ORPC Alaska 2, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 19065 [2014-07692]
Download as PDF
Federal Register / Vol. 79, No. 66 / Monday, April 7, 2014 / Notices
Dated: April 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07693 Filed 4–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13821–001]
mstockstill on DSK4VPTVN1PROD with NOTICES
ORPC Alaska 2, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 3, 2014, the ORPC Alaska
2, LLC, filed an application for a
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the East Foreland Tidal Energy
Project (East Foreland project or project)
to be located in Cook Inlet near Nikiski
in the Kenai Peninsula Borough, Alaska.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A series of 150kilowatt TideGen® turbine-generator
modules with a combined capacity of no
more than 5 megawatts; (2) a 1- to 8mile-long, 13.5-kilovolt (kV) direct
current submarine transmission cable
from the module site to an onshore
station on the west coast of the Kenai
Peninsula; (3) an approximately 0.25mile-long, 4.16- to 34.5-kV three-phase
alternating current terrestrial
transmission line connecting the
onshore station to a substation site
owned by Homer Electric Association;
and (4) appurtenant facilities. The
estimated annual generation of the East
Foreland project would be up to 17.2
gigawatt-hours.
Applicant Contact: Monty
Worthington, Director of Project
Development, ORPC Alaska 2, LLC, 725
Christensen Drive, Suite A, Anchorage,
AK 99501; phone: (907) 388–8639.
FERC Contact: Sean O’Neill; phone:
(202) 502–6462.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
VerDate Mar<15>2010
17:49 Apr 04, 2014
Jkt 232001
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number
P–13821–001.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13821) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: April 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07692 Filed 4–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Transmission Infrastructure Program
Western Area Power
Administration, DOE.
ACTION: Notice of revised program and
request for project proposals.
AGENCY:
The Western Area Power
Administration (Western) hereby
announces its revised Transmission
Infrastructure Program (the Program or
TIP) and its request for new project
proposals. The Program implements
Section 402 of the American Recovery
and Reinvestment Act of 2009 (Recovery
Act) for the purpose of constructing,
financing, facilitating, planning,
operating, maintaining, or studying
construction of new or upgraded electric
power transmission lines and related
facilities with at least one terminus
within Western’s service territory, to
deliver or facilitate the delivery of
power generated by renewable energy
SUMMARY:
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
19065
resources constructed, or reasonably
expected to be constructed, after the
date the Recovery Act was enacted.
Through the publication of this Federal
Register notice (FRN or final notice)
Western is finalizing revisions to this
Program effective and seeks new project
proposals from developers and other
parties interested in obtaining financing
for eligible projects. This final notice
adopts and reaffirms the principles that
the Program is separate and distinct
from Western’s power marketing
functions, and each eligible project must
stand on its own for repayment
purposes.
DATES: Revisions to the Program are
effective as of May 7, 2014.
FOR FURTHER INFORMATION CONTACT:
Please contact Mr. John Kral,
Transmission Infrastructure Program,
Western Area Power Administration,
P.O. Box 281213, Lakewood, CO 80228,
telephone (720) 962–7710, email TIP@
wapa.gov. This FRN is also available on
Western’s Web site at https://
ww2.wapa.gov/sites/Western/
transmission/TIP/Pages/default.aspx.
SUPPLEMENTARY INFORMATION:
Background
Western markets and transmits
wholesale hydroelectric power
generated at Federal dams across the
western United States. Western’s
transmission system was developed to
deliver Federal hydroelectric power to
preference customers. Western owns
and operates a transmission system with
more than 17,000 circuit-mile, highvoltage lines and also markets power
across 15 western states and a 1.3
million square-mile service area.
Western’s service area encompasses all
of the following states: Arizona,
California, Colorado, Nebraska, Nevada,
New Mexico, North Dakota, South
Dakota, Utah, and Wyoming; and parts
of Iowa, Kansas, Montana, Minnesota,
and Texas. Western markets excess
capacity on its transmission system
consistent with the policies and
procedures outlined in its Open Access
Transmission Tariff (OATT) on file with
the Federal Energy Regulatory
Commission. Western offers
nondiscriminatory access to its
transmission system, including requests
to interconnect new generating
resources to its transmission system,
under its OATT.
The Program implements Section 402
of the Recovery Act, which amends
Section 301 of the Hoover Power Plant
Act of 1984. The Program uses the
authority granted under these statutes to
borrow up to $3.25 billion from the U.S.
Department of the Treasury to develop
E:\FR\FM\07APN1.SGM
07APN1
Agencies
[Federal Register Volume 79, Number 66 (Monday, April 7, 2014)]
[Notices]
[Page 19065]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07692]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13821-001]
ORPC Alaska 2, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On March 3, 2014, the ORPC Alaska 2, LLC, filed an application for
a successive preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the East
Foreland Tidal Energy Project (East Foreland project or project) to be
located in Cook Inlet near Nikiski in the Kenai Peninsula Borough,
Alaska. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) A series
of 150-kilowatt TideGen[supreg] turbine-generator modules with a
combined capacity of no more than 5 megawatts; (2) a 1- to 8-mile-long,
13.5-kilovolt (kV) direct current submarine transmission cable from the
module site to an onshore station on the west coast of the Kenai
Peninsula; (3) an approximately 0.25-mile-long, 4.16- to 34.5-kV three-
phase alternating current terrestrial transmission line connecting the
onshore station to a substation site owned by Homer Electric
Association; and (4) appurtenant facilities. The estimated annual
generation of the East Foreland project would be up to 17.2 gigawatt-
hours.
Applicant Contact: Monty Worthington, Director of Project
Development, ORPC Alaska 2, LLC, 725 Christensen Drive, Suite A,
Anchorage, AK 99501; phone: (907) 388-8639.
FERC Contact: Sean O'Neill; phone: (202) 502-6462.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13821-001.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13821) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: April 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07692 Filed 4-4-14; 8:45 am]
BILLING CODE 6717-01-P