Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 18907 [2014-07493]
Download as PDF
Federal Register / Vol. 79, No. 65 / Friday, April 4, 2014 / Notices
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 18, 2014.
Dated: March 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07495 Filed 4–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project No. 14575–000]
Archon Energy 1, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 6, 2014, Archon Energy 1,
Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Black Butte Afterbay Hydropower
Project (Black Butte Project or project) to
VerDate Mar<15>2010
17:37 Apr 03, 2014
Jkt 232001
be located on Stony Creek, near the city
of Orland, Glenn County, California.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The project would be located at the
U.S. Army Corps of Engineering’s Black
Butte dam and would utilize existing
infrastructure and afterbay of the dam.
The proposed project would consist of
the following: (1) A bypass intake in the
afterbay of Black Butte reservoir; (2) two
2,800-foot-long pressurized, reinforced
concrete pipes creating approximately
20 feet of head; (3) a powerhouse,
containing two low-head, 2.5-megawatt
Kaplan turbine-generators; and (4) an
undefined interconnection point to the
grid within several hundred feet of the
proposed powerhouse. The estimated
annual generation of the Black Butte
Project would be 22,000 megawatthours.
Applicant Contact: Mr. Paul Grist,
President, Archon Energy 1, Inc., 101 E.
Kennedy Blvd., Suite 2800, Tampa,
Florida 33602; phone: (415) 377–2460.
FERC Contact: Adam Beeco; phone:
(202) 502–8655.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14575–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
18907
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14575) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07493 Filed 4–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14597–000]
FFP Project 100, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 3, 2014, FFP Project 100,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of
hydropower at the U.S. Army Corps of
Engineers’ (Corps) C. W. Bill Young
Lock and Dam located on the Allegheny
River in Allegheny County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed C. W. Bill Young Lock
and Dam Hydroelectric Project would
consist of the following: (1) A new 150foot-wide, 200-foot-long intake channel;
(2) a new 200-foot-long by 200-foot-wide
concrete powerhouse containing three
generating units each rated at 5.0
megawatts (MW) having a total installed
capacity of 15 MW; (3) a new 100-footwide, 300-foot-long tailrace channel; (4)
new concrete retaining walls upstream
of the intake and downstream of the
new powerhouse; (5) a new 40-foot-long
by 40-foot-wide substation; (6) a new
69-kilovolt transmission line
approximately 6,129 feet long from the
new substation to an existing substation;
and (7) a new access road 60 feet in
length. The estimated annual generation
of the proposed project would be 93
gigawatt-hours.
Applicant Contact: Daniel Lissner,
Free Flow Power Corporation, 239
Causeway Street, Suite 300, Boston, MA
02114; phone: (978) 252–7111.
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 79, Number 65 (Friday, April 4, 2014)]
[Notices]
[Page 18907]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07493]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14575-000]
Archon Energy 1, Inc.; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On January 6, 2014, Archon Energy 1, Inc. filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Black Butte Afterbay
Hydropower Project (Black Butte Project or project) to be located on
Stony Creek, near the city of Orland, Glenn County, California. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The project would be located at the U.S. Army Corps of
Engineering's Black Butte dam and would utilize existing infrastructure
and afterbay of the dam. The proposed project would consist of the
following: (1) A bypass intake in the afterbay of Black Butte
reservoir; (2) two 2,800-foot-long pressurized, reinforced concrete
pipes creating approximately 20 feet of head; (3) a powerhouse,
containing two low-head, 2.5-megawatt Kaplan turbine-generators; and
(4) an undefined interconnection point to the grid within several
hundred feet of the proposed powerhouse. The estimated annual
generation of the Black Butte Project would be 22,000 megawatt-hours.
Applicant Contact: Mr. Paul Grist, President, Archon Energy 1,
Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602; phone:
(415) 377-2460.
FERC Contact: Adam Beeco; phone: (202) 502-8655.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14575-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14575) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07493 Filed 4-3-14; 8:45 am]