FFP Missouri 5, LLC, FFP Missouri 6, LLC, Solia 6 Hydroelectric, LLC; Notice of Applications Tendered for Filing With the Commission and Soliciting Additional Study Requests, 18899-18900 [2014-07499]
Download as PDF
Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07497 Filed 4–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13757–002; Project No. 13761–
002; Project No. 13768–002]
FFP Missouri 5, LLC, FFP Missouri 6,
LLC, Solia 6 Hydroelectric, LLC; Notice
of Applications Tendered for Filing
With the Commission and Soliciting
Additional Study Requests
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Type of Applications: Original
Major Licenses.
b. Project Nos.: 13757–002; 13761–
002; 13768–002.
c. Dates Filed: March 14, 2014.
d. Applicants: FFP Missouri 5, LLC;
FFP Missouri 6, LLC; Solia 6
Hydroelectric, LLC. All applicants are
subsidiaries of Free Flow Power
Corporation.
e. Names of Projects: Emsworth Locks
and Dam Hydroelectric Project, 13757–
002; Emsworth Back Channel
Hydroelectric Project, 13761–002;
Montgomery Locks and Dam
Hydroelectric Project, 13768–002.
f. Locations: The proposed projects
would be located at U.S. Army Corps of
Engineers’ (Corps) dams on the Ohio
River in Allegheny and Beaver counties,
Pennsylvania (see table below for
specific locations). The projects would
occupy 23.5 acres of federal land
managed by the Corps.
Projects
County and State
P–13757 .......
P–13761 .......
P–13768 .......
mstockstill on DSK4VPTVN1PROD with NOTICES
Project No.
Emsworth Locks and Dam ......................................
Emsworth Back Channel Dam ................................
Montgomery Locks & Dam .....................................
Allegheny, PA ..........................................................
Allegheny, PA ..........................................................
Beaver, PA ..............................................................
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Thomas
Feldman, Vice President, Free Flow
Power Corporation, 239 Causeway
Street, Suite 300, Boston, MA 02114; or
at (978) 283–2822.
Ramya Swaminathan, Chief Operating
Officer, Free Flow Power Corporation,
239 Causeway Street, Suite 300, Boston,
MA 02114; or at (978) 238–2822.
Daniel Lissner, General Counsel, Free
Flow Power Corporation, 239 Causeway
Street, Suite 300, Boston, MA 02114; or
at (978) 283–2822.
i. FERC Contact: Brandi Sangunett,
(202) 502–8393 or brandi.sangunett@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian tribe, or
person believes that an additional
scientific study should be conducted in
VerDate Mar<15>2010
17:37 Apr 03, 2014
Jkt 232001
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: May 13, 2014.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include the
docket number(s) for the project(s) (e.g.,
P–13757–002).
m. The applications are not ready for
environmental analysis at this time.
n. The proposed Emsworth Locks and
Dam Hydroelectric Project would be the
most upstream project at river mile (RM)
6.2 and would consist of the following
new facilities: (1) A 205-foot-long, 180foot-wide intake channel containing a
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
18899
City/town
Emsworth.
Emsworth.
Borough of Industry.
30-foot-long, 63.5-foot-high, 180-footwide intake structure with 5-inch bar
spacing trashracks; (2) a 180-foot-long,
77-foot-high, 180-foot-wide reinforced
concrete powerhouse on the south bank
of the river; (3) four turbine-generator
units with a combined capacity of 24
megawatts (MW); (4) a 380-foot-long,
280-foot-wide tailrace; (5) a 50-foot-long
by 60-foot-wide substation; (6) a 1,893foot-long, 69-kilovolt (kV), overhead
transmission line to connect the project
substation to an existing substation; and
(7) appurtenant facilities. The average
annual generation would be 101,300
megawatt-hours (MWh).
The proposed Emsworth Back
Channel Dam Hydroelectric Project
would be located at RM 6.8 and consist
of the following new facilities: (1) A
100-foot-long, 165-foot-wide intake
channel containing a 32-foot-long, 63.5foot-high, 90-foot-wide intake structure
with 5-inch bar spacing trashracks; (2) a
150-foot-long, 77-foot-high, 90-foot-wide
reinforced concrete powerhouse on the
north bank of the river; (3) two turbinegenerator units with a combined
capacity of 12.0 MW; (4) a 190-foot-long,
105-foot-wide tailrace; (5) a 50-foot-long
by 60-foot-wide substation; (6) a 3,758foot-long, 69-kV, overhead transmission
line to connect the project substation to
an existing substation; and (7)
appurtenant facilities. The average
annual generation would be 53,500
MWh.
E:\FR\FM\04APN1.SGM
04APN1
18900
Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices
The proposed Montgomery Locks and
Dam Hydroelectric Project would be
located at RM 31.7 and consist of the
following new facilities: (1) A 340-footlong, 205-foot-wide intake channel
containing a 150-foot-long, 90-foot-high,
205-foot-wide intake structure with 5inch bar spacing trashracks; (2) a 315foot-long, 105-foot-high, 205-foot-wide
reinforced concrete powerhouse on the
north bank of the river; (3) three turbinegenerator units with a combined
capacity of 42 MW; (4) a 280-foot-long,
210-foot-wide tailrace; (5) a 50-foot-long
by 60-foot-wide substation; (6) a 392foot-long, 69-kV, overhead transmission
line to connect the project substation to
an existing distribution line; and (7)
appurtenant facilities. The average
annual generation would be 194,370
MWh.
Free Flow Power proposes to operate
all three projects in a ‘‘run-of-river’’
mode using flows made available by the
Corps. The proposed projects would not
change existing flow releases or water
surface elevations upstream or
downstream of the proposed projects.
o. Location of the Applications: A
copy of each application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. Copies are
also available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
mstockstill on DSK4VPTVN1PROD with NOTICES
Milestone
Issue Notice of Acceptance
Issue Scoping Document 1
for Comments.
Hold Scoping Meeting .......
Comments Due on
Scoping Document 1.
Issue Scoping Document 2
Issue Notice of Ready for
Environmental Analysis.
Commission Issues EA .....
VerDate Mar<15>2010
Date
April 2014.
May 2014.
June 2014.
July 2014.
August 2014.
August 2014.
February 2015.
17:37 Apr 03, 2014
Jkt 232001
Dated: March 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07499 Filed 4–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2847–001;
ER10–2818–001; ER10–2806–001; ER10–
1948–003.
Applicants: TransAlta Centralia
Generation LLC, TransAlta Energy
Marketing Corporation, TransAlta
Energy Marketing (U.S.) Inc., FPL
Energy Wyoming, LLC.
Description: Supplement to December
31, 2013 Triennial Market Power
Analysis in Northwest Region and
Notice of Change in Status of the
Transalta MBR Entities.
Filed Date: 3/27/14.
Accession Number: 20140327–5192.
Comments Due: 5 p.m. ET 4/17/14.
Docket Numbers: ER14–1001–001.
Applicants: Southern California
Edison Company.
Description: Revised LGIA and Distrib
Service Agmt with Coram California
Development, L.P. to be effective 12/15/
2013.
Filed Date: 3/28/14.
Accession Number: 20140328–5005.
Comments Due: 5 p.m. ET 4/18/14.
Docket Numbers: ER14–1343–001.
Applicants: Bargain Energy, LLC.
Description: Bargain Energy MBR
Supplement—Clone to be effective 4/1/
2014.
Filed Date: 3/28/14.
Accession Number: 20140328–5000.
Comments Due: 5 p.m. ET 4/18/14.
Docket Numbers: ER13–1487–002.
Applicants: Quantum Auburndale
Power, LP.
Description: Quantum Auburndale
Power, LP Revised Electric Tariff Filing
to be effective 3/29/2014.
Filed Date: 3/28/14.
Accession Number: 20140328–5071.
Comments Due: 5 p.m. ET 4/18/14.
Docket Numbers: ER13–1487–003;
ER13–1489–002; ER13–1488–001.
Applicants: Quantum Auburndale
Power, LP, Quantum Lake Power, LP,
Quantum Pasco Power, LP.
Description: Notification of NonMaterial Change in Status of the
Quantum Entities.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Filed Date: 3/26/14.
Accession Number: 20140326–5183.
Comments Due: 5 p.m. ET 4/16/14.
Docket Numbers: ER13–1489–003.
Applicants: Quantum Lake Power, LP.
Description: Notification of NonMaterial Change in Status of Quantum
Lake Power, LP.
Filed Date: 3/26/14.
Accession Number: 20140326–5184.
Comments Due: 5 p.m. ET 4/16/14.
Docket Numbers: ER14–1603–000.
Applicants: CCES LLC.
Description: CCES Notice of
Cancellation—Clone to be effective 3/
28/2014.
Filed Date: 3/27/14.
Accession Number: 20140327–5174.
Comments Due: 5 p.m. ET 4/17/14.
Docket Numbers: ER14–1604–000.
Applicants: Southern California
Edison Company.
Description: 2014 TACBAA Update to
be effective 6/1/2014.
Filed Date: 3/28/14.
Accession Number: 20140328–5002.
Comments Due: 5 p.m. ET 4/18/14.
Docket Numbers: ER14–1605–000.
Applicants: Nevada Power Company.
Description: Notice of Termination of
Dynamic Scheduling Agreement of
Nevada Power Company.
Filed Date: 3/27/14.
Accession Number: 20140327–5190.
Comments Due: 5 p.m. ET 4/17/14.
Docket Numbers: ER14–1606–000.
Applicants: Cosima Energy, LLC.
Description: Cosima Energy MBR
Tariff Filing to be effective 5/1/2014.
Filed Date: 3/28/14.
Accession Number: 20140328–5098.
Comments Due: 5 p.m. ET 4/18/14.
Docket Numbers: ER14–1607–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Queue W1–072A_AT5;
Original SA No. 3796 & Cancellation of
SA No. 3380 to be effective 2/26/2014.
Filed Date: 3/28/14.
Accession Number: 20140328–5145.
Comments Due: 5 p.m. ET 4/18/14.
Docket Numbers: ER14–1608–000.
Applicants: Public Service Electric
and Gas Company, PJM Interconnection,
L.L.C.
Description: PSE&G submits revisions
to OATTAtt H–10A re BLC Project to be
effective 5/28/2014.
Filed Date: 3/28/14.
Accession Number: 20140328–5168.
Comments Due: 5 p.m. ET 4/18/14.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH14–8–000.
Applicants: Sycamore Gas, Inc.
Description: Sycamore Gas, Inc.
submits FERC 65–A Exemption
Notification.
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 79, Number 65 (Friday, April 4, 2014)]
[Notices]
[Pages 18899-18900]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07499]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13757-002; Project No. 13761-002; Project No. 13768-002]
FFP Missouri 5, LLC, FFP Missouri 6, LLC, Solia 6 Hydroelectric,
LLC; Notice of Applications Tendered for Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection.
a. Type of Applications: Original Major Licenses.
b. Project Nos.: 13757-002; 13761-002; 13768-002.
c. Dates Filed: March 14, 2014.
d. Applicants: FFP Missouri 5, LLC; FFP Missouri 6, LLC; Solia 6
Hydroelectric, LLC. All applicants are subsidiaries of Free Flow Power
Corporation.
e. Names of Projects: Emsworth Locks and Dam Hydroelectric Project,
13757-002; Emsworth Back Channel Hydroelectric Project, 13761-002;
Montgomery Locks and Dam Hydroelectric Project, 13768-002.
f. Locations: The proposed projects would be located at U.S. Army
Corps of Engineers' (Corps) dams on the Ohio River in Allegheny and
Beaver counties, Pennsylvania (see table below for specific locations).
The projects would occupy 23.5 acres of federal land managed by the
Corps.
----------------------------------------------------------------------------------------------------------------
Project No. Projects County and State City/town
----------------------------------------------------------------------------------------------------------------
P-13757.................. Emsworth Locks and Dam.. Allegheny, PA.......... Emsworth.
P-13761.................. Emsworth Back Channel Allegheny, PA.......... Emsworth.
Dam.
P-13768.................. Montgomery Locks & Dam.. Beaver, PA............. Borough of Industry.
----------------------------------------------------------------------------------------------------------------
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Thomas Feldman, Vice President, Free Flow
Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; or
at (978) 283-2822.
Ramya Swaminathan, Chief Operating Officer, Free Flow Power
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; or at
(978) 238-2822.
Daniel Lissner, General Counsel, Free Flow Power Corporation, 239
Causeway Street, Suite 300, Boston, MA 02114; or at (978) 283-2822.
i. FERC Contact: Brandi Sangunett, (202) 502-8393 or
brandi.sangunett@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: May 13, 2014.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
the docket number(s) for the project(s) (e.g., P-13757-002).
m. The applications are not ready for environmental analysis at
this time.
n. The proposed Emsworth Locks and Dam Hydroelectric Project would
be the most upstream project at river mile (RM) 6.2 and would consist
of the following new facilities: (1) A 205-foot-long, 180-foot-wide
intake channel containing a 30-foot-long, 63.5-foot-high, 180-foot-wide
intake structure with 5-inch bar spacing trashracks; (2) a 180-foot-
long, 77-foot-high, 180-foot-wide reinforced concrete powerhouse on the
south bank of the river; (3) four turbine-generator units with a
combined capacity of 24 megawatts (MW); (4) a 380-foot-long, 280-foot-
wide tailrace; (5) a 50-foot-long by 60-foot-wide substation; (6) a
1,893-foot-long, 69-kilovolt (kV), overhead transmission line to
connect the project substation to an existing substation; and (7)
appurtenant facilities. The average annual generation would be 101,300
megawatt-hours (MWh).
The proposed Emsworth Back Channel Dam Hydroelectric Project would
be located at RM 6.8 and consist of the following new facilities: (1) A
100-foot-long, 165-foot-wide intake channel containing a 32-foot-long,
63.5-foot-high, 90-foot-wide intake structure with 5-inch bar spacing
trashracks; (2) a 150-foot-long, 77-foot-high, 90-foot-wide reinforced
concrete powerhouse on the north bank of the river; (3) two turbine-
generator units with a combined capacity of 12.0 MW; (4) a 190-foot-
long, 105-foot-wide tailrace; (5) a 50-foot-long by 60-foot-wide
substation; (6) a 3,758-foot-long, 69-kV, overhead transmission line to
connect the project substation to an existing substation; and (7)
appurtenant facilities. The average annual generation would be 53,500
MWh.
[[Page 18900]]
The proposed Montgomery Locks and Dam Hydroelectric Project would
be located at RM 31.7 and consist of the following new facilities: (1)
A 340-foot-long, 205-foot-wide intake channel containing a 150-foot-
long, 90-foot-high, 205-foot-wide intake structure with 5-inch bar
spacing trashracks; (2) a 315-foot-long, 105-foot-high, 205-foot-wide
reinforced concrete powerhouse on the north bank of the river; (3)
three turbine-generator units with a combined capacity of 42 MW; (4) a
280-foot-long, 210-foot-wide tailrace; (5) a 50-foot-long by 60-foot-
wide substation; (6) a 392-foot-long, 69-kV, overhead transmission line
to connect the project substation to an existing distribution line; and
(7) appurtenant facilities. The average annual generation would be
194,370 MWh.
Free Flow Power proposes to operate all three projects in a ``run-
of-river'' mode using flows made available by the Corps. The proposed
projects would not change existing flow releases or water surface
elevations upstream or downstream of the proposed projects.
o. Location of the Applications: A copy of each application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. Copies are
also available for inspection and reproduction at the address in item h
above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
------------------------------------------------------------------------
Milestone Date
------------------------------------------------------------------------
Issue Notice of Acceptance............. April 2014.
Issue Scoping Document 1 for Comments.. May 2014.
Hold Scoping Meeting................... June 2014.
Comments Due on Scoping Document 1..... July 2014.
Issue Scoping Document 2............... August 2014.
Issue Notice of Ready for Environmental August 2014.
Analysis.
Commission Issues EA................... February 2015.
------------------------------------------------------------------------
Dated: March 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07499 Filed 4-3-14; 8:45 am]
BILLING CODE 6717-01-P