Southeast Supply Header, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed SESH Expansion Project and Request for Comments on Environmental Issues, 18901-18903 [2014-07502]
Download as PDF
Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices
Filed Date: 3/27/14.
Accession Number: 20140327–5198.
Comments Due: 5 p.m. ET 4/17/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 28, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–07538 Filed 4–3–14; 8:45 am]
BILLING CODE 6717–01–P
Dated: March 28, 2014.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2014–07496 Filed 4–3–14; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. EL13–62–000]
DEPARTMENT OF ENERGY
mstockstill on DSK4VPTVN1PROD with NOTICES
Independent Power Producers of New
York, Inc. v. New York Independent
System Operator, Inc.; Notice of
Amendment to Complaint
Take notice that on March 25, 2014,
Independent Power Producers of New
York, Inc. (IPPNY or Complainant) filed
an amendment to its May 10, 2013,
Complaint against New York
Independent System Operator, Inc.
(NYISO or Respondent).
IPPNY certifies that copies of the
complaint were served on the contacts
of NYISO as listed on the Commission’s
list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
VerDate Mar<15>2010
17:37 Apr 03, 2014
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 14, 2014.
Jkt 232001
Federal Energy Regulatory
Commission
[Docket No. CP14–87–000]
Southeast Supply Header, LLC; Notice
of Intent To Prepare an Environmental
Assessment for the Proposed SESH
Expansion Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the SESH Expansion Project involving
construction and operation of facilities
by Southeast Supply Header, LLC
(SESH) in Copiah County, Mississippi.
The Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
18901
evaluate in the EA. Please note that the
scoping period will close on April 28,
2014.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
SESH provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
Summary of the Proposed Project
SESH requests approval to construct
and operate a new compressor station,
associated connecting piping, and
appurtenant facilities in Copiah County,
Mississippi. The SESH Expansion
Project would create about 25,000
dekatherms per day (Dth/d) of new
capacity on the SESH mainline as well
as change the mainline design to reflect
a total 45,000 Dth/d increase in
capacity.
The SESH Expansion Project would
consist of the following facilities:
• New compressor facilities (the
‘‘Dentville Compressor Station’’) at the
SESH/Texas Eastern Transmission, LP
Interconnect, which include a single
8,000 horsepower natural gas-fired
reciprocating engine compressor
package;
• approximately 4,000 feet of new 20inch-diameter connecting piping and
related appurtenances from the
proposed Dentville Compressor Station
site to an existing metering and
regulating (M&R) station on the SESH
mainline at milepost 73.05 and southsouthwest of the Dentville Compressor
Station site; and
E:\FR\FM\04APN1.SGM
04APN1
18902
Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices
• modifications at the existing M&R
station to accommodate the proposed
connecting piping tie-in as well as
install a launcher and receiver facility.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 32.4 acres of land
for the aboveground facilities and the
pipeline. Following construction, SESH
would maintain about 23.5 acres for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
The EA Process
mstockstill on DSK4VPTVN1PROD with NOTICES
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use, recreation, and aesthetics;
• water resources and wetlands;
• cultural resources;
• vegetation, fisheries, and wildlife;
• air quality and noise;
• endangered and threatened species;
and
• public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
VerDate Mar<15>2010
17:37 Apr 03, 2014
Jkt 232001
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
below.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before April 28,
2014.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP14–87–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
3 The
Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
E:\FR\FM\04APN1.SGM
04APN1
Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP14–87). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: March 28, 2014.
Kimberly D. Bose,
Secretary.
affect the quality of the human
environment.
A copy of the final EA is on file with
the Commission and is available for
public inspection. The final EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Steve
Kartalia at (202) 502–6131 or
Stephen.Kartalia@ferc.gov.
Dated: March 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07501 Filed 4–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2014–07502 Filed 4–3–14; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket Nos. CP13–73–000; CP13–74–000]
Sierrita Gas Pipeline LLC; Notice of
Availability of the Final Environmental
Impact Statement for the Proposed
Sierrita Pipeline Project
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12790–002–CT]
mstockstill on DSK4VPTVN1PROD with NOTICES
Andrew Peklo III; Notice of Availability
of Final Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for an original license for the
Pomperaug Hydro Project, to be located
on the Pomperaug River, in the town of
Woodbury, Litchfield County,
Connecticut, and has prepared a final
Environmental Assessment (EA).
The final EA contains the staff’s
analysis of the potential environmental
impacts of the project and concludes
that licensing the project, with
appropriate environmental protective
measures, would not constitute a major
federal action that would significantly
VerDate Mar<15>2010
17:37 Apr 03, 2014
Jkt 232001
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Sierrita Pipeline Project,
proposed by Sierrita Gas Pipeline LLC
(Sierrita) in the above-referenced
dockets. Sierrita requests authorization
to link El Paso Natural Gas Company’s
existing South Mainline System near
Tucson to an interconnect with the
´
Sasabe-Guaymas Pipeline at the U.S.Mexico border near the town of Sasabe,
Arizona, that would provide up to
200,846 dekatherms per day of natural
gas to markets in Mexico.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Sierrita Pipeline Project in accordance
with the requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with the
mitigation measures recommended in
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
18903
the EIS, would have some adverse
environmental impact; however, most of
these impacts would be reduced to lessthan-significant levels.
The U.S. Fish and Wildlife Service
(FWS)—Arizona Ecological Services
Office; the FWS—Buenos Aires National
Wildlife Refuge; the Arizona Game and
Fish Department; and the U.S. Customs
and Border Protection participated as
cooperating agencies in the preparation
of the EIS. Cooperating agencies have
jurisdiction by law or special expertise
with respect to resources potentially
affected by the proposal and participate
in the NEPA analysis. Although the
cooperating agencies provided input to
the conclusions and recommendations
presented in the final EIS, the agencies
will present their own conclusions and
recommendations in their respective
Records of Decision for the project.
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following project facilities:
• 60.9 miles of 36-inch-diameter
natural gas pipeline in Pima County,
Arizona;
• two meter stations;
• two pig launchers and two pig
receivers 1; and
• six mainline valves.
The FERC staff mailed copies of the
EIS to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding.
Paper copy versions of the EIS were
mailed to those specifically requesting
them; all others received a CD version.
In addition, the EIS is available for
public viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies are available
for distribution and public inspection
at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
number excluding the last three digits in
the Docket Number field (i.e., CP13–73
or CP13–74). Be sure you have selected
1 A pig is an internal tool that can be used to
clean and dry a pipeline and/or to inspect it for
damage or corrosion.
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 79, Number 65 (Friday, April 4, 2014)]
[Notices]
[Pages 18901-18903]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07502]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-87-000]
Southeast Supply Header, LLC; Notice of Intent To Prepare an
Environmental Assessment for the Proposed SESH Expansion Project and
Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the SESH Expansion Project
involving construction and operation of facilities by Southeast Supply
Header, LLC (SESH) in Copiah County, Mississippi. The Commission will
use this EA in its decision-making process to determine whether the
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on April 28, 2014.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
SESH provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' This fact sheet addresses a number of typically-asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC Web site (www.ferc.gov).
Summary of the Proposed Project
SESH requests approval to construct and operate a new compressor
station, associated connecting piping, and appurtenant facilities in
Copiah County, Mississippi. The SESH Expansion Project would create
about 25,000 dekatherms per day (Dth/d) of new capacity on the SESH
mainline as well as change the mainline design to reflect a total
45,000 Dth/d increase in capacity.
The SESH Expansion Project would consist of the following
facilities:
New compressor facilities (the ``Dentville Compressor
Station'') at the SESH/Texas Eastern Transmission, LP Interconnect,
which include a single 8,000 horsepower natural gas-fired reciprocating
engine compressor package;
approximately 4,000 feet of new 20-inch-diameter
connecting piping and related appurtenances from the proposed Dentville
Compressor Station site to an existing metering and regulating (M&R)
station on the SESH mainline at milepost 73.05 and south-southwest of
the Dentville Compressor Station site; and
[[Page 18902]]
modifications at the existing M&R station to accommodate
the proposed connecting piping tie-in as well as install a launcher and
receiver facility.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 32.4
acres of land for the aboveground facilities and the pipeline.
Following construction, SESH would maintain about 23.5 acres for
permanent operation of the project's facilities; the remaining acreage
would be restored and revert to former uses.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
land use, recreation, and aesthetics;
water resources and wetlands;
cultural resources;
vegetation, fisheries, and wildlife;
air quality and noise;
endangered and threatened species; and
public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section below.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\3\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before April
28, 2014.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP14-87-000) with your submission.
The Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs,
[[Page 18903]]
at (866) 208-FERC, or on the FERC Web site at www.ferc.gov using the
``eLibrary'' link. Click on the eLibrary link, click on ``General
Search'' and enter the docket number, excluding the last three digits
in the Docket Number field (i.e., CP14-87). Be sure you have selected
an appropriate date range. For assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov or toll free at (866) 208-3676,
or for TTY, contact (202) 502-8659. The eLibrary link also provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: March 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07502 Filed 4-3-14; 8:45 am]