minimum flow turbines would increase
the capacity of the project by 3.89 MW.
The project is located on the Oak Grove
Fork of the Clackamas River and the
mainstem of the Clackamas River in
Clackamas County, Oregon. The project
occupies federal lands within the Mt.
Hood National Forest, under the
jurisdiction of the U.S. Forest Service,
and a reservation of the U.S. Department
of Interior’s Bureau of Land
Management.
An environmental assessment (EA)
has been prepared as part of staff’s
review of the proposal. In the
application the licensee proposes to
construct, operate and maintain: (1) A
powerhouse at the base of Timothy Lake
Dam housing two 0.95–MW turbines, (2)
a powerhouse at Crack-in-the-Ground
located downstream of Lake Harriet
housing a 1 MW turbine, (3) a
powerhouse housing a 135–kW turbine
utilizing return flows from the juvenile
downstream migrant collection systems
and the North Fork fishway adult fish
trap, and (4) a turbine and an 850–kW
turbine and induction generator
utilizing North Fork fishway attraction
flows. The EA contains Commission
staff’s analysis of the probable
environmental impacts of the proposed
action and concludes that approval of
the proposal would not constitute a
major federal action significantly
affecting the quality of the human
environment.
The EA is available for review and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street NE., Room 2A, Washington,
DC 20426. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the ‘‘elibrary’’
link. Enter the docket number (P–2195)
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY,
(202) 502–865.
Dated: March 20, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–06877 Filed 3–27–14; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
[Docket No. CP14–114–000]
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 18, 2014.
Emera CNG, LLC; Notice of Petition for
Declaratory Order
Dated: March 24, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM12–18–000]
Revisions to Page 700 of FERC Form
No. 6; Notice of Revisions to Form No.
6 Filing Software
The Commission released an update
to the electronic filing software for the
FERC Form No. 6 on March 14, 2014.
The update incorporates the changes to
page 700 approved in Order No. 783.1
Pipelines must use the updated version
of the Form No. 6 software when filing
their annual report for reporting year
2013 and beyond. The annual Form No.
6 filings for 2013 are due on April 18,
2014.
Dated: March 21, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–06883 Filed 3–27–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Take notice that on March 19, 2014,
Emera CNG, LLC (Emera) pursuant to
section 207(a)(2) of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.207 (2013) filed a Petition for
Declaratory Order requesting the
Commission issue an order stating that
Emera proposed construction of a new
compressed natural gas (CNG)
compression and loading facility and
planned export of CNG via truck and
trailer and ocean-going carrier are not
subject to the Commission jurisdiction
under the Natural Gas Act, 15 USC 717,
et seq.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
1 Revisions to Page 700 of FERC Form No. 6, 77
FR 59,343 (Sept. 9, 2012), FERC Stats. & Regs.
¶ 32,692 (2012), Final Rule, Order No. 783, 144
FERC ¶ 61,049 (2013).
VerDate Mar<15>2010
18:57 Mar 27, 2014
Jkt 232001
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
[FR Doc. 2014–06985 Filed 3–27–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14569–000]
KC Small Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On December 5, 2013, KC Small
Hydro, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of
hydropower at the existing Scoby dam
located on Cattaraugus Creek in Erie
County, New York. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
E:\FR\FM\28MRN1.SGM
28MRN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 60 / Friday, March 28, 2014 / Notices
owned by others without the owners’
express permission.
The proposed Scoby Dam
Hydropower Project would consist of
the following: (1) An existing 338-footlong and 40-foot-high ogee-shaped
concrete gravity dam with a 183-footlong spillway; (2) an existing
impoundment having a surface area of
22 acres and a storage capacity of 52
acre-feet at an elevation of 1,080 feet
mean sea level (msl); (3) two new
Archimedes screw turbine-generator
units with an installed capacity of 250
kilowatts each; (4) a new 480-volt,
approximately 1-mile-long transmission
line extending from the site to an
existing three-phase line; and (5)
appurtenant facilities. The proposed
project would have an annual
generation of 1.5 gigawatt-hours.
Applicant Contact: Kelly Sackheim,
KC Small Hydro, LLC, 5096 Cocoa Palm
Way, Fair Oaks, CA 95628; phone: (301)
401–5978.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14569–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14569) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
VerDate Mar<15>2010
18:57 Mar 27, 2014
Jkt 232001
Dated: March 20, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–06879 Filed 3–27–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Privacy Act of 1974: Notice of New or
Altered Systems of Records
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of new or altered systems
of records.
AGENCY:
The Federal Energy
Regulatory Commission (the
Commission), under the requirements of
the Privacy Act of 1974, 5 U.S.C. 552a,
is publishing a description of new or
altered systems of records.
ADDRESSES: Comments should be
directed to the following address: Office
of the General Counsel, General and
Administrative Law Division, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
DATES: The proposed new or revised
systems will become effective April 28,
2014 unless further notice is given. The
Commission will publish a new notice
if the effective date is delayed to review
comments or if changes are made based
on comments received. To be assured of
consideration, comments should be
received on or before April 17, 2014.
FOR FURTHER INFORMATION CONTACT:
Wilbur Miller, Office of the General
Counsel, General and Administrative
Law Division, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426, (202) 502–
6030.
SUPPLEMENTARY INFORMATION:
SUMMARY:
17529
location; categories of individuals on
whom the records are maintained;
categories of records in the system;
authority for maintenance of the system;
each routine use; the policies and
practices governing storage,
retrievability, access controls, retention
and disposal; the title and business
address of the agency official
responsible for the system of records;
procedures for notification, access and
contesting the records of each system;
and the sources for the records in the
system. 5 U.S.C. 552(a)(4).
B. New or Altered System of Records
FERC–53 Information Technology
System Log Records
FERC–58 Critical Energy Infrastructure
Information (CEII) Records
FERC–59 Enforcement Investigation
Records
FERC–60 Hotline Records
FERC–61 Requests for Commission
Publications and Information
FERC–62 Public Information Requests
FERC–63 Company Registration
Records
FERC–64 Individual Registration
Records
FERC–53
SYSTEM NAME:
Information Technology System Log
Records.
SECURITY CLASSIFICATION:
Unclassified.
SYSTEM LOCATION:
Federal Energy Regulatory
Commission, Office of the Chief
Information Officer, Computer Data
Center, 888 First Street NE., Room 1F,
Washington, DC 20426.
CATEGORIES OF INDIVIDUALS COVERED BY THE
SYSTEM:
I. Report on the New or Altered
Systems
All individuals accessing the
Commission’s applications.
A. Background
CATEGORIES OF RECORDS IN THE SYSTEM:
The Privacy Act of 1974, 5 U.S.C.
552a, requires that each agency publish
a notice of the existence and character
of each new or altered ‘‘system of
records.’’ 5 U.S.C. 552a(a)(5). This
Notice identifies and describes the
Commission’s new or altered systems of
records. A copy of this report has been
distributed to the Speaker of the House
of Representatives and the President of
the Senate as the Act requires.
The Commission has adopted new or
altered systems of records under the
Privacy Act of 1974. The notice includes
for these systems of records the name;
Records relating to the use of the
Commission’s applications, including
Information Technology system log
files; Internet/Intranet, local area
network, and software, system, and
email usage.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
AUTHORITY FOR MAINTENANCE OF THE SYSTEM:
5 U.S.C. 302.
PURPOSE(S):
To oversee, maintain and troubleshoot
problems with information technology
resources managed by the Federal
Energy Regulatory Commission.
E:\FR\FM\28MRN1.SGM
28MRN1
Agencies
[Federal Register Volume 79, Number 60 (Friday, March 28, 2014)]
[Notices]
[Pages 17528-17529]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-06879]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14569-000]
KC Small Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On December 5, 2013, KC Small Hydro, LLC, filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of hydropower at the existing
Scoby dam located on Cattaraugus Creek in Erie County, New York. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
[[Page 17529]]
owned by others without the owners' express permission.
The proposed Scoby Dam Hydropower Project would consist of the
following: (1) An existing 338-foot-long and 40-foot-high ogee-shaped
concrete gravity dam with a 183-foot-long spillway; (2) an existing
impoundment having a surface area of 22 acres and a storage capacity of
52 acre-feet at an elevation of 1,080 feet mean sea level (msl); (3)
two new Archimedes screw turbine-generator units with an installed
capacity of 250 kilowatts each; (4) a new 480-volt, approximately 1-
mile-long transmission line extending from the site to an existing
three-phase line; and (5) appurtenant facilities. The proposed project
would have an annual generation of 1.5 gigawatt-hours.
Applicant Contact: Kelly Sackheim, KC Small Hydro, LLC, 5096 Cocoa
Palm Way, Fair Oaks, CA 95628; phone: (301) 401-5978.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14569-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14569) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 20, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-06879 Filed 3-27-14; 8:45 am]
BILLING CODE 6717-01-P