Loup River Public Power District; Notice of Authorization for Continued Project Operation, 22483 [2014-09069]
Download as PDF
Federal Register / Vol. 79, No. 77 / Tuesday, April 22, 2014 / Notices
• Comments from the DOE,
Tennessee Department of Environment
and Conservation, and Environmental
Protection Agency Liaisons.
• Public Comment Period.
• Presentation.
• Additions/Approval of Agenda.
• Motions/Approval of April 9, 2014
Meeting Minutes.
• Status of Recommendations with
DOE.
• Committee Reports.
• Federal Coordinator Report.
• Adjourn.
Public Participation: The EM SSAB,
Oak Ridge, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Melyssa P.
Noe at least seven days in advance of
the meeting at the phone number listed
above. Written statements may be filed
with the Board either before or after the
meeting. Individuals who wish to make
oral statements pertaining to the agenda
item should contact Melyssa P. Noe at
the address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Melyssa P. Noe at the
address and phone number listed above.
Minutes will also be available at the
following Web site: https://energy.gov/
orem/services/community-engagement/
oak-ridge-site-specific-advisory-board.
Issued at Washington, DC, on April 16,
2014.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2014–09119 Filed 4–21–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
[Project No. 1256–000]
Loup River Public Power District;
Notice of Authorization for Continued
Project Operation
On April 16, 2012, the Loup River
Public Power District, licensee for the
VerDate Mar<15>2010
16:26 Apr 21, 2014
Jkt 232001
Loup River Hydroelectric Project, filed
an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Loup River
Hydroelectric Project is located on the
Loup River, Loup Canal, and Platte
River in Nance and Platte counties,
Nebraska.
The license for Project No.1256 was
issued for a period ending April 15,
2014. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 USC
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No.1256 is
issued to the licensee for a period
effective April 16, 2014 through April
15, 2015 or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before April 15, 2015, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, Loup River Public
Power District, is authorized to continue
operation of the Loup River
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
PO 00000
Frm 00015
Fmt 4703
Sfmt 9990
22483
Dated: April 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–09069 Filed 4–21–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP14–736–000.
Applicants: Northwest Pipeline LLC.
Description: Plymouth Blu Water—
Missed In-service Date to be effective 4/
1/2014.
Filed Date: 4/14/14.
Accession Number: 20140414–5195.
Comments Due: 5 p.m. ET 4/28/14.
Docket Numbers: RP14–737–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: Volume 2 TOC Update to
be effective 5/15/2014.
Filed Date: 4/15/14.
Accession Number: 20140415–5023.
Comments Due: 5 p.m. ET 4/28/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 15, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–09113 Filed 4–21–14; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 79, Number 77 (Tuesday, April 22, 2014)]
[Notices]
[Page 22483]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-09069]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1256-000]
Loup River Public Power District; Notice of Authorization for
Continued Project Operation
On April 16, 2012, the Loup River Public Power District, licensee
for the Loup River Hydroelectric Project, filed an Application for a
New License pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The Loup River Hydroelectric
Project is located on the Loup River, Loup Canal, and Platte River in
Nance and Platte counties, Nebraska.
The license for Project No.1256 was issued for a period ending
April 15, 2014. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 USC 558(c), and
as set forth at 18 CFR 16.21(a), if the licensee of such project has
filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No.1256 is issued to
the licensee for a period effective April 16, 2014 through April 15,
2015 or until the issuance of a new license for the project or other
disposition under the FPA, whichever comes first. If issuance of a new
license (or other disposition) does not take place on or before April
15, 2015, notice is hereby given that, pursuant to 18 CFR 16.18(c), an
annual license under section 15(a)(1) of the FPA is renewed
automatically without further order or notice by the Commission, unless
the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the licensee, Loup River Public Power District, is
authorized to continue operation of the Loup River Hydroelectric
Project, until such time as the Commission acts on its application for
a subsequent license.
Dated: April 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-09069 Filed 4-21-14; 8:45 am]
BILLING CODE 6717-01-P