FirstLight Hydro Generating Company; Notice of Dispute Resolution Panel Meeting and Technical Conference, 18906 [2014-07534]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
18906
Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices
much inefficiency exists in the current
process?
Discussion of these topics should
highlight any advances made since last
year’s conference and provide context
for any proposals or presentations on
best practices, other analyses of current
operations with respect to these and
related topics, and provide opportunity
to discuss existing practices that need
improvement.
The technical conference will be held
in conference rooms 3M–2, 3M–3, and
3M–4 at the Federal Energy Regulatory
Commission headquarters, 888 First
Street NE., Washington, DC 20426. All
interested participants are invited to
attend, and participants with ideas for
relevant presentations are invited to
nominate themselves to speak at the
conference.
Speaker nominations must be
submitted on or before April 16, 2014
through the Commission’s Web site 2 by
providing the proposed speaker’s
contact information along with a title,
abstract, and list of contributing authors
for the proposed presentation. Proposed
presentations should be closely related
to the topics discussed above. Speakers
and presentations will be selected to
ensure relevant topics and to
accommodate time constraints.
Although registration is not required
for general attendance by United States
citizens, we encourage those planning to
attend the conference to register through
the Commission’s Web site.3 We will
provide nametags for those who register
on or before June 19, 2014.
Due to new security procedures, we
strongly encourage attendees who are
not citizens of the United States to
register for the conference by June 2,
2014, in order to avoid any delay
associated with being processed by
FERC security.
The Commission will accept
comments following the conference,
with a deadline of July 31, 2014.
There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
866 208–3676 (toll free). For TTY, call
202 502–8659.
A WebEx will be available. Off-site
participants interested in listening via
teleconference or listening and viewing
the presentations through WebEx must
2 The speaker nomination form is located at
https://www.ferc.gov/whats-new/registration/realmarket-6-23-14-speaker-form.asp.
3 The registration form is located at https://
www.ferc.gov/whats-new/registration/real-market-623-14-form.asp.
VerDate Mar<15>2010
17:37 Apr 03, 2014
Jkt 232001
register at https://www.ferc.gov/whatsnew/registration/real-market-6-23-14form.asp, and do so by 5:00 p.m. EST
on June 16, 2014. WebEx and
teleconferencing may not be available to
those who do not register.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations.
For further information about these
conferences, please contact:
Sarah McKinley (Logistical
Information), Office of External
Affairs, (202) 502–8004,
Sarah.McKinley@ferc.gov.
Daniel Kheloussi (Technical
Information), Office of Energy Policy
and Innovation, (202) 502–6391,
Daniel.Kheloussi@ferc.gov.
Dated: March 28, 2014.
Kimberly D. Bose,
Secretary.
clarification on written submissions as
necessary to understand the matters in
dispute. The Panel will limit all input
that it receives to the specific study or
information in dispute and will focus on
the applicability of the study or
information to the study criteria
stipulated in 18 CFR 5.9(b). If the
number of participants wishing to speak
creates time constraints, the Panel may,
at its discretion, limit the speaking time
for each participant.
If you have any questions, please
contact Bill Connelly, Dispute
Resolution Panel Chair, at
william.connelly@ferc.gov or (202) 502–
8587.
Technical Conference
Date: Tuesday, April 8, 2014.
Time: 9:00 a.m.–4:00 p.m. (EDT).
Place: Northfield Mountain Visitor
Center, 99 Millers Falls Road (Route 63),
Northfield, MA 01360.
Dated: March 31, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07534 Filed 4–3–14; 8:45 am]
[FR Doc. 2014–07500 Filed 4–3–14; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP14–121–000]
[Project No. 2485–063]
FirstLight Hydro Generating Company;
Notice of Dispute Resolution Panel
Meeting and Technical Conference
On March 28, 2014, Commission staff,
in response to the filing of a Notice of
Study Dispute by the U.S. Fish and
Wildlife Service (FWS) on March 13,
2014, convened a single three-person
Dispute Resolution Panel (Panel)
pursuant to 18 CFR 5.14(d).
The Panel will hold a technical
conference at the time and place
identified below. The technical
conference will address the study
dispute regarding the need to quantify
the entrainment of American shad eggs
and larvae into the Northfield Mountain
Pumped Storage Project (P–2485) as
requested by FWS in its study request
filed on March 4, 2014.
The purpose of the technical session
is for the disputing agency, applicant,
and Commission to provide the Panel
with additional information necessary
to evaluate the disputed study. All local,
state, and federal agencies, Indian tribes,
and other interested parties are invited
to attend the meeting as observers. The
Panel may also request information or
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Strom, Inc.; Notice of Petition for
Declaratory Order
Take notice that on March 24, 2014,
Strom, Inc. pursuant to section 207(a)(2)
of the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.207
(2013) filed a Petition for Declaratory
Order seeking to utilize a new portable
LNG liquefication technology (‘‘LNG/
B’’) to convert Natural Gas purchased
from FERC regulated companies. The
LNG will be utilized by U.S.
corporations and/or exported pursuant
to Strom’s export applications
submitted to the U.S. Department of
Energy-Fossil Fuel Section, and in
accordance with section 3 of the NGA.
Strom contends that since this is a
portable system and not a LNG terminal
as defined by the NGA and not a facility
as defined by law, that no FERC permit
is required. Strom contends that any
permit should be issued by the State
Commission in Florida and/or local
jurisdictions. Strom also contends that it
is a third party marketer of a product
regulated by FERC under the NGA.
Any person desiring to intervene or to
protest this filing must file in
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 79, Number 65 (Friday, April 4, 2014)]
[Notices]
[Page 18906]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07534]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2485-063]
FirstLight Hydro Generating Company; Notice of Dispute Resolution
Panel Meeting and Technical Conference
On March 28, 2014, Commission staff, in response to the filing of a
Notice of Study Dispute by the U.S. Fish and Wildlife Service (FWS) on
March 13, 2014, convened a single three-person Dispute Resolution Panel
(Panel) pursuant to 18 CFR 5.14(d).
The Panel will hold a technical conference at the time and place
identified below. The technical conference will address the study
dispute regarding the need to quantify the entrainment of American shad
eggs and larvae into the Northfield Mountain Pumped Storage Project (P-
2485) as requested by FWS in its study request filed on March 4, 2014.
The purpose of the technical session is for the disputing agency,
applicant, and Commission to provide the Panel with additional
information necessary to evaluate the disputed study. All local, state,
and federal agencies, Indian tribes, and other interested parties are
invited to attend the meeting as observers. The Panel may also request
information or clarification on written submissions as necessary to
understand the matters in dispute. The Panel will limit all input that
it receives to the specific study or information in dispute and will
focus on the applicability of the study or information to the study
criteria stipulated in 18 CFR 5.9(b). If the number of participants
wishing to speak creates time constraints, the Panel may, at its
discretion, limit the speaking time for each participant.
If you have any questions, please contact Bill Connelly, Dispute
Resolution Panel Chair, at william.connelly@ferc.gov or (202) 502-8587.
Technical Conference
Date: Tuesday, April 8, 2014.
Time: 9:00 a.m.-4:00 p.m. (EDT).
Place: Northfield Mountain Visitor Center, 99 Millers Falls Road
(Route 63), Northfield, MA 01360.
Dated: March 31, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07534 Filed 4-3-14; 8:45 am]