Application To Rescind Presidential Permit; Joint Application for Presidential Permit; Maine Public Service Company and Bangor Hydro Electric Company, 23338-23339 [2014-09649]

Download as PDF 23338 Federal Register / Vol. 79, No. 81 / Monday, April 28, 2014 / Notices Before a Presidential permit may be granted or amended, DOE must determine that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. In addition, DOE must consider the environmental impacts of the proposed action (i.e., granting the Presidential permit or amendment, with any conditions and limitations, or denying the permit) pursuant to the National Environmental Policy Act of 1969. DOE also must obtain the concurrences of the Secretary of State and the Secretary of Defense before taking final action on a Presidential permit application. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above. In addition, the application may be reviewed or downloaded electronically at https:// energy.gov/oe/services/electricitypolicy-coordination-andimplementation/internationalelectricity-regulatio-2. Upon reaching the home page, select ‘‘Pending Applications.’’ Issued in Washington, DC, on April 22, 2014. Christopher A. Lawrence, Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2014–09651 Filed 4–25–14; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [OE Docket No. PP–394] Application To Rescind Presidential Permit; Joint Application for Presidential Permit; Maine Public Service Company and Bangor Hydro Electric Company Office of Electricity Delivery and Energy Reliability, DOE. AGENCY: ACTION: Notice of application. Maine Public Service Company (Maine Public) and Bangor Hydro Electric Company (Bangor Hydro) filed a joint application to voluntarily transfer the Maine Public facilities authorized by Presidential Permit No. PP–12, as amended, to Bangor Hydro. The application requested that the Department of Energy (DOE) rescind the Presidential permit held by Maine Public and simultaneously issue a permit to Bangor Hydro under its new name, Emera Maine (Emera), covering the same international transmission facilities. tkelley on DSK3SPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 17:06 Apr 25, 2014 Jkt 232001 Comments or motions to intervene must be submitted on or May 28, 2014. ADDRESSES: Comments or motions to intervene should be addressed as follows: Office of Electricity Delivery and Energy Reliability (OE–20), U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Christopher Lawrence (Program Office) at 202–586–5260, or by email to Christopher.Lawrence@hq.doe.gov, or Katherine Konieczny (Program Attorney) at 202–586–0503. SUPPLEMENTARY INFORMATION: The construction, operation, maintenance, and connection of facilities at the international border of the United States for the transmission of electric energy between the United States and a foreign country is prohibited in the absence of a Presidential permit issued pursuant to Executive Order (EO) 10485, as amended by EO 12038. Existing Presidential permits are not transferable or assignable. However, in the event of a proposed voluntary transfer of facilities, in accordance with DOE regulations at 10 CFR 205.323, the existing permit holder and the transferee are required to file a joint application with DOE that includes a statement of reasons for the transfer. On December 30, 2013, Maine Public and Bangor Hydro jointly filed an application with DOE requesting rescission of Presidential Permit No. PP–12, as amended, issued to Maine Public and a simultaneous issuance of a Presidential permit to Bangor Hydro for the same international transmission facilities. The international transmission facilities authorized by Presidential Permit No. PP–12, as amended, include two 69 kilovolt (kV) transmission lines running from the Canadian border into Maine. The requested transfer of the permit is due to the merger of Maine Public and Bangor Hydro that was finalized by the Maine Public Utilities Commission on December 17, 2013, and effective January 1, 2014. The Applicants have requested that the issuance of the permit to Bangor Hydro be made effective upon the transfer of facilities, which occurred on January 1, 2014. Procedural Matters: Any person may comment on this application by filing such comment at the address provided above. Any person seeking to become a party to this proceeding must file a motion to intervene at the address provided above in accordance with Rule 214 of FERC’s Rules of Practice and Procedure (18 CFR 385.214). Two copies DATES: PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 of each comment or motion to intervene should be filed with DOE on or before the date listed above. Additional copies of such motions to intervene also should be filed directly with: Nathan Martell, Bangor Hydro Electric Company, P.O. Box 932, Bangor, Maine 04402 and Bonnie A.Suchman, Troutman Sander LLP, 401 9th St. NW., Suite 1000, Washington, DC 20004. Before a Presidential permit may be granted or amended, DOE must determine that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. In addition, DOE must consider the environmental impacts of the proposed action (i.e., granting the Presidential permit or amendment, with any conditions and limitations, or denying the permit) pursuant to the National Environmental Policy Act of 1969. DOE also must obtain the concurrences of the Secretary of State and the Secretary of Defense before taking final action on a Presidential permit application. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above. In addition, the application may be reviewed or downloaded electronically at https:// energy.gov/oe/services/electricitypolicy-coordination-andimplementation/internationalelectricity-regulatio-2. Upon reaching the home page, select ‘‘Pending Applications.’’ Issued in Washington, DC, on April 22, 2014. Christopher A. Lawrence, Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2014–09652 Filed 4–25–14; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [OE Docket No. PP–397] Application To Rescind Presidential Permit; Joint Application for Presidential Permit; Maine Public Service Company and Bangor Hydro Electric Company Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. AGENCY: Maine Public Service Company (Maine Public) and Bangor Hydro Electric Company (Bangor Hydro) filed a joint application to voluntarily transfer the Maine Public facilities authorized by Presidential Permit No. SUMMARY: E:\FR\FM\28APN1.SGM 28APN1 tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 79, No. 81 / Monday, April 28, 2014 / Notices PP–89, as amended, to Bangor Hydro. The application requested that the Department of Energy (DOE) rescind the Presidential permit held by Maine Public and simultaneously issue a permit to Bangor Hydro under its new name, Emera Maine (Emera), covering the same international transmission facilities. DATES: Comments or motions to intervene must be submitted on or before May 28, 2014. ADDRESSES: Comments or motions to intervene should be addressed as follows: Office of Electricity Delivery and Energy Reliability (OE–20), U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Christopher Lawrence (Program Office) at 202–586–5260, or by email to Christopher.Lawrence@hq.doe.gov, or Katherine Konieczny (Program Attorney) at 202–586–0503. SUPPLEMENTARY INFORMATION: The construction, operation, maintenance, and connection of facilities at the international border of the United States for the transmission of electric energy between the United States and a foreign country is prohibited in the absence of a Presidential permit issued pursuant to Executive Order (EO) 10485, as amended by EO 12038. Existing Presidential permits are not transferable or assignable. However, in the event of a proposed voluntary transfer of facilities, in accordance with DOE regulations at 10 CFR 205.323, the existing permit holder and the transferee are required to file a joint application with DOE that includes a statement of reasons for the transfer. On December 30, 2013, Maine Public and Bangor Hydro jointly filed an application with DOE requesting rescission of Presidential Permit No. PP–89, as amended, issued to Maine Public and a simultaneous issuance of a Presidential permit to Bangor Hydro for the same international transmission facilities. The international transmission facilities authorized by Presidential Permit No. PP–89, as amended, includes one 345 kilovolt (kV) transmission line running from the Canadian border into Maine. The requested transfer of the permit is due to the merger of Maine Public and Bangor Hydro that was finalized by the Maine Public Utilities Commission on December 17, 2013, and effective January 1, 2014. The Applicants have requested that the issuance of the permit to Bangor Hydro be made effective upon the transfer of facilities, which occurred on January 1, 2014. VerDate Mar<15>2010 17:06 Apr 25, 2014 Jkt 232001 Procedural Matters: Any person may comment on this application by filing such comment at the address provided above. Any person seeking to become a party to this proceeding must file a motion to intervene at the address provided above in accordance with Rule 214 of FERC’s Rules of Practice and Procedure (18 CFR 385.214). Two copies of each comment or motion to intervene should be filed with DOE on or before the date listed above. Additional copies of such motions to intervene also should be filed directly with: Nathan Martell, Bangor Hydro Electric Company, P.O. Box 932, Bangor, Maine 04402 and Bonnie A. Suchman, Troutman Sander LLP, 401 9th St. NW., Suite 1000, Washington, DC 20004. Before a Presidential permit may be granted or amended, DOE must determine that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. In addition, DOE must consider the environmental impacts of the proposed action (i.e., granting the Presidential permit or amendment, with any conditions and limitations, or denying the permit) pursuant to the National Environmental Policy Act of 1969. DOE also must obtain the concurrences of the Secretary of State and the Secretary of Defense before taking final action on a Presidential permit application. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above. In addition, the application may be reviewed or downloaded electronically at https:// energy.gov/oe/services/electricitypolicy-coordination-andimplementation/internationalelectricity-regulatio-2. Upon reaching the home page, select ‘‘Pending Applications.’’ Issued in Washington, DC, on April 22, 2014. Christopher A. Lawrence, Electricity Policy Analyst, Office of Electricity Delivery, and Energy Reliability. [FR Doc. 2014–09649 Filed 4–25–14; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Methane Hydrate Advisory Committee Office of Fossil Energy, Department of Energy. ACTION: Notice of Open Meeting. AGENCY: This notice announces a meeting of the Methane Hydrate Advisory Committee. The Federal SUMMARY: PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 23339 Advisory Committee Act (Public Law 92–463, 86 Stat.770) requires that notice of these meetings be announced in the Federal Register. Thursday, May 15, 2014, 10:45 a.m. to 11:00 a.m. (EDT)—Registration, 11:00 a.m. to 12:30 p.m. (EDT)— Meeting. DATES: U.S. Department of Energy, Forrestal Building, Room 3G–043, 1000 Independence Ave. SW., Washington, DC 20585. ADDRESSES: Lou Capitanio, U.S. Department of Energy, Office of Oil and Natural Gas, 1000 Independence Avenue SW., Washington, DC 20585. Phone: (202) 586–5098. FOR FURTHER INFORMATION CONTACT: Purpose of the Committee: The purpose of the Methane Hydrate Advisory Committee is to provide advice on potential applications of methane hydrate to the Secretary of Energy, and assist in developing recommendations and priorities for the Department of Energy’s Methane Hydrate Research and Development Program. Tentative Agenda: The agenda will include: Welcome and Introduction by the Designated Federal Officer; Discussion of Committee Comments on Draft Letter to the Secretary of Energy; Discussion of Committee Recommendations; and Public Comments, if any. Public Participation: The meeting is open to the public. The Designated Federal Officer and the Chair of the Committee will conduct the meeting to facilitate the orderly conduct of business. If you would like to file a written statement with the Committee, you may do so either before or after the meeting. If you would like to make oral statements regarding any of the items on the agenda, you should contact Lou Capitanio at the phone number listed above and provide your name, organization, citizenship, and contact information. Anyone attending the meeting will be required to present government issued identification. Space is limited. You must make your request for an oral statement at least five business days prior to the meeting, and reasonable provisions will be made to include the presentation on the agenda. Public comment will follow the threeminute rule. Minutes: The minutes of this meeting will be available for public review and copying within 60 days at the following Web site: https://energy.gov/fe/services/ advisory-committees/methane-hydrateadvisory-committee. SUPPLEMENTARY INFORMATION: E:\FR\FM\28APN1.SGM 28APN1

Agencies

[Federal Register Volume 79, Number 81 (Monday, April 28, 2014)]
[Notices]
[Pages 23338-23339]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-09649]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. PP-397]


Application To Rescind Presidential Permit; Joint Application for 
Presidential Permit; Maine Public Service Company and Bangor Hydro 
Electric Company

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Maine Public Service Company (Maine Public) and Bangor Hydro 
Electric Company (Bangor Hydro) filed a joint application to 
voluntarily transfer the Maine Public facilities authorized by 
Presidential Permit No.

[[Page 23339]]

PP-89, as amended, to Bangor Hydro. The application requested that the 
Department of Energy (DOE) rescind the Presidential permit held by 
Maine Public and simultaneously issue a permit to Bangor Hydro under 
its new name, Emera Maine (Emera), covering the same international 
transmission facilities.

DATES: Comments or motions to intervene must be submitted on or before 
May 28, 2014.

ADDRESSES: Comments or motions to intervene should be addressed as 
follows: Office of Electricity Delivery and Energy Reliability (OE-20), 
U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence (Program Office) 
at 202-586-5260, or by email to Christopher.Lawrence@hq.doe.gov, or 
Katherine Konieczny (Program Attorney) at 202-586-0503.

SUPPLEMENTARY INFORMATION: The construction, operation, maintenance, 
and connection of facilities at the international border of the United 
States for the transmission of electric energy between the United 
States and a foreign country is prohibited in the absence of a 
Presidential permit issued pursuant to Executive Order (EO) 10485, as 
amended by EO 12038. Existing Presidential permits are not transferable 
or assignable. However, in the event of a proposed voluntary transfer 
of facilities, in accordance with DOE regulations at 10 CFR 205.323, 
the existing permit holder and the transferee are required to file a 
joint application with DOE that includes a statement of reasons for the 
transfer.
    On December 30, 2013, Maine Public and Bangor Hydro jointly filed 
an application with DOE requesting rescission of Presidential Permit 
No. PP-89, as amended, issued to Maine Public and a simultaneous 
issuance of a Presidential permit to Bangor Hydro for the same 
international transmission facilities. The international transmission 
facilities authorized by Presidential Permit No. PP-89, as amended, 
includes one 345 kilovolt (kV) transmission line running from the 
Canadian border into Maine.
    The requested transfer of the permit is due to the merger of Maine 
Public and Bangor Hydro that was finalized by the Maine Public 
Utilities Commission on December 17, 2013, and effective January 1, 
2014. The Applicants have requested that the issuance of the permit to 
Bangor Hydro be made effective upon the transfer of facilities, which 
occurred on January 1, 2014.
    Procedural Matters: Any person may comment on this application by 
filing such comment at the address provided above. Any person seeking 
to become a party to this proceeding must file a motion to intervene at 
the address provided above in accordance with Rule 214 of FERC's Rules 
of Practice and Procedure (18 CFR 385.214). Two copies of each comment 
or motion to intervene should be filed with DOE on or before the date 
listed above.
    Additional copies of such motions to intervene also should be filed 
directly with: Nathan Martell, Bangor Hydro Electric Company, P.O. Box 
932, Bangor, Maine 04402 and Bonnie A. Suchman, Troutman Sander LLP, 
401 9th St. NW., Suite 1000, Washington, DC 20004.
    Before a Presidential permit may be granted or amended, DOE must 
determine that the proposed action will not adversely impact on the 
reliability of the U.S. electric power supply system. In addition, DOE 
must consider the environmental impacts of the proposed action (i.e., 
granting the Presidential permit or amendment, with any conditions and 
limitations, or denying the permit) pursuant to the National 
Environmental Policy Act of 1969. DOE also must obtain the concurrences 
of the Secretary of State and the Secretary of Defense before taking 
final action on a Presidential permit application.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above. In 
addition, the application may be reviewed or downloaded electronically 
at https://energy.gov/oe/services/electricity-policy-coordination-and-implementation/international-electricity-regulatio-2. Upon reaching the 
home page, select ``Pending Applications.''

    Issued in Washington, DC, on April 22, 2014.
Christopher A. Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery, and Energy 
Reliability.
[FR Doc. 2014-09649 Filed 4-25-14; 8:45 am]
BILLING CODE 6450-01-P