Comments Due: 5 p.m. ET 5/7/14
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Jkt 232001
Docket Numbers: RP14–698–001
Applicants: Millennium Pipeline
Company, LLC
Description: Negotiated Rate Service
Agmts—ConEd Amendment to be
effective 5/1/2014
Filed Date: 4/25/14
Accession Number: 20140425–5119
Comments Due: 5 p.m. ET 5/7/14
Docket Numbers: RP14–742–001
Applicants: Millennium Pipeline
Company, LLC
Description: Negotiated & Non-Conf
Agreements—Conversion of BH to FT
Amendment to be effective 5/1/2014
Filed Date: 4/25/14
Accession Number: 20140425–5124
Comments Due: 5 p.m. ET 5/7/14
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 28, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Filings Instituting Proceedings
Docket Numbers: RP14–763–000
Applicants: Transcontinental Gas
Pipe Line Company,
Description: Annual Adjustment to
Rate Schedule SS–2 Storage Gas
Balances 2014 to be effective 5/1/2014
Filed Date: 4/22/14
Accession Number: 20140422–5102
Comments Due: 5 p.m. ET 5/5/14
Docket Numbers: RP14–764–000
Applicants: Millennium Pipeline
Company, LLC
Description: Negotiated Rate Service
Agreement—WPX to be effective
5/1/2014
Filed Date: 4/23/14
Accession Number: 20140423–5054
Comments Due: 5 p.m. ET 5/5/14
Docket Numbers: RP14–765–000
Applicants: Texas Gas Transmission,
LLC
Description: Non-conforming Agmt—
Clarksdale 20393 to be effective
4/23/2014
Filed Date: 4/23/14
Accession Number: 20140423–5146
Comments Due: 5 p.m. ET 5/5/14
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 24, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–10088 Filed 5–1–14; 8:45 am]
[FR Doc. 2014–10090 Filed 5–1–14; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Notice of Commissioner and Staff
Attendance at North American Electric
Reliability Corporation Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 79, No. 85 / Friday, May 2, 2014 / Notices
Federal Energy Regulatory
Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on May 28,
2014.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Mojave provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
[Docket No. CP14–129–000]
Summary of the Proposed Project
Kern River Transmission and Mojave
Pipeline Company, LLC; Notice of
Intent to Prepare an Environmental
Assessment for the Proposed Line No.
1901 Replacement Project and Request
for Comments on Environmental
Issues
Mojave seeks authorization to replace
two natural gas pipeline segments of the
30-inch-diameter Mojave Main Line
(Line No. 1901) located in Kern County,
California, to comply with a U.S.
Department of Transportation class
location change. Due to an increase in
population in the vicinity of the City of
Taft in Kern County, two pipeline
segments comprising approximately
1,825 linear feet need to be replaced to
meet regulations.
notice that members of the Commission
and/or Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation, Member Representatives
Committee and Board of Trustees
Meetings, Board of Trustees Finance
and Audit Committee, Compliance
Committee, and Standards Oversight
and Technology Committee Meetings.
Hyatt Regency Philadelphia at Penn’s
Landing, 201 South Columbus Blvd.,
Philadelphia, PA 19106.
May 6 (7:30 a.m.–5:00 p.m.) and May
7 (8:30 a.m.–12:00 p.m.), 2014.
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceedings:
Docket No. RR14–2, North American
Electric Reliability Corporation
Docket No. RD14–2, North American
Electric Reliability Corporation
Docket No. RD14–7, North American
Electric Reliability Corporation
For further information, please
contact Jonathan First, 202–502–8529,
or jonathan.first@ferc.gov.
Dated: April 25, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10044 Filed 5–1–14; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on DSK4VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Line No. 1901 Replacement Project
involving construction and operation of
facilities by Kern River Transmission
and Mojave Pipeline Company LLC
(together, ‘‘Mojave’’) in Kern County,
California. The Commission will use
this EA in its decision-making process
to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
VerDate Mar<15>2010
00:23 May 02, 2014
Jkt 232001
Land Requirements for Construction
The pipeline replacement and related
activities would disturb about 11.7 acres
of land. Following construction, Mojave
would maintain about 5.2 acres for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
The entire proposed pipeline route
parallels existing pipeline, utility, or
road rights-of-way.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
25127
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us1 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use;
• cultural resources;
• vegetation, wildlife, and
endangered and threatened species;
• air quality and noise; and
• public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
[beginning on page 4].
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA2. Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
2 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 79, Number 85 (Friday, May 2, 2014)]
[Notices]
[Pages 25126-25127]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10044]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commissioner and Staff Attendance at North American
Electric Reliability Corporation Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
[[Page 25127]]
notice that members of the Commission and/or Commission staff may
attend the following meetings:
North American Electric Reliability Corporation, Member
Representatives Committee and Board of Trustees Meetings, Board of
Trustees Finance and Audit Committee, Compliance Committee, and
Standards Oversight and Technology Committee Meetings.
Hyatt Regency Philadelphia at Penn's Landing, 201 South Columbus
Blvd., Philadelphia, PA 19106.
May 6 (7:30 a.m.-5:00 p.m.) and May 7 (8:30 a.m.-12:00 p.m.), 2014.
Further information regarding these meetings may be found at:
https://www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings, which are open to the public, may
address matters at issue in the following Commission proceedings:
Docket No. RR14-2, North American Electric Reliability Corporation
Docket No. RD14-2, North American Electric Reliability Corporation
Docket No. RD14-7, North American Electric Reliability Corporation
For further information, please contact Jonathan First, 202-502-
8529, or jonathan.first@ferc.gov.
Dated: April 25, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-10044 Filed 5-1-14; 8:45 am]
BILLING CODE 6717-01-P