Download as PDF Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices Filed Date: 3/27/14. Accession Number: 20140327–5198. Comments Due: 5 p.m. ET 4/17/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 28, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–07538 Filed 4–3–14; 8:45 am] BILLING CODE 6717–01–P Dated: March 28, 2014. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY [FR Doc. 2014–07496 Filed 4–3–14; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket No. EL13–62–000] DEPARTMENT OF ENERGY mstockstill on DSK4VPTVN1PROD with NOTICES Independent Power Producers of New York, Inc. v. New York Independent System Operator, Inc.; Notice of Amendment to Complaint Take notice that on March 25, 2014, Independent Power Producers of New York, Inc. (IPPNY or Complainant) filed an amendment to its May 10, 2013, Complaint against New York Independent System Operator, Inc. (NYISO or Respondent). IPPNY certifies that copies of the complaint were served on the contacts of NYISO as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must VerDate Mar<15>2010 17:37 Apr 03, 2014 be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on April 14, 2014. Jkt 232001 Federal Energy Regulatory Commission [Docket No. CP14–87–000] Southeast Supply Header, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed SESH Expansion Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the SESH Expansion Project involving construction and operation of facilities by Southeast Supply Header, LLC (SESH) in Copiah County, Mississippi. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues they need to PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 18901 evaluate in the EA. Please note that the scoping period will close on April 28, 2014. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. SESH provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Summary of the Proposed Project SESH requests approval to construct and operate a new compressor station, associated connecting piping, and appurtenant facilities in Copiah County, Mississippi. The SESH Expansion Project would create about 25,000 dekatherms per day (Dth/d) of new capacity on the SESH mainline as well as change the mainline design to reflect a total 45,000 Dth/d increase in capacity. The SESH Expansion Project would consist of the following facilities: • New compressor facilities (the ‘‘Dentville Compressor Station’’) at the SESH/Texas Eastern Transmission, LP Interconnect, which include a single 8,000 horsepower natural gas-fired reciprocating engine compressor package; • approximately 4,000 feet of new 20inch-diameter connecting piping and related appurtenances from the proposed Dentville Compressor Station site to an existing metering and regulating (M&R) station on the SESH mainline at milepost 73.05 and southsouthwest of the Dentville Compressor Station site; and E:\FR\FM\04APN1.SGM 04APN1 18902 Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices • modifications at the existing M&R station to accommodate the proposed connecting piping tie-in as well as install a launcher and receiver facility. The general location of the project facilities is shown in appendix 1.1 Land Requirements for Construction Construction of the proposed facilities would disturb about 32.4 acres of land for the aboveground facilities and the pipeline. Following construction, SESH would maintain about 23.5 acres for permanent operation of the project’s facilities; the remaining acreage would be restored and revert to former uses. The EA Process mstockstill on DSK4VPTVN1PROD with NOTICES The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 2 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • land use, recreation, and aesthetics; • water resources and wetlands; • cultural resources; • vegetation, fisheries, and wildlife; • air quality and noise; • endangered and threatened species; and • public safety. We will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. VerDate Mar<15>2010 17:37 Apr 03, 2014 Jkt 232001 available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section below. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this project to formally cooperate with us in the preparation of the EA.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before April 28, 2014. For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the project docket number (CP14–87–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for interested persons to submit brief, text-only comments on a project; (2) You can file your comments electronically using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, E:\FR\FM\04APN1.SGM 04APN1 Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP14–87). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: March 28, 2014. Kimberly D. Bose, Secretary. affect the quality of the human environment. A copy of the final EA is on file with the Commission and is available for public inspection. The final EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. For further information, contact Steve Kartalia at (202) 502–6131 or Stephen.Kartalia@ferc.gov. Dated: March 28, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–07501 Filed 4–3–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [FR Doc. 2014–07502 Filed 4–3–14; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket Nos. CP13–73–000; CP13–74–000] Sierrita Gas Pipeline LLC; Notice of Availability of the Final Environmental Impact Statement for the Proposed Sierrita Pipeline Project DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790–002–CT] mstockstill on DSK4VPTVN1PROD with NOTICES Andrew Peklo III; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for an original license for the Pomperaug Hydro Project, to be located on the Pomperaug River, in the town of Woodbury, Litchfield County, Connecticut, and has prepared a final Environmental Assessment (EA). The final EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly VerDate Mar<15>2010 17:37 Apr 03, 2014 Jkt 232001 The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a final environmental impact statement (EIS) for the Sierrita Pipeline Project, proposed by Sierrita Gas Pipeline LLC (Sierrita) in the above-referenced dockets. Sierrita requests authorization to link El Paso Natural Gas Company’s existing South Mainline System near Tucson to an interconnect with the ´ Sasabe-Guaymas Pipeline at the U.S.Mexico border near the town of Sasabe, Arizona, that would provide up to 200,846 dekatherms per day of natural gas to markets in Mexico. The final EIS assesses the potential environmental effects of the construction and operation of the Sierrita Pipeline Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with the mitigation measures recommended in PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 18903 the EIS, would have some adverse environmental impact; however, most of these impacts would be reduced to lessthan-significant levels. The U.S. Fish and Wildlife Service (FWS)—Arizona Ecological Services Office; the FWS—Buenos Aires National Wildlife Refuge; the Arizona Game and Fish Department; and the U.S. Customs and Border Protection participated as cooperating agencies in the preparation of the EIS. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis. Although the cooperating agencies provided input to the conclusions and recommendations presented in the final EIS, the agencies will present their own conclusions and recommendations in their respective Records of Decision for the project. The final EIS addresses the potential environmental effects of the construction and operation of the following project facilities: • 60.9 miles of 36-inch-diameter natural gas pipeline in Pima County, Arizona; • two meter stations; • two pig launchers and two pig receivers 1; and • six mainline valves. The FERC staff mailed copies of the EIS to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; newspapers and libraries in the project area; and parties to this proceeding. Paper copy versions of the EIS were mailed to those specifically requesting them; all others received a CD version. In addition, the EIS is available for public viewing on the FERC’s Web site (www.ferc.gov) using the eLibrary link. A limited number of copies are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502–8371. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search,’’ and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP13–73 or CP13–74). Be sure you have selected 1 A pig is an internal tool that can be used to clean and dry a pipeline and/or to inspect it for damage or corrosion. E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 79, Number 65 (Friday, April 4, 2014)]
[Notices]
[Pages 18901-18903]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07502]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-87-000]


Southeast Supply Header, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed SESH Expansion Project and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the SESH Expansion Project 
involving construction and operation of facilities by Southeast Supply 
Header, LLC (SESH) in Copiah County, Mississippi. The Commission will 
use this EA in its decision-making process to determine whether the 
project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine what issues they need to evaluate in the EA. Please note that 
the scoping period will close on April 28, 2014.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    SESH provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically-asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Summary of the Proposed Project

    SESH requests approval to construct and operate a new compressor 
station, associated connecting piping, and appurtenant facilities in 
Copiah County, Mississippi. The SESH Expansion Project would create 
about 25,000 dekatherms per day (Dth/d) of new capacity on the SESH 
mainline as well as change the mainline design to reflect a total 
45,000 Dth/d increase in capacity.
    The SESH Expansion Project would consist of the following 
facilities:
     New compressor facilities (the ``Dentville Compressor 
Station'') at the SESH/Texas Eastern Transmission, LP Interconnect, 
which include a single 8,000 horsepower natural gas-fired reciprocating 
engine compressor package;
     approximately 4,000 feet of new 20-inch-diameter 
connecting piping and related appurtenances from the proposed Dentville 
Compressor Station site to an existing metering and regulating (M&R) 
station on the SESH mainline at milepost 73.05 and south-southwest of 
the Dentville Compressor Station site; and

[[Page 18902]]

     modifications at the existing M&R station to accommodate 
the proposed connecting piping tie-in as well as install a launcher and 
receiver facility.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 32.4 
acres of land for the aboveground facilities and the pipeline. 
Following construction, SESH would maintain about 23.5 acres for 
permanent operation of the project's facilities; the remaining acreage 
would be restored and revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     land use, recreation, and aesthetics;
     water resources and wetlands;
     cultural resources;
     vegetation, fisheries, and wildlife;
     air quality and noise;
     endangered and threatened species; and
     public safety.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section below.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that the Commission receives them in Washington, DC on or before April 
28, 2014.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the project docket number (CP14-87-000) with your submission. 
The Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for interested persons to 
submit brief, text-only comments on a project;
    (2) You can file your comments electronically using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the User's Guide under the ``e-filing'' link on the Commission's Web 
site.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs,

[[Page 18903]]

at (866) 208-FERC, or on the FERC Web site at www.ferc.gov using the 
``eLibrary'' link. Click on the eLibrary link, click on ``General 
Search'' and enter the docket number, excluding the last three digits 
in the Docket Number field (i.e., CP14-87). Be sure you have selected 
an appropriate date range. For assistance, please contact FERC Online 
Support at FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, 
or for TTY, contact (202) 502-8659. The eLibrary link also provides 
access to the texts of formal documents issued by the Commission, such 
as orders, notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: March 28, 2014.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2014-07502 Filed 4-3-14; 8:45 am]
BILLING CODE 6717-01-P