The City of Holyoke Gas & Electric Department; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 22485-22486 [2014-09068]
Download as PDF
Federal Register / Vol. 79, No. 77 / Tuesday, April 22, 2014 / Notices
Docket Numbers: RP14–735–000
Applicants: Northern Border Pipeline
Company.
Description: Maps 2014 to be effective
6/1/2014.
Filed Date: 4/14/14.
Accession Number: 20140414–5042.
Comments Due: 5 p.m. ET 4/28/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 14, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–09112 Filed 4–21–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2388–003]
tkelley on DSK3SPTVN1PROD with NOTICES
The City of Holyoke Gas & Electric
Department; Notice of Intent To File
License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2388–003.
c. Date Filed: January 31, 2014.
d. Submitted By: City of Holyoke Gas
& Electric Department.
e. Name of Project: Holyoke No. 3
Hydroelectric Project.
f. Location: Between the second and
third level canals on the Holyoke Canal
System adjacent to the Connecticut
River, in the city of Holyoke in
Hampden County, Massachusetts. The
project does not occupy federal land.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Paul
Ducheney, Superintendent, Holyoke Gas
VerDate Mar<15>2010
16:26 Apr 21, 2014
Jkt 232001
& Electric, 99 Suffolk Street, Holyoke,
MA 01040; (413) 536–9340; email—
ducheney@hged.com.
i. FERC Contact: Adam Beeco at (202)
502–8655; or email at
adam.beeco@ferc.gov.
j. Holyoke Gas and Electric filed its
request to use the Traditional Licensing
Process on January 31, 2014. Holyoke
Gas and Electric provided public notice
of its request on February 6, 2014. In a
letter dated April 15, 2014, the Director
of the Division of Hydropower
Licensing approved Holyoke Gas and
Electric’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Massachusetts State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Holyoke Gas and Electric as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section 106
of the National Historic Preservation
Act.
m. Holyoke Gas and Electric filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
22485
For assistance, contact FERC Online
Support.
Dated: April 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–09071 Filed 4–21–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2386–003]
The City of Holyoke Gas & Electric
Department; Notice of Intent To File
License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2386–003.
c. Date Filed: January 31, 2014.
d. Submitted By: City of Holyoke Gas
& Electric Department.
e. Name of Project: Holyoke No. 1
Hydroelectric Project.
f. Location: Between the first and
second level canals on the Holyoke
Canal System adjacent to the
Connecticut River, in the city of
Holyoke in Hampden County,
Massachusetts. The project does not
occupy federal land.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Paul
Ducheney, Superintendent, Holyoke Gas
& Electric, 99 Suffolk Street, Holyoke,
MA 01040; (413) 536–9340; email—
ducheney@hged.com.
i. FERC Contact: Adam Beeco at (202)
502–8655; or email at adam.beeco@
ferc.gov.
j. Holyoke Gas and Electric filed its
request to use the Traditional Licensing
Process on January 31, 2014. Holyoke
Gas and Electric provided public notice
of its request on February 6, 2014. In a
letter dated April 15, 2014, the Director
of the Division of Hydropower
Licensing approved Holyoke Gas and
Electric’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
E:\FR\FM\22APN1.SGM
22APN1
22486
Federal Register / Vol. 79, No. 77 / Tuesday, April 22, 2014 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Massachusetts State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Holyoke Gas and Electric as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section 106
of the National Historic Preservation
Act.
m. Holyoke Gas and Electric filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 2386.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by January 31,
2017.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–09068 Filed 4–21–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:26 Apr 21, 2014
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2153–043]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for License Amendment
b. Project No.: 2153–043
c. Date Filed: April 4, 2014
d. Applicants: United Water
Conservation District (licensee)
e. Name of Project: Santa Felicia
f. Location: Piru Creek in Ventura
County, CA
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Catherine
McCalvin, United Water Conservation
District, 106 North Eighth Street, Santa
Paula, CA 93060. Phone (805) 317–8985.
i. FERC Contact: Mr. John Aedo, (415)
369–3335, or john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice by the
Commission (May 14, 2014). The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
2153–043) on any comments, motions to
intervene, protests, or recommendations
filed.
k. Description of Request: The
licensee requests Commission approval
to amend license article 403, which
contains the minimum flow
requirements for the project. The
licensee proposes to instead, implement
the flow regime developed with the
National Marine Fisheries Service in its
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
2012 Water Release Plan. In addition,
the licensee proposes to exempt the
whitewater boating access requirements
of its project license during any
increased water releases over 200 cubic
feet per second occurring between
January 1 and May 1. The licensee
requests this access limitation in order
to avoid adverse impacts to steelhead in
Piru Creek. Finally, the licensee’s
application contains a water quality
certification from the California State
Water Resources Control Board, which
in addition to approving the revised
flow regime, requires that the licensee
develop a dissolved oxygen monitoring
plan.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 79, Number 77 (Tuesday, April 22, 2014)]
[Notices]
[Pages 22485-22486]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-09068]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2386-003]
The City of Holyoke Gas & Electric Department; Notice of Intent
To File License Application, Filing of Pre-Application Document, and
Approving Use of the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 2386-003.
c. Date Filed: January 31, 2014.
d. Submitted By: City of Holyoke Gas & Electric Department.
e. Name of Project: Holyoke No. 1 Hydroelectric Project.
f. Location: Between the first and second level canals on the
Holyoke Canal System adjacent to the Connecticut River, in the city of
Holyoke in Hampden County, Massachusetts. The project does not occupy
federal land.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Paul Ducheney, Superintendent,
Holyoke Gas & Electric, 99 Suffolk Street, Holyoke, MA 01040; (413)
536-9340; email_ducheney@hged.com.
i. FERC Contact: Adam Beeco at (202) 502-8655; or email at
adam.beeco@ferc.gov.
j. Holyoke Gas and Electric filed its request to use the
Traditional Licensing Process on January 31, 2014. Holyoke Gas and
Electric provided public notice of its request on February 6, 2014. In
a letter dated April 15, 2014, the Director of the Division of
Hydropower Licensing approved Holyoke Gas and Electric's request to use
the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing
[[Page 22486]]
regulations at 50 CFR 600.920. We are also initiating consultation with
the Massachusetts State Historic Preservation Officer, as required by
section 106, National Historical Preservation Act, and the implementing
regulations of the Advisory Council on Historic Preservation at 36 CFR
800.2.
l. With this notice, we are designating Holyoke Gas and Electric as
the Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 106 of the National Historic Preservation Act.
m. Holyoke Gas and Electric filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 2386. Pursuant to 18 CFR
16.8, 16.9, and 16.10, each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by January 31,
2017.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: April 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-09068 Filed 4-21-14; 8:45 am]
BILLING CODE 6717-01-P