Drawbridge Operation Regulation; Delaware River, NJ, 22398 [2014-09054]
Download as PDF
22398
Federal Register / Vol. 79, No. 77 / Tuesday, April 22, 2014 / Rules and Regulations
Vessels able to pass through the
bridge in the closed position may do so
at anytime. The bridge will be able to
open for emergencies and there is no
immediate alternate route for vessels to
pass. The Coast Guard will also inform
the users of the waterway through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessels can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 11, 2014.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2014–09063 Filed 4–21–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0928]
Drawbridge Operation Regulation;
Delaware River, NJ
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the bascule span
of the Tacony-Palmyra Bridge (Route
73), across the Delaware River, mile
107.2, between the townships of
Tacony, PA and Palmyra, NJ. The
deviation is necessary to facilitate the
replacement of the bridge deck. This
deviation allows the bridge to remain in
the closed to navigation position during
the rehabilitation project.
DATES: This deviation is effective from
9 p.m. on Friday, June 13, 2014 until 9
p.m. on Saturday, June 21, 2014.
ADDRESSES: The docket for this
deviation [USCG–2013–0928] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
ehiers on DSK2VPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:06 Apr 21, 2014
Jkt 232001
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Terrance
Knowles, Environmental Protection
Specialist, Coast Guard; telephone 757–
398–6587, email Terrance.A.Knowles@
uscg.mil. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations, at
202–366–9826.
SUPPLEMENTARY INFORMATION: The
Burlington County Bridge Commission,
who owns and operates this bascule
drawbridge, has requested a temporary
deviation from the current operating
regulations to facilitate the resurfacing
of the bridge roadway. The TaconyPalmyra Bridge (Route 73) at mile 107.2,
across the Delaware River, between PA
and NJ, has a vertical clearance in the
closed position of 50 feet above mean
high water.
Under the current operating schedule
set out in 33 CFR 117.5 and 117.716(b):
The regulation requires that the
drawbridge must open promptly and
fully for the passage of vessels when a
request or signal to open is given, and
that the opening not be delayed more
than five minutes.
Under this temporary deviation, the
bridge will be closed-to-navigation from
9 p.m., on June 13, 2014 until 9 p.m.,
on June 21, 2014. Vessels able to pass
through the bridge in the closed
position may do so at anytime. The
bridge will not be able to open for
emergencies and there is no alternate
route for vessels to pass this section of
the Delaware River.
The Coast Guard has coordinated this
with the Pilots Association for the Bay
and Delaware River, and will inform the
users of the waterway through our Local
and Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation. Waterway
traffic consists of freighters, recreational
boats, tugs, and barges.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 9, 2014.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2014–09054 Filed 4–21–14; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00042
Fmt 4700
Sfmt 4700
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2013–1060]
RIN 1625–AA00
Safety Zones; Eighth Coast Guard
District Annual and Recurring Safety
Zones Update
Coast Guard, DHS.
Interim final rule; request for
comments.
AGENCY:
ACTION:
The Coast Guard is amending
and updating its current list of recurring
safety zone regulations that take place in
the Eighth Coast Guard District area of
responsibility (AOR). This interim rule
informs the public of regularly
scheduled events that require additional
safety measures through establishing a
safety zone. Through this interim rule
the current list of recurring safety zones
is updated with revisions, additional
events, and removal of events that no
longer take place in the Eighth Coast
Guard District AOR. When these safety
zones are enforced, vessel traffic is
restricted from specified areas.
Additionally, this one rulemaking
project reduces administrative costs
involved in producing a separate rule
for each individual recurring safety zone
and serves to provide notice of the
known recurring safety zones
throughout the year.
DATES: This rule is effective April 22,
2014. Comments and related material
must be received by the Coast Guard on
or before May 22, 2014.
ADDRESSES: Documents mentioned in
this preamble are part of Docket Number
USCG–2013–1060. To view documents
mentioned in this preamble as being
available in the docket, go to
https://www.regulations.gov, type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH.’’ Click on ‘‘Open
Docket Folder’’ on the line associated
with this rulemaking. You may also visit
the Docket Management Facility in
Room W12–140 on the ground floor of
the Department of Transportation West
Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
You may submit comments, identified
by docket number, using any one of the
following methods:
(1) Federal eRulemaking Portal:
https://www.regulations.gov.
(2) Fax: (202) 493–2251.
SUMMARY:
E:\FR\FM\22APR1.SGM
22APR1
Agencies
[Federal Register Volume 79, Number 77 (Tuesday, April 22, 2014)]
[Rules and Regulations]
[Page 22398]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-09054]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0928]
Drawbridge Operation Regulation; Delaware River, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the bascule span of the Tacony-Palmyra
Bridge (Route 73), across the Delaware River, mile 107.2, between the
townships of Tacony, PA and Palmyra, NJ. The deviation is necessary to
facilitate the replacement of the bridge deck. This deviation allows
the bridge to remain in the closed to navigation position during the
rehabilitation project.
DATES: This deviation is effective from 9 p.m. on Friday, June 13, 2014
until 9 p.m. on Saturday, June 21, 2014.
ADDRESSES: The docket for this deviation [USCG-2013-0928] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Terrance Knowles, Environmental
Protection Specialist, Coast Guard; telephone 757-398-6587, email
Terrance.A.Knowles@uscg.mil. If you have questions on viewing the
docket, call Cheryl Collins, Program Manager, Docket Operations, at
202-366-9826.
SUPPLEMENTARY INFORMATION: The Burlington County Bridge Commission, who
owns and operates this bascule drawbridge, has requested a temporary
deviation from the current operating regulations to facilitate the
resurfacing of the bridge roadway. The Tacony-Palmyra Bridge (Route 73)
at mile 107.2, across the Delaware River, between PA and NJ, has a
vertical clearance in the closed position of 50 feet above mean high
water.
Under the current operating schedule set out in 33 CFR 117.5 and
117.716(b): The regulation requires that the drawbridge must open
promptly and fully for the passage of vessels when a request or signal
to open is given, and that the opening not be delayed more than five
minutes.
Under this temporary deviation, the bridge will be closed-to-
navigation from 9 p.m., on June 13, 2014 until 9 p.m., on June 21,
2014. Vessels able to pass through the bridge in the closed position
may do so at anytime. The bridge will not be able to open for
emergencies and there is no alternate route for vessels to pass this
section of the Delaware River.
The Coast Guard has coordinated this with the Pilots Association
for the Bay and Delaware River, and will inform the users of the
waterway through our Local and Broadcast Notices to Mariners of the
change in operating schedule for the bridge so that vessels can arrange
their transits to minimize any impact caused by the temporary
deviation. Waterway traffic consists of freighters, recreational boats,
tugs, and barges.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: April 9, 2014.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2014-09054 Filed 4-21-14; 8:45 am]
BILLING CODE 9110-04-P