KEI (Maine) Power Management (III) LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 16789 [2014-06541]
Download as PDF
Federal Register / Vol. 79, No. 58 / Wednesday, March 26, 2014 / Notices
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: March 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–06540 Filed 3–25–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2808–016]
sroberts on DSK5SPTVN1PROD with NOTICES
KEI (Maine) Power Management (III)
LLC; Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2808–016.
c. Date Filed: January 31, 2014.
d. Submitted By: KEI (Maine) Power
Management (III) LLC.
e. Name of Project: Lower Barker
Hydroelectric Project.
f. Location: On the Little
Androscoggin River, in Androscoggin
County, Maine. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Lewis
Loon, KEI (Maine) Power Management
(III) LLC, 37 Alfred Plourde Parkway
Suite 2, Lewiston, ME 04240.
i. FERC Contact: Ryan Hansen at (202)
502–8074; or email at ryan.hansen@
ferc.gov.
j. KEI (Maine) Power Management (III)
LLC (KEI Maine) filed its request to use
VerDate Mar<15>2010
17:43 Mar 25, 2014
Jkt 232001
the Traditional Licensing Process on
January 31, 2014. KEI Maine provided
public notice of its request on February
4 and February 11, 2014. In a letter
dated March 19, 2014, the Director of
the Division of Hydropower Licensing
approved KEI Maine’s request to use the
Traditional Licensing Process.
k. With this notice, we are designating
KEI Maine as the Commission’s nonfederal representative for carrying out
informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
l. KEI Maine filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
n. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 2808.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by February 1, 2017.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–06541 Filed 3–25–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
16789
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD14–8–000]
Winter 2013–2014 Operations and
Market Performance in Regional
Transmission Organizations and
Independent System Operators;
Supplemental Notice of Technical
Conference
As announced in the Notice issued on
February 21, 2014,1 the Federal Energy
Regulatory Commission (Commission)
will hold a Commissioner-led technical
conference on Tuesday, April 1, 2014,
from 9 a.m. to approximately 5 p.m. to
discuss the impacts of recent cold
weather events on the Regional
Transmission Organizations/
Independent System Operators (RTOs/
ISOs), and discuss actions taken to
respond during those occurrences. The
conference will be held at the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
This conference is free of charge and
open to the public. Commission
members will participate in the
conference. The agenda and list of
participants for this conference are
attached.
Following the conference, the
Commission will take written public
comments until May 15, 2014.
If you have not already done so, those
who plan to attend the technical
conference are strongly encouraged to
complete the registration form located
at: https://www.ferc.gov/whats-new/
registration/04-01-14-form.asp. There is
no deadline to register to attend the
conference.
The technical conference will be
transcribed. Transcripts of the technical
conference will be immediately
available for a fee from Ace-Federal
Reporters, Inc. (202–347–3700 or 1–
800–336–6646). Additionally, there will
be a free webcast of the conference. The
webcast will allow persons to listen to
the technical conference but not
participate. Anyone with Internet access
who wants to listen to the conference
can do so by navigating to the Calendar
of Events at www.ferc.gov and locating
the technical conference in the
Calendar. The technical conference will
contain a link to its webcast. The
Capitol Connection provides technical
support for the webcast and offers the
1 Winter 2013–2014 Operations and Market
Performance in Regional Transmission
Organizations and Independent System Operators;
Supplemental Notice of Technical Conference
(https://www.ferc.gov/CalendarFiles/
20140221164557-AD14-8-000TC.pdf).
E:\FR\FM\26MRN1.SGM
26MRN1
Agencies
[Federal Register Volume 79, Number 58 (Wednesday, March 26, 2014)]
[Notices]
[Page 16789]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-06541]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2808-016]
KEI (Maine) Power Management (III) LLC; Notice of Intent To File
License Application, Filing of Pre-Application Document, and Approving
Use of the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 2808-016.
c. Date Filed: January 31, 2014.
d. Submitted By: KEI (Maine) Power Management (III) LLC.
e. Name of Project: Lower Barker Hydroelectric Project.
f. Location: On the Little Androscoggin River, in Androscoggin
County, Maine. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Lewis Loon, KEI (Maine) Power
Management (III) LLC, 37 Alfred Plourde Parkway Suite 2, Lewiston, ME
04240.
i. FERC Contact: Ryan Hansen at (202) 502-8074; or email at
ryan.hansen@ferc.gov.
j. KEI (Maine) Power Management (III) LLC (KEI Maine) filed its
request to use the Traditional Licensing Process on January 31, 2014.
KEI Maine provided public notice of its request on February 4 and
February 11, 2014. In a letter dated March 19, 2014, the Director of
the Division of Hydropower Licensing approved KEI Maine's request to
use the Traditional Licensing Process.
k. With this notice, we are designating KEI Maine as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
l. KEI Maine filed a Pre-Application Document (PAD; including a
proposed process plan and schedule) with the Commission, pursuant to 18
CFR 5.6 of the Commission's regulations.
m. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
n. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 2808. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by February 1,
2017.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: March 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-06541 Filed 3-25-14; 8:45 am]
BILLING CODE 6717-01-P