Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 18544 [2014-07307]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
18544
Federal Register / Vol. 79, No. 63 / Wednesday, April 2, 2014 / Notices
flows greater than 12,250 cfs, the needle
beams can be dropped, allowing the
575-feet concrete section of the dam to
act as a spillway. Power is transmitted
via underground cable to a non-project
switchyard located adjacent to the
powerhouse.
The project has a dependable capacity
of 1.7 MW and an annual average
generation of approximately 13.5–GWh
(gigawatt-hours). PG&E is not proposing
any new or upgraded facilities or
structural changes to the project. PG&E
does propose to modify the project
boundary by removing approximately
4.8 acres of project lands, which PG&E
indicates are not needed for project
purposes.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
VerDate Mar<15>2010
18:37 Apr 01, 2014
Jkt 232001
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
o. Procedural Schedule:
The application will be processed in
conjunction with the Merced River
Hydroelectric Project application (P–
2179–042) and according to the
following revised Hydro Licensing
Schedule. Revisions to the schedule
may be made as appropriate.
Milestone
Target date
Filing of recommendations,
preliminary terms and
conditions, and preliminary fishway prescriptions.
Commission issues Draft
EA or EIS.
Comments on Draft EA or
EIS.
Modified Terms and Conditions.
Commission Issues Final
EA or EIS.
May, 2014.
November,
2014.
January, 2015.
March, 2015.
June, 2015.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: March 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07306 Filed 4–1–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[EG14–16–000, EG14–17–000, et al.]
Notice of Effectiveness of Exempt
Wholesale Generator or Foreign Utility
Company Status
Fortistar North Tonawanda
Inc.
RE Clearwater LLC ................
RE Columbia Two LLC .........
Border Winds Energy, LLC ...
Pleasant Valley Wind, LLC ..
SG2 Imperial Valley LLC ......
Macho Springs Solar, LLC ....
Des Moulins Wind Power
L.P.
Tropical BioEnergia S.A. ......
EG14–16–
000
EG14–17–
000
EG14–18–
000
EG14–19–
000
EG14–20–
000
EG14–21–
000
EG14–22–
000
FC14–11–
000
FC14–12–
000
Take notice that during the month of
February 2014, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Dated: March 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–07307 Filed 4–1–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–107–000]
National Fuel Gas Supply Corporation;
Notice of Request Under Blanket
Authorization
Take notice that on March 14, 2014,
National Fuel Gas Supply Corporation
(National Fuel), 6363 Main Street,
Williamsville, New York 14221, filed in
Docket No. CP14–107–000, a prior
notice request pursuant to sections
157.205, 157.208, 157.210 and 157.216
of the Commission’s regulations under
the Natural Gas Act (NGA), and
National Fuel’s blanket certificate
authorized in Docket No. CP83–4–000.
National Fuel seeks authorization to
construct approximately 4.72 miles of
16-inch and 20-inch diameter pipelines,
offset approximately 25-feet from its
existing Line KNY and KM3 pipelines,
in Erie and Cattaraugus Counties, New
York. National Fuel proposes to
E:\FR\FM\02APN1.SGM
02APN1
Agencies
[Federal Register Volume 79, Number 63 (Wednesday, April 2, 2014)]
[Notices]
[Page 18544]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-07307]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[EG14-16-000, EG14-17-000, et al.]
Notice of Effectiveness of Exempt Wholesale Generator or Foreign
Utility Company Status
Fortistar North Tonawanda Inc............ EG14-16-000
RE Clearwater LLC........................ EG14-17-000
RE Columbia Two LLC...................... EG14-18-000
Border Winds Energy, LLC................. EG14-19-000
Pleasant Valley Wind, LLC................ EG14-20-000
SG2 Imperial Valley LLC.................. EG14-21-000
Macho Springs Solar, LLC................. EG14-22-000
Des Moulins Wind Power L.P. FC14-11-000
Tropical BioEnergia S.A.................. FC14-12-000
Take notice that during the month of February 2014, the status of
the above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a).
Dated: March 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-07307 Filed 4-1-14; 8:45 am]
BILLING CODE 6717-01-P