Borough of Lehighton, Pennsylvania; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 18542-18543 [2014-07308]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
18542
Federal Register / Vol. 79, No. 63 / Wednesday, April 2, 2014 / Notices
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR. 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed in
conjunction with the Merced Falls
Hydroelectric Project application (P–
2467–020) and according to the
following revised Hydro Licensing
Schedule. Revisions to the schedule
may be made as appropriate.
VerDate Mar<15>2010
17:01 Apr 01, 2014
Jkt 232001
Milestone
Target date
Filing of recommendations,
preliminary terms and
conditions, and preliminary fishway prescriptions.
Commission issues Draft
EA or EIS.
Comments on Draft EA or
EIS.
Modified Terms and Conditions.
Commission Issues Final
EA or EIS.
May, 2014.
November,
2014.
January, 2015.
March, 2015.
June, 2015.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: March 24, 2014.
Kimberly D. Bose,
Secretary .
[FR Doc. 2014–07305 Filed 4–1–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12455–011]
Borough of Lehighton, Pennsylvania;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Types of Proceeding: Surrender of
License.
b. Project No.: 12455–011.
c. Date Filed: March 4, 2014.
d. Licensee: Borough of Lehighton,
Pennsylvania.
e. Name of Project: Beltzville
Hydroelectric Project.
f. Location: The unconstructed project
was to be connected to the U.S. Army
Corps of Engineers Beltzville dam
which is located on Pohopoco Creek
about 5 miles upstream of its confluence
with the Lehigh River, and
approximately 4 miles northeast of the
Borough of Lehighton in Carbon County,
Pennsylvania.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Nicole Beckett,
Manager, Borough of Lehighton,
Borough Hall, 1 Constitutional Avenue,
Lehighton, PA 18235.
i. FERC Contact: Ms. Krista Sakallaris,
(202) 502–6302, Krista.Sakallaris@
ferc.gov.
j. Deadline for filing comments and
protests is 30 days from the issuance of
this notice by the Commission. Please
file your submittal electronically via the
Internet (eFiling) in lieu of paper. Please
refer to the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp and
filing instructions in the Commission’s
Regulations at 18 CFR section
385.2001(a)(1)(iii). To assist you with
eFilings you should refer to the
submission guidelines document at
https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition,
certain filing requirements have
statutory or regulatory formatting and
other instructions. You should refer to
a list of these ‘‘qualified documents’’ at
https://www.ferc.gov/docs-filing/efiling/
filing.pdf. You must include your name
and contact information at the end of
your comments. Please include the
project number (P–12455–011) on any
documents or motions filed. The
Commission strongly encourages
electronic filings; otherwise, you should
submit an original and seven copies of
any submittal to the following address:
The Secretary, Federal Energy
Regulatory Commission, Mail Code:
DHAC, PJ–12, 888 First Street NE.,
Washington, DC 20426.
k. Description of Proceeding: On
March 4, 2014, the Borough of
Lehighton, Pennsylvania filed a letter
stating that the Lehighton Borough
Council decided to no longer pursue the
Beltzville hydroelectric project. The
licensee has not started construction
and no ground disturbance has occurred
at the project. As such, the surrender of
the licensee’s license is an
administrative action.
l. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–12455–011)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
E:\FR\FM\02APN1.SGM
02APN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 63 / Wednesday, April 2, 2014 / Notices
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
VerDate Mar<15>2010
17:01 Apr 01, 2014
Jkt 232001
comments, it will be presumed to have
no comments.
Dated: March 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07308 Filed 4–1–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2467–020]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: 2467–020.
c. Date filed: February 8, 2012.
d. Applicant: Pacific Gas and Electric
Company (PG&E).
e. Name of Project: Merced Falls
Hydroelectric Project.
f. Location: The existing project is
located on the Merced River on the
border of Merced and Mariposa
counties, California, immediately
downstream of the Merced River
Hydroelectric Project (FERC No. 2179),
operated by the Merced Irrigation
District (Merced ID). The project would
occupy 1.62 acres of Federal land
managed by the Bureau of Land
Management.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825.
h. Applicant Contact: Pacific Gas and
Electric Company, Power Generation,
P.O. Box 770000, MC N11C, San
Francisco, CA 94177–0001; Telephone
(415) 973–7000.
i. FERC Contact: Matt Buhyoff, (202)
502–6824 or matt.buhyoff@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
18543
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2467–020.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The existing Merced Falls
Hydroelectric Project consists of: (1) A
concrete gravity dam with a structural
height of 34 feet, and a crest length of
575 feet; (2) three radial gates, each 20
feet in length and 13.5 feet high; (3) a
one-mile long project impoundment has
approximately 900 acre-feet of storage
capacity, a useable storage capacity of
approximately 579 acre-feet, a total
surface area of approximately 65 acres;
and a normal impoundment elevation of
344 feet msl; (4) a powerhouse housing
a 3.4-megawatt (MW) turbine/generator
unit and a vertical Kaplan-type four
blade turbine; (5) a 1,000-feet long
earthen levee with a crest width of eight
feet; (6) an adjacent intake structure
with a debris rack, and; (7) a nonoperable fish ladder.
The Merced Falls Project is operated
in a run-of-river mode dependent on
water outflow from Merced ID’s
upstream Merced River Project. Inflow
to the project passes through the
impoundment, which is kept at a
constant water elevation and then either
through the powerhouse or through the
dam’s radial gates. Flows of up to
approximately 1,750 cubic feet per
second (cfs) are diverted through the
powerhouse, and then discharged to the
Merced River via the tailrace. When
inflows exceed 2,200 cfs, the project
spills water. During flood events with
E:\FR\FM\02APN1.SGM
02APN1
Agencies
[Federal Register Volume 79, Number 63 (Wednesday, April 2, 2014)]
[Notices]
[Pages 18542-18543]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07308]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12455-011]
Borough of Lehighton, Pennsylvania; Notice of Application
Accepted for Filing, Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Proceeding: Surrender of License.
b. Project No.: 12455-011.
c. Date Filed: March 4, 2014.
d. Licensee: Borough of Lehighton, Pennsylvania.
e. Name of Project: Beltzville Hydroelectric Project.
f. Location: The unconstructed project was to be connected to the
U.S. Army Corps of Engineers Beltzville dam which is located on
Pohopoco Creek about 5 miles upstream of its confluence with the Lehigh
River, and approximately 4 miles northeast of the Borough of Lehighton
in Carbon County, Pennsylvania.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Nicole Beckett, Manager, Borough of Lehighton,
Borough Hall, 1 Constitutional Avenue, Lehighton, PA 18235.
i. FERC Contact: Ms. Krista Sakallaris, (202) 502-6302,
Krista.Sakallaris@ferc.gov.
j. Deadline for filing comments and protests is 30 days from the
issuance of this notice by the Commission. Please file your submittal
electronically via the Internet (eFiling) in lieu of paper. Please
refer to the instructions on the Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp and filing instructions in the
Commission's Regulations at 18 CFR section 385.2001(a)(1)(iii). To
assist you with eFilings you should refer to the submission guidelines
document at https://www.ferc.gov/help/submission-guide/user-guide.pdf.
In addition, certain filing requirements have statutory or regulatory
formatting and other instructions. You should refer to a list of these
``qualified documents'' at https://www.ferc.gov/docs-filing/efiling/filing.pdf. You must include your name and contact information at the
end of your comments. Please include the project number (P-12455-011)
on any documents or motions filed. The Commission strongly encourages
electronic filings; otherwise, you should submit an original and seven
copies of any submittal to the following address: The Secretary,
Federal Energy Regulatory Commission, Mail Code: DHAC, PJ-12, 888 First
Street NE., Washington, DC 20426.
k. Description of Proceeding: On March 4, 2014, the Borough of
Lehighton, Pennsylvania filed a letter stating that the Lehighton
Borough Council decided to no longer pursue the Beltzville
hydroelectric project. The licensee has not started construction and no
ground disturbance has occurred at the project. As such, the surrender
of the licensee's license is an administrative action.
l. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-12455-011) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-
[[Page 18543]]
3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: March 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07308 Filed 4-1-14; 8:45 am]
BILLING CODE 6717-01-P