WBI Energy Transmission, Inc.; Notice of Request Under Blanket Authorization, 21756 [2014-08752]
Download as PDF
21756
Federal Register / Vol. 79, No. 74 / Thursday, April 17, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–131–000]
TKELLEY on DSK3SPTVN1PROD with NOTICES
WBI Energy Transmission, Inc.; Notice
of Request Under Blanket
Authorization
Take notice that on April 1, 2014,
WBI Energy Transmission, Inc. (WBI
Energy), 1250 West Century Avenue,
Bismarck, North Dakota 58501, filed a
prior notice application pursuant to
sections 157.205 and 157.211 of the
Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
WBI Energy’s blanket certificate issued
in Docket No. CP82–487–000, for
authorization to construct and operate
delivery point facilities in Stark County,
North Dakota. Specifically, WBI Energy
seeks authority to construct, own and
operate a new meter station that will
provide up to 9.744 million cubic feet
(MMcf) per day of natural gas service to
Dakota Prairie Refining, LLC.
Additionally, WBI Energy proposes to
relocate the existing Dickson West town
border station (Dickson West TBS) and
purchase approximately 6,300 feet of
existing steel natural gas pipeline from
Montana-Dakota (DPR Lateral), all as
more fully set forth in the application,
which is open to the public for
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Keith
A. Tiggelaar, Director of Regulatory
Affairs, WBI Energy Transmission, Inc.,
1250 West Century Avenue, Bismarck,
North Dakota 58503, or (701)-530–1560
or by email keith.tiggelaar@
wbienergy.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
VerDate Mar<15>2010
17:28 Apr 16, 2014
Jkt 232001
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Dated: April 11, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–08752 Filed 4–16–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–130–000]
Equitrans, L.P.; Notice of Request
Under Blanket Authorization
Take notice that on April 1, 2014,
Equitrans, L.P., (Equitrans), 625 Liberty
Avenue, Suite 1700, Pittsburgh,
Pennsylvania 15222, filed in Docket No.
CP14–130–000, a prior notice request
pursuant to sections 157.205, 157.208,
and 157.210 of the Commission’s
regulations under the Natural Gas Act
for authorization to construct its
proposed H–305 Project located in
Greene County, Pennsylvania. Equitrans
proposes to install its new H–305
pipeline, which consist of
approximately 3.4 miles of 24-inch
diameter pipe, extending from
Equitrans’ interconnect with EQT
Gathering LLC’s Jupiter Compressor
Station to Equitrans’ existing Braden
Run Interconnect. This project will help
expand the Mainline System by up to
50,000 Dth per day, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to Paul
W. Diehl, Senior Counsel—Midstream,
EQT Corporation, 625 Liberty Avenue,
Suite 1700, Pittsburgh, PA 15222, or by
calling (412) 395–5540, or by email
pdiehl@eqt.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 79, Number 74 (Thursday, April 17, 2014)]
[Notices]
[Page 21756]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-08752]
[[Page 21756]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-131-000]
WBI Energy Transmission, Inc.; Notice of Request Under Blanket
Authorization
Take notice that on April 1, 2014, WBI Energy Transmission, Inc.
(WBI Energy), 1250 West Century Avenue, Bismarck, North Dakota 58501,
filed a prior notice application pursuant to sections 157.205 and
157.211 of the Federal Energy Regulatory Commission's (Commission)
regulations under the Natural Gas Act (NGA), and WBI Energy's blanket
certificate issued in Docket No. CP82-487-000, for authorization to
construct and operate delivery point facilities in Stark County, North
Dakota. Specifically, WBI Energy seeks authority to construct, own and
operate a new meter station that will provide up to 9.744 million cubic
feet (MMcf) per day of natural gas service to Dakota Prairie Refining,
LLC. Additionally, WBI Energy proposes to relocate the existing Dickson
West town border station (Dickson West TBS) and purchase approximately
6,300 feet of existing steel natural gas pipeline from Montana-Dakota
(DPR Lateral), all as more fully set forth in the application, which is
open to the public for inspection. The filing may also be viewed on the
web at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to
Keith A. Tiggelaar, Director of Regulatory Affairs, WBI Energy
Transmission, Inc., 1250 West Century Avenue, Bismarck, North Dakota
58503, or (701)-530-1560 or by email keith.tiggelaar@wbienergy.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: April 11, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-08752 Filed 4-16-14; 8:45 am]
BILLING CODE 6717-01-P