Application To Rescind Presidential Permit; Joint Application for Presidential Permit; Maine Public Service Company and Bangor Hydro Electric Company, 23337-23338 [2014-09651]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 81 / Monday, April 28, 2014 / Notices
and connection of facilities at the
international border of the United States
for the transmission of electric energy
between the United States and a foreign
country is prohibited in the absence of
a Presidential permit issued pursuant to
Executive Order (EO) 10485, as
amended by EO 12038. Existing
Presidential permits are not transferable
or assignable. However, in the event of
a proposed voluntary transfer of
facilities, in accordance with DOE
regulations at 10 CFR 205.323, the
existing permit holder and the
transferee are required to file a joint
application with DOE that includes a
statement of reasons for the transfer.
On December 30, 2013, Maine Public
and Bangor Hydro jointly filed an
application with DOE requesting
rescission of Presidential Permit No.
PP–81 issued to Maine Public and a
simultaneous issuance of a Presidential
permit to Bangor Hydro for the same
international transmission facilities. The
international transmission facilities
authorized by Presidential Permit No.
PP–81 include one 7.2 kilovolt (kV)
distribution line running from the
Canadian border into Maine.
The requested transfer of the permit is
due to the merger of Maine Public and
Bangor Hydro that was finalized by the
Maine Public Utilities Commission on
December 17, 2013 and effective January
1, 2014. The Applicants have requested
that the issuance of the permit to Bangor
Hydro be made effective upon the
transfer of facilities, which occurred on
January 1, 2014.
Procedural matters: Any person may
comment on this application by filing
such comment at the address provided
above. Any person seeking to become a
party to this proceeding must file a
motion to intervene at the address
provided above in accordance with Rule
214 of FERC’s Rules of Practice and
Procedure (18 CFR 385.214). Two copies
of each comment or motion to intervene
should be filed with DOE on or before
the date listed above.
Additional copies of such motions to
intervene also should be filed directly
with: Nathan Martell, Bangor Hydro
Electric Company, P.O. Box 932,
Bangor, Maine 04402 and Bonnie A.
Suchman, Troutman Sander LLP, 401
9th St. NW., Suite 1000, Washington,
DC 20004.
Before a Presidential permit may be
granted or amended, DOE must
determine that the proposed action will
not adversely impact on the reliability
of the U.S. electric power supply
system. In addition, DOE must consider
the environmental impacts of the
proposed action (i.e., granting the
Presidential permit or amendment, with
VerDate Mar<15>2010
17:06 Apr 25, 2014
Jkt 232001
any conditions and limitations, or
denying the permit) pursuant to the
National Environmental Policy Act of
1969. DOE also must obtain the
concurrences of the Secretary of State
and the Secretary of Defense before
taking final action on a Presidential
permit application.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above. In addition, the
application may be reviewed or
downloaded electronically at https://
energy.gov/oe/services/electricitypolicy-coordination-andimplementation/internationalelectricity-regulatio-2. Upon reaching
the home page, select ‘‘Pending
Applications.’’
Issued in Washington, DC, on April 22,
2014.
Christopher A. Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery, and Energy Reliability.
[FR Doc. 2014–09650 Filed 4–25–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. PP–395]
Application To Rescind Presidential
Permit; Joint Application for
Presidential Permit; Maine Public
Service Company and Bangor Hydro
Electric Company
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
AGENCY:
Maine Public Service
Company (Maine Public) and Bangor
Hydro Electric Company (Bangor Hydro)
filed a joint application to voluntarily
transfer the Maine Public facilities
authorized by Presidential Permit No.
PP–29, as amended, to Bangor Hydro.
The application requested that the
Department of Energy (DOE) rescind the
Presidential permit held by Maine
Public and simultaneously issue a
permit to Bangor Hydro under its new
name, Emera Maine (Emera), covering
the same international transmission
facilities.
SUMMARY:
Comments or motions to
intervene must be submitted on or
before May 28, 2014.
ADDRESSES: Comments or motions to
intervene should be addressed as
follows: Office of Electricity Delivery
and Energy Reliability (OE–20), U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585.
DATES:
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
23337
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence (Program Office)
at 202–586–5260, or by email to
Christopher.Lawrence@hq.doe.gov, or
Katherine Konieczny (Program
Attorney) at 202–586–0503.
SUPPLEMENTARY INFORMATION: The
construction, operation, maintenance,
and connection of facilities at the
international border of the United States
for the transmission of electric energy
between the United States and a foreign
country is prohibited in the absence of
a Presidential permit issued pursuant to
Executive Order (EO) 10485, as
amended by EO 12038. Existing
Presidential permits are not transferable
or assignable. However, in the event of
a proposed voluntary transfer of
facilities, in accordance with DOE
regulations at 10 CFR 205.323, the
existing permit holder and the
transferee are required to file a joint
application with DOE that includes a
statement of reasons for the transfer.
On December 30, 2013, Maine Public
and Bangor Hydro jointly filed an
application with DOE requesting
rescission of Presidential Permit No.
PP–29, as amended, issued to Maine
Public and a simultaneous issuance of a
Presidential permit to Bangor Hydro for
the same international transmission
facilities. The international transmission
facilities authorized by Presidential
Permit No. PP–29, as amended, include
two 69 kilovolt (kV) and one 138 kV
transmission lines running from the
Canadian border into Maine.
The requested transfer of the permit is
due to the merger of Maine Public and
Bangor Hydro that was finalized by the
Maine Public Utilities Commission on
December 17, 2013 and effective January
1, 2014. The Applicants have requested
that the issuance of the permit to Bangor
Hydro be made effective upon the
transfer of facilities, which occurred on
January 1, 2014.
Procedural Matters: Any person may
comment on this application by filing
such comment at the address provided
above. Any person seeking to become a
party to this proceeding must file a
motion to intervene at the address
provided above in accordance with Rule
214 of FERC’s Rules of Practice and
Procedure (18 CFR 385.214). Two copies
of each comment or motion to intervene
should be filed with DOE on or before
the date listed above.
Additional copies of motions to
intervene also should be filed directly
with: Nathan Martell, Bangor Hydro
Electric Company, P.O. Box 932,
Bangor, Maine 04402 and Bonnie
A.Suchman, Troutman Sander LLP, 401
9th St. NW., Suite 1000, Washington,
DC 20004.
E:\FR\FM\28APN1.SGM
28APN1
23338
Federal Register / Vol. 79, No. 81 / Monday, April 28, 2014 / Notices
Before a Presidential permit may be
granted or amended, DOE must
determine that the proposed action will
not adversely impact on the reliability
of the U.S. electric power supply
system. In addition, DOE must consider
the environmental impacts of the
proposed action (i.e., granting the
Presidential permit or amendment, with
any conditions and limitations, or
denying the permit) pursuant to the
National Environmental Policy Act of
1969. DOE also must obtain the
concurrences of the Secretary of State
and the Secretary of Defense before
taking final action on a Presidential
permit application.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above. In addition, the
application may be reviewed or
downloaded electronically at https://
energy.gov/oe/services/electricitypolicy-coordination-andimplementation/internationalelectricity-regulatio-2. Upon reaching
the home page, select ‘‘Pending
Applications.’’
Issued in Washington, DC, on April 22,
2014.
Christopher A. Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2014–09651 Filed 4–25–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. PP–394]
Application To Rescind Presidential
Permit; Joint Application for
Presidential Permit; Maine Public
Service Company and Bangor Hydro
Electric Company
Office of Electricity Delivery
and Energy Reliability, DOE.
AGENCY:
ACTION:
Notice of application.
Maine Public Service
Company (Maine Public) and Bangor
Hydro Electric Company (Bangor Hydro)
filed a joint application to voluntarily
transfer the Maine Public facilities
authorized by Presidential Permit No.
PP–12, as amended, to Bangor Hydro.
The application requested that the
Department of Energy (DOE) rescind the
Presidential permit held by Maine
Public and simultaneously issue a
permit to Bangor Hydro under its new
name, Emera Maine (Emera), covering
the same international transmission
facilities.
tkelley on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:06 Apr 25, 2014
Jkt 232001
Comments or motions to
intervene must be submitted on or May
28, 2014.
ADDRESSES: Comments or motions to
intervene should be addressed as
follows: Office of Electricity Delivery
and Energy Reliability (OE–20), U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence (Program Office)
at 202–586–5260, or by email to
Christopher.Lawrence@hq.doe.gov, or
Katherine Konieczny (Program
Attorney) at 202–586–0503.
SUPPLEMENTARY INFORMATION: The
construction, operation, maintenance,
and connection of facilities at the
international border of the United States
for the transmission of electric energy
between the United States and a foreign
country is prohibited in the absence of
a Presidential permit issued pursuant to
Executive Order (EO) 10485, as
amended by EO 12038. Existing
Presidential permits are not transferable
or assignable. However, in the event of
a proposed voluntary transfer of
facilities, in accordance with DOE
regulations at 10 CFR 205.323, the
existing permit holder and the
transferee are required to file a joint
application with DOE that includes a
statement of reasons for the transfer.
On December 30, 2013, Maine Public
and Bangor Hydro jointly filed an
application with DOE requesting
rescission of Presidential Permit No.
PP–12, as amended, issued to Maine
Public and a simultaneous issuance of a
Presidential permit to Bangor Hydro for
the same international transmission
facilities. The international transmission
facilities authorized by Presidential
Permit No. PP–12, as amended, include
two 69 kilovolt (kV) transmission lines
running from the Canadian border into
Maine.
The requested transfer of the permit is
due to the merger of Maine Public and
Bangor Hydro that was finalized by the
Maine Public Utilities Commission on
December 17, 2013, and effective
January 1, 2014. The Applicants have
requested that the issuance of the permit
to Bangor Hydro be made effective upon
the transfer of facilities, which occurred
on January 1, 2014.
Procedural Matters: Any person may
comment on this application by filing
such comment at the address provided
above. Any person seeking to become a
party to this proceeding must file a
motion to intervene at the address
provided above in accordance with Rule
214 of FERC’s Rules of Practice and
Procedure (18 CFR 385.214). Two copies
DATES:
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
of each comment or motion to intervene
should be filed with DOE on or before
the date listed above.
Additional copies of such motions to
intervene also should be filed directly
with: Nathan Martell, Bangor Hydro
Electric Company, P.O. Box 932,
Bangor, Maine 04402 and Bonnie
A.Suchman, Troutman Sander LLP, 401
9th St. NW., Suite 1000, Washington,
DC 20004.
Before a Presidential permit may be
granted or amended, DOE must
determine that the proposed action will
not adversely impact on the reliability
of the U.S. electric power supply
system. In addition, DOE must consider
the environmental impacts of the
proposed action (i.e., granting the
Presidential permit or amendment, with
any conditions and limitations, or
denying the permit) pursuant to the
National Environmental Policy Act of
1969. DOE also must obtain the
concurrences of the Secretary of State
and the Secretary of Defense before
taking final action on a Presidential
permit application.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above. In addition, the
application may be reviewed or
downloaded electronically at https://
energy.gov/oe/services/electricitypolicy-coordination-andimplementation/internationalelectricity-regulatio-2. Upon reaching
the home page, select ‘‘Pending
Applications.’’
Issued in Washington, DC, on April 22,
2014.
Christopher A. Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2014–09652 Filed 4–25–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. PP–397]
Application To Rescind Presidential
Permit; Joint Application for
Presidential Permit; Maine Public
Service Company and Bangor Hydro
Electric Company
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
AGENCY:
Maine Public Service
Company (Maine Public) and Bangor
Hydro Electric Company (Bangor Hydro)
filed a joint application to voluntarily
transfer the Maine Public facilities
authorized by Presidential Permit No.
SUMMARY:
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 79, Number 81 (Monday, April 28, 2014)]
[Notices]
[Pages 23337-23338]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-09651]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. PP-395]
Application To Rescind Presidential Permit; Joint Application for
Presidential Permit; Maine Public Service Company and Bangor Hydro
Electric Company
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Maine Public Service Company (Maine Public) and Bangor Hydro
Electric Company (Bangor Hydro) filed a joint application to
voluntarily transfer the Maine Public facilities authorized by
Presidential Permit No. PP-29, as amended, to Bangor Hydro. The
application requested that the Department of Energy (DOE) rescind the
Presidential permit held by Maine Public and simultaneously issue a
permit to Bangor Hydro under its new name, Emera Maine (Emera),
covering the same international transmission facilities.
DATES: Comments or motions to intervene must be submitted on or before
May 28, 2014.
ADDRESSES: Comments or motions to intervene should be addressed as
follows: Office of Electricity Delivery and Energy Reliability (OE-20),
U.S. Department of Energy, 1000 Independence Avenue, SW., Washington,
DC 20585.
FOR FURTHER INFORMATION CONTACT: Christopher Lawrence (Program Office)
at 202-586-5260, or by email to Christopher.Lawrence@hq.doe.gov, or
Katherine Konieczny (Program Attorney) at 202-586-0503.
SUPPLEMENTARY INFORMATION: The construction, operation, maintenance,
and connection of facilities at the international border of the United
States for the transmission of electric energy between the United
States and a foreign country is prohibited in the absence of a
Presidential permit issued pursuant to Executive Order (EO) 10485, as
amended by EO 12038. Existing Presidential permits are not transferable
or assignable. However, in the event of a proposed voluntary transfer
of facilities, in accordance with DOE regulations at 10 CFR 205.323,
the existing permit holder and the transferee are required to file a
joint application with DOE that includes a statement of reasons for the
transfer.
On December 30, 2013, Maine Public and Bangor Hydro jointly filed
an application with DOE requesting rescission of Presidential Permit
No. PP-29, as amended, issued to Maine Public and a simultaneous
issuance of a Presidential permit to Bangor Hydro for the same
international transmission facilities. The international transmission
facilities authorized by Presidential Permit No. PP-29, as amended,
include two 69 kilovolt (kV) and one 138 kV transmission lines running
from the Canadian border into Maine.
The requested transfer of the permit is due to the merger of Maine
Public and Bangor Hydro that was finalized by the Maine Public
Utilities Commission on December 17, 2013 and effective January 1,
2014. The Applicants have requested that the issuance of the permit to
Bangor Hydro be made effective upon the transfer of facilities, which
occurred on January 1, 2014.
Procedural Matters: Any person may comment on this application by
filing such comment at the address provided above. Any person seeking
to become a party to this proceeding must file a motion to intervene at
the address provided above in accordance with Rule 214 of FERC's Rules
of Practice and Procedure (18 CFR 385.214). Two copies of each comment
or motion to intervene should be filed with DOE on or before the date
listed above.
Additional copies of motions to intervene also should be filed
directly with: Nathan Martell, Bangor Hydro Electric Company, P.O. Box
932, Bangor, Maine 04402 and Bonnie A.Suchman, Troutman Sander LLP, 401
9th St. NW., Suite 1000, Washington, DC 20004.
[[Page 23338]]
Before a Presidential permit may be granted or amended, DOE must
determine that the proposed action will not adversely impact on the
reliability of the U.S. electric power supply system. In addition, DOE
must consider the environmental impacts of the proposed action (i.e.,
granting the Presidential permit or amendment, with any conditions and
limitations, or denying the permit) pursuant to the National
Environmental Policy Act of 1969. DOE also must obtain the concurrences
of the Secretary of State and the Secretary of Defense before taking
final action on a Presidential permit application.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above. In
addition, the application may be reviewed or downloaded electronically
at https://energy.gov/oe/services/electricity-policy-coordination-and-implementation/international-electricity-regulatio-2. Upon reaching the
home page, select ``Pending Applications.''
Issued in Washington, DC, on April 22, 2014.
Christopher A. Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2014-09651 Filed 4-25-14; 8:45 am]