Sunshine Act Meeting Notice, 21231-21232 [2014-08672]
Download as PDF
Federal Register / Vol. 79, No. 72 / Tuesday, April 15, 2014 / Notices
and telephone number of the person
commenting or protesting; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments or protests must set forth
their evidentiary basis and otherwise
comply with the requirements of 18 CFR
4.34(b). All comments or protests
should relate to project works which are
the subject of the termination of license.
A copy of any protest must be served
upon each representative of the licensee
specified in item g above. A copy of all
other filings in reference to this notice
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
PLACE:
Dated: April 7, 2014.
Kimberly D. Bose,
Secretary.
STATUS:
21231
Room 2C, 888 First Street NE.,
Washington, DC 20426.
Open.
Agenda.
* NOTE—Items listed on the agenda
may be deleted without further notice.
MATTERS TO BE CONSIDERED:
[FR Doc. 2014–08407 Filed 4–14–14; 8:45 am]
BILLING CODE 6717–01–P
CONTACT PERSON FOR MORE INFORMATION:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: April 17, 2014, 10:00
a.m.
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
1004TH—MEETING, REGULAR MEETING
[April 17, 2014, 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 ..............
A–2 ..............
AD02–1–000 .............
AD02–7–000 .............
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Electric
E–1 ..............
E–9 ..............
E–10 ............
ER13–64–001 ...........
ER13–65–001 ...........
ER13–67–001 ...........
ER13–68–001 ...........
ER13–127–002 .........
ER14–1331–000 .......
ER14–1332–000 .......
EL14–33–000.
ER14–354–000 .........
ER14–381–000 .........
ER13–2233–001 .......
ER13–1292–001 .......
ER10–1138–001 .......
ER12–316–000.
OMITTED.
EL14–14–000 ............
E–11 ............
EL14–13–000 ............
E–2 ..............
E–3 ..............
E–4
E–5
E–6
E–7
E–8
..............
..............
..............
..............
..............
PacifiCorp.
Deseret Generation & Transmission Cooperative, Inc.
NorthWestern Corporation.
Portland General Electric Company.
Idaho Power Company.
Southern California Edison Company.
DATC Path 15, LLC.
Florida Power & Light Company.
PJM Interconnection, L.L.C.
Midcontinent Independent System Operator, Inc.
Southwest Power Pool, Inc.
NorthWestern Corporation.
California Wind Energy Association and First Solar, Inc. v. California Independent System Operator Corporation and Southern California Edison Company.
Arkansas Electric Cooperative Corporation v. Oklahoma Gas and Electric Company.
mstockstill on DSK4VPTVN1PROD with NOTICES
Hydro
H–1
H–2
H–3
H–4
H–5
H–6
H–7
..............
..............
..............
..............
..............
..............
..............
P–2232–522 ..............
P–18–095 ..................
P–2210–240 ..............
P–516–480 ................
P–12693–004 ............
P–14493–001 ............
CD14–15–001 ...........
Duke Energy Carolinas, LLC.
Idaho Power Company.
Appalachian Power Company.
South Carolina Electric and Gas Company.
Sutton Hydroelectric Company LLC.
KC Pittsfield LLC.
ECOsponsible, Inc.
Certificates
C–1 ..............
C–2 ..............
C–3 ..............
VerDate Mar<15>2010
CP12–491–001 .........
CP13–523–000 .........
CP14–32–000 ...........
18:06 Apr 14, 2014
Trunkline Gas Company, LLC.
Transcontinental Gas Pipe Line Company, LLC.
Panhandle Eastern Pipe Line Company, LP.
Jkt 232001
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
E:\FR\FM\15APN1.SGM
15APN1
21232
Federal Register / Vol. 79, No. 72 / Tuesday, April 15, 2014 / Notices
Issued: April 10, 2014.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2014–08672 Filed 4–11–14; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–132–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Gulf Oil Limited Partnership; Notice of
Petition for Declaratory Order
Take notice that on April 1, 2014,
Gulf Oil Limited Partnership pursuant
to section 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207 (2013) filed
a Petition for Declaratory Order for the
construction and operation of a
liquefied natural gas (LNG) production
facility which Gulf Oil plans to
construct in northeastern Pennsylvania
in order to convert natural gas produced
in the Marcellus Shale play into LNG
that will be marketed as vehicular fuel,
high horsepower engine fuel, and as a
source of supply for certain local
distribution company peak shaving
facilities will not be subject to the
Commission’s jurisdiction under
Section 7 of the Natural Gas Act and
will not make the owner or operator of
that LNG facility a ‘‘natural-gas
company’’ within the meaning of
Section 1(b) of the NGA.
VerDate Mar<15>2010
18:06 Apr 14, 2014
Jkt 232001
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 1, 2014.
Dated: April 8, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–08430 Filed 4–14–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–36–000]
FirstEnergy Solutions Corporation;
Notice of Petition for Declaratory Order
Take notice that on April 7, 2014,
FirstEnergy Solutions Corporation,
pursuant to section 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure 18 CFR
385.207(a)(2), filed a petition for
declaratory order requesting that the
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
Commission determine that PJM
Interconnection, L.L.C.’s (PJM) Open
Access Transmission Tariff requires a
generator’s Market Seller Offer Cap in
Reliability Pricing Model to reflect the
unit’s cost-based energy offers in the
calculation of net Projected PJM Market
Revenues.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 18, 2014.
Dated: April 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–08403 Filed 4–14–14; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\15APN1.SGM
15APN1
Agencies
[Federal Register Volume 79, Number 72 (Tuesday, April 15, 2014)]
[Notices]
[Pages 21231-21232]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-08672]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: April 17, 2014, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* NOTE--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
1004th--Meeting, Regular Meeting
[April 17, 2014, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1......................... AD02-1-000............................ Agency Business Matters.
A-2......................... AD02-7-000............................ Customer Matters, Reliability, Security
and Market Operations.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1......................... ER13-64-001........................... PacifiCorp.
ER13-65-001........................... Deseret Generation & Transmission
Cooperative, Inc.
ER13-67-001........................... NorthWestern Corporation.
ER13-68-001........................... Portland General Electric Company.
ER13-127-002.......................... Idaho Power Company.
E-2......................... ER14-1331-000......................... Southern California Edison Company.
E-3......................... ER14-1332-000......................... DATC Path 15, LLC.
EL14-33-000...........................
E-4......................... ER14-354-000.......................... Florida Power & Light Company.
E-5......................... ER14-381-000.......................... PJM Interconnection, L.L.C.
E-6......................... ER13-2233-001......................... Midcontinent Independent System Operator,
Inc.
E-7......................... ER13-1292-001......................... Southwest Power Pool, Inc.
E-8......................... ER10-1138-001......................... NorthWestern Corporation.
ER12-316-000..........................
E-9......................... OMITTED...............................
E-10........................ EL14-14-000........................... California Wind Energy Association and
First Solar, Inc. v. California
Independent System Operator Corporation
and Southern California Edison Company.
E-11........................ EL14-13-000........................... Arkansas Electric Cooperative Corporation
v. Oklahoma Gas and Electric Company.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1......................... P-2232-522............................ Duke Energy Carolinas, LLC.
H-2......................... P-18-095.............................. Idaho Power Company.
H-3......................... P-2210-240............................ Appalachian Power Company.
H-4......................... P-516-480............................. South Carolina Electric and Gas Company.
H-5......................... P-12693-004........................... Sutton Hydroelectric Company LLC.
H-6......................... P-14493-001........................... KC Pittsfield LLC.
H-7......................... CD14-15-001........................... ECOsponsible, Inc.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1......................... CP12-491-001.......................... Trunkline Gas Company, LLC.
C-2......................... CP13-523-000.......................... Transcontinental Gas Pipe Line Company,
LLC.
C-3......................... CP14-32-000........................... Panhandle Eastern Pipe Line Company, LP.
----------------------------------------------------------------------------------------------------------------
[[Page 21232]]
Issued: April 10, 2014.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its webcast. The
Capitol Connection provides technical support for the free webcasts. It
also offers access to this event via television in the DC area and via
phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2014-08672 Filed 4-11-14; 4:15 pm]
BILLING CODE 6717-01-P