Sunshine Act Meeting Notice, 21231-21232 [2014-08672]

Download as PDF Federal Register / Vol. 79, No. 72 / Tuesday, April 15, 2014 / Notices and telephone number of the person commenting or protesting; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments or protests should relate to project works which are the subject of the termination of license. A copy of any protest must be served upon each representative of the licensee specified in item g above. A copy of all other filings in reference to this notice must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described proceeding. If any agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. PLACE: Dated: April 7, 2014. Kimberly D. Bose, Secretary. STATUS: 21231 Room 2C, 888 First Street NE., Washington, DC 20426. Open. Agenda. * NOTE—Items listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: [FR Doc. 2014–08407 Filed 4–14–14; 8:45 am] BILLING CODE 6717–01–P CONTACT PERSON FOR MORE INFORMATION: DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: April 17, 2014, 10:00 a.m. Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 1004TH—MEETING, REGULAR MEETING [April 17, 2014, 10:00 a.m.] Item No. Docket No. Company Administrative A–1 .............. A–2 .............. AD02–1–000 ............. AD02–7–000 ............. Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. Electric E–1 .............. E–9 .............. E–10 ............ ER13–64–001 ........... ER13–65–001 ........... ER13–67–001 ........... ER13–68–001 ........... ER13–127–002 ......... ER14–1331–000 ....... ER14–1332–000 ....... EL14–33–000. ER14–354–000 ......... ER14–381–000 ......... ER13–2233–001 ....... ER13–1292–001 ....... ER10–1138–001 ....... ER12–316–000. OMITTED. EL14–14–000 ............ E–11 ............ EL14–13–000 ............ E–2 .............. E–3 .............. E–4 E–5 E–6 E–7 E–8 .............. .............. .............. .............. .............. PacifiCorp. Deseret Generation & Transmission Cooperative, Inc. NorthWestern Corporation. Portland General Electric Company. Idaho Power Company. Southern California Edison Company. DATC Path 15, LLC. Florida Power & Light Company. PJM Interconnection, L.L.C. Midcontinent Independent System Operator, Inc. Southwest Power Pool, Inc. NorthWestern Corporation. California Wind Energy Association and First Solar, Inc. v. California Independent System Operator Corporation and Southern California Edison Company. Arkansas Electric Cooperative Corporation v. Oklahoma Gas and Electric Company. mstockstill on DSK4VPTVN1PROD with NOTICES Hydro H–1 H–2 H–3 H–4 H–5 H–6 H–7 .............. .............. .............. .............. .............. .............. .............. P–2232–522 .............. P–18–095 .................. P–2210–240 .............. P–516–480 ................ P–12693–004 ............ P–14493–001 ............ CD14–15–001 ........... Duke Energy Carolinas, LLC. Idaho Power Company. Appalachian Power Company. South Carolina Electric and Gas Company. Sutton Hydroelectric Company LLC. KC Pittsfield LLC. ECOsponsible, Inc. Certificates C–1 .............. C–2 .............. C–3 .............. VerDate Mar<15>2010 CP12–491–001 ......... CP13–523–000 ......... CP14–32–000 ........... 18:06 Apr 14, 2014 Trunkline Gas Company, LLC. Transcontinental Gas Pipe Line Company, LLC. Panhandle Eastern Pipe Line Company, LP. Jkt 232001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\15APN1.SGM 15APN1 21232 Federal Register / Vol. 79, No. 72 / Tuesday, April 15, 2014 / Notices Issued: April 10, 2014. Kimberly D. Bose, Secretary. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2014–08672 Filed 4–11–14; 4:15 pm] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–132–000] mstockstill on DSK4VPTVN1PROD with NOTICES Gulf Oil Limited Partnership; Notice of Petition for Declaratory Order Take notice that on April 1, 2014, Gulf Oil Limited Partnership pursuant to section 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207 (2013) filed a Petition for Declaratory Order for the construction and operation of a liquefied natural gas (LNG) production facility which Gulf Oil plans to construct in northeastern Pennsylvania in order to convert natural gas produced in the Marcellus Shale play into LNG that will be marketed as vehicular fuel, high horsepower engine fuel, and as a source of supply for certain local distribution company peak shaving facilities will not be subject to the Commission’s jurisdiction under Section 7 of the Natural Gas Act and will not make the owner or operator of that LNG facility a ‘‘natural-gas company’’ within the meaning of Section 1(b) of the NGA. VerDate Mar<15>2010 18:06 Apr 14, 2014 Jkt 232001 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on May 1, 2014. Dated: April 8, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–08430 Filed 4–14–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL14–36–000] FirstEnergy Solutions Corporation; Notice of Petition for Declaratory Order Take notice that on April 7, 2014, FirstEnergy Solutions Corporation, pursuant to section 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure 18 CFR 385.207(a)(2), filed a petition for declaratory order requesting that the PO 00000 Frm 00030 Fmt 4703 Sfmt 9990 Commission determine that PJM Interconnection, L.L.C.’s (PJM) Open Access Transmission Tariff requires a generator’s Market Seller Offer Cap in Reliability Pricing Model to reflect the unit’s cost-based energy offers in the calculation of net Projected PJM Market Revenues. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on April 18, 2014. Dated: April 8, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–08403 Filed 4–14–14; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\15APN1.SGM 15APN1

Agencies

[Federal Register Volume 79, Number 72 (Tuesday, April 15, 2014)]
[Notices]
[Pages 21231-21232]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-08672]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: April 17, 2014, 10:00 a.m.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda.
    * NOTE--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

                                        1004th--Meeting, Regular Meeting
                                          [April 17, 2014, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
          Item No.                          Docket No.                                  Company
----------------------------------------------------------------------------------------------------------------
                                                 Administrative
----------------------------------------------------------------------------------------------------------------
A-1.........................  AD02-1-000............................  Agency Business Matters.
A-2.........................  AD02-7-000............................  Customer Matters, Reliability, Security
                                                                       and Market Operations.
----------------------------------------------------------------------------------------------------------------
                                                    Electric
----------------------------------------------------------------------------------------------------------------
E-1.........................  ER13-64-001...........................  PacifiCorp.
                              ER13-65-001...........................  Deseret Generation & Transmission
                                                                       Cooperative, Inc.
                              ER13-67-001...........................  NorthWestern Corporation.
                              ER13-68-001...........................  Portland General Electric Company.
                              ER13-127-002..........................  Idaho Power Company.
E-2.........................  ER14-1331-000.........................  Southern California Edison Company.
E-3.........................  ER14-1332-000.........................  DATC Path 15, LLC.
                              EL14-33-000...........................
E-4.........................  ER14-354-000..........................  Florida Power & Light Company.
E-5.........................  ER14-381-000..........................  PJM Interconnection, L.L.C.
E-6.........................  ER13-2233-001.........................  Midcontinent Independent System Operator,
                                                                       Inc.
E-7.........................  ER13-1292-001.........................  Southwest Power Pool, Inc.
E-8.........................  ER10-1138-001.........................  NorthWestern Corporation.
                              ER12-316-000..........................
E-9.........................  OMITTED...............................
E-10........................  EL14-14-000...........................  California Wind Energy Association and
                                                                       First Solar, Inc. v. California
                                                                       Independent System Operator Corporation
                                                                       and Southern California Edison Company.
E-11........................  EL14-13-000...........................  Arkansas Electric Cooperative Corporation
                                                                       v. Oklahoma Gas and Electric Company.
----------------------------------------------------------------------------------------------------------------
                                                      Hydro
----------------------------------------------------------------------------------------------------------------
H-1.........................  P-2232-522............................  Duke Energy Carolinas, LLC.
H-2.........................  P-18-095..............................  Idaho Power Company.
H-3.........................  P-2210-240............................  Appalachian Power Company.
H-4.........................  P-516-480.............................  South Carolina Electric and Gas Company.
H-5.........................  P-12693-004...........................  Sutton Hydroelectric Company LLC.
H-6.........................  P-14493-001...........................  KC Pittsfield LLC.
H-7.........................  CD14-15-001...........................  ECOsponsible, Inc.
----------------------------------------------------------------------------------------------------------------
                                                  Certificates
----------------------------------------------------------------------------------------------------------------
C-1.........................  CP12-491-001..........................  Trunkline Gas Company, LLC.
C-2.........................  CP13-523-000..........................  Transcontinental Gas Pipe Line Company,
                                                                       LLC.
C-3.........................  CP14-32-000...........................  Panhandle Eastern Pipe Line Company, LP.
----------------------------------------------------------------------------------------------------------------



[[Page 21232]]

    Issued: April 10, 2014.
Kimberly D. Bose,
Secretary.

    A free webcast of this event is available through www.ferc.gov. 
Anyone with Internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The event will contain a link to its webcast. The 
Capitol Connection provides technical support for the free webcasts. It 
also offers access to this event via television in the DC area and via 
phone bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or contact Danelle Springer or David 
Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2014-08672 Filed 4-11-14; 4:15 pm]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.