Clean Air Act Operating Permit Program; Petitions for Objection To State Operating Permits for Consolidated Environmental Management, Inc.-Nucor Steel Louisiana, 15740-15741 [2014-06224]

Download as PDF 15740 Federal Register / Vol. 79, No. 55 / Friday, March 21, 2014 / Notices inspection, and removal; (d) the number and locations of livestock found with ruptured or punctured collars and the apparent cause of the damage; (e) the number, dates, and approximate location of all collars lost; and (f) the species, locations, and dates of all suspected poisonings of humans, domestic animals or non-target wild animals resulting from collar use. Respondents/affected entities: Entities potentially affected by this ICR are pesticide and other agricultural manufacturers (NAICS 325320), e.g., pesticide registrants whose products include 1080 collars; and government establishments primarily engaged in administration of environmental quality programs (NAICS 9241) e.g., states implementing a 1080 collar monitoring program. Respondent’s obligation to respond: Mandatory. Estimated number of respondents: 48 (total). Frequency of response: Annual. Total estimated burden: 1,944 hours (per year). Burden is defined at 5 CFR 1320.03(b). Total estimated cost: $83,335 (per year), includes $0 annualized capital or operation and maintenance costs. Changes in the estimates: There is no change in the total estimated respondent burden compared with the ICR currently approved by OMB. FOR FURTHER INFORMATION CONTACT Richard T. Westlund, Acting Director, Collection Strategies Division. [FR Doc. 2014–06221 Filed 3–20–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9908–22–Region–6] Clean Air Act Operating Permit Program; Petitions for Objection To State Operating Permits for Consolidated Environmental Management, Inc.—Nucor Steel Louisiana Environmental Protection Agency (EPA). ACTION: Notice of final action. AGENCY: Pursuant to Clean Air Act (CAA) Section 505(b)(2) and 40 CFR 70.8(d), the EPA Administrator signed an Order, dated January 30, 2014, partially granting and partially denying three petitions asking EPA to object to operating permits (Permit Numbers 2560–00281–V0, 2560–00281–V1, and 3086–V0) issued by the Louisiana Department for Environmental Quality mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 17:18 Mar 20, 2014 Jkt 232001 (LDEQ) to Consolidated Environmental Management, Inc.—Nucor Steel Louisiana (Nucor) relating to a facility located near Convent, Saint James Parish, Louisiana. Pursuant to CAA Section 505(b)(2) and 40 CFR 70.8(d), the EPA Administrator also signed an Order, dated June 19, 2013, denying one issue (‘‘Specific Objection I’’) raised in two of those petitions. Together, EPA’s June 19, 2013 Order and January 30, 2014 Order respond to the three petitions submitted by Louisiana Environmental Action Network and Sierra Club (collectively, the Petitioners on June 25, 2010 (the 2010 Petition), May 3, 2011 (the 2011 Petition) and October 3, 2012 (the 2012 Petition), respectively. Sections 307(b) and 505(b)(2) of the Act provide that a petitioner may ask for judicial review of those portions of the Orders that deny objections raised in the petitions by the United States Court of Appeals for the appropriate circuit. Any petition for review shall be filed within 60 days from the date this notice appears in the Federal Register, pursuant to section 307(b) of the Act. ADDRESSES: You may review copies of the final Orders, the petitions, and other supporting information at EPA Region 6, 1445 Ross Avenue, Dallas, Texas 75202– 2733. EPA requests that if at all possible, you contact the individual listed in the section to view copies of the final Orders, petitions, and other supporting information. You may view the hard copies Monday through Friday, from 9:00 a.m. to 3:00 p.m., excluding Federal holidays. If you wish to examine these documents, you should make an appointment at least 24 hours before the visiting day. Additionally, the final June 19, 2013 Order and January 30, 2014 Orders are available electronically at: https://www.epa.gov/ Region7/air/title5/petitiondb/petitions/ nucor_steel_partialresponse2011.pdf and https://www.epa.gov/Region7/air/ title5/petitiondb/petitions/nucor_steel_ response2012.pdf, respectively. FOR FURTHER INFORMATION CONTACT: Dinesh Senghani at (214) 665–7221, email address: senghani.dinesh@epa.gov or the above EPA, Region 6 address. SUPPLEMENTARY INFORMATION: The CAA affords EPA a 45-day period to review, and object, as appropriate, to a title V operating permit proposed by a state permitting authority. Section 505(b)(2) of the CAA authorizes any person to petition the EPA Administrator, within 60 days after the expiration of this review period, to object to a title V operating permit if EPA has not done so. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Petitions must be based only on objections to the permit that were raised with reasonable specificity during the public comment period provided by the state, unless the petitioner demonstrates that it was impracticable to raise these issues during the comment period or unless the grounds for the issue arose after this period. EPA received three petitions from the Petitioners, dated June 25, 2010, May 3, 2011, and October 3, 2012, to object to operating permits issued to Consolidated Environmental Management, Inc.—Nucor Steel Louisiana relating to a facility located near Convent, Saint James Parish, Louisiana. The 2010 Petition requested that the Administrator object to a Nucor operating permit (Permit Number 2560– 00281–V0) on the basis that: (1) The permit fails to apply the appropriate maximum achievable control technology (MACT) standards; (2) the modeling submitted by Nucor to support its PSD analysis is flawed, and (3) the title V permit fails to incorporate conditions sufficient to assure compliance with PSD. The 2011 Petition requested that the Administrator object to two Nucor operating permits (Permit Numbers 2560–00281–V1 and 3086–V0) on the following bases: (1) LDEQ failed to aggregate PSD permitting for emissions from the entire facility (this issue is also known as ‘‘Specific Objection I’’ in this matter); (2) the modified pig iron permit fails to apply MACT standards for the topgas boilers; (3) LDEQ failed to include emission limits for particulate matter less than 2.5 microns; (4) the limit for natural gas consumption is not the best available control technology for greenhouse gas (GHG) emissions from the Direct Reduced Iron (DRI) process; and (5) the DRI permits must specify procedures estimating GHG emissions. The 2012 Petition requested that the Administrator object to the Nucor operating permits for the reasons expressed in the 2010 and 2011 Petitions, which were incorporated by reference and attached to the 2012 Petition. On June 19, 2013, the Administrator issued a partial Order denying Specific Objection I of the 2011 Petition and as re-raised in the 2012 Petition. On January 30, 2014, the Administrator issued an Order partially granting and partially denying the 2010, 2011, and 2012 Petitions, (except Specific Objection I). These Orders explain the reasons behind EPA’s conclusion to grant in part and deny in part these three petitions. Together, the June 19, 2013 Order and January 30, 2014 Order E:\FR\FM\21MRN1.SGM 21MRN1 Federal Register / Vol. 79, No. 55 / Friday, March 21, 2014 / Notices address all the objections originally raised in the 2010 Petition and the 2011 Petition, which were all re-raised in the 2012 Petition, as well as addressing the claims in the 2012 Petition. Dated: March 7, 2014. Ron Curry, Regional Administrator, Region 6. [FR Doc. 2014–06224 Filed 3–20–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9014–1] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/10/2014 Through 03/14/2014 Pursuant to 40 CFR 1506.9. mstockstill on DSK4VPTVN1PROD with NOTICES Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20140073, Draft EIS, FHWA, FL, Gulf Coast Parkway, From US 98 to US 231 and US 98 (Tyndall Parkway), Comment Period Ends: 05/05/2014, Contact: Benito Cunill 850–553–2224. EIS No. 20140074, Final EIS, USAF, 00, KC–46A Formal Training Unit (FTU) and First Main Operating Base (MOB 1) Beddown, Review Period Ends: 04/ 21/2014, Contact: Jean Reynolds 210– 395–8541. EIS No. 20140075, Final EIS, USFS, UT, Smiths Fork Vegetation Restoration Project, Review Period Ends: 04/21/ 2014, Contact: Pete Gomben 801–999– 2182. EIS No. 20140076, Final EIS, BLM, CO, Kremmling Proposed Resource Management Plan, Review Period Ends: 04/21/2014, Contact: Dennis Gale 970–724–3003. EIS No. 20140077, Draft Supplement, USFS, NM, Carson and Santa Fe National Forests Invasive Plant Control Project, Comment Period Ends: 05/05/2014, Contact: Julie Bain 505–438–5443. EIS No. 20140078, Draft EIS, BLM, ID, Proposed Modification to the Thomas Creek Mine Plan of Operations, Section 404 Clean Water Act Permit Application and Public Land VerDate Mar<15>2010 17:18 Mar 20, 2014 Jkt 232001 Disposal, Resource Management Plan, Comment Period Ends: 07/18/2014, Contact: Ken Gardner 208–879–6210. EIS No. 20140079, Draft EIS, NIH, MD, Proposed 2013 Master Plan National Institutes of Health Bethesda Campus, Comment Period Ends: 05/23/2014, Contact: Valerie Nottingham 301– 496–7775. EIS No. 20140080, Final EIS, USA, 00, Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort Bliss, Review Period Ends: 04/ 21/2014, Contact: John Kipp 915– 568–5162. EIS No. 20140081, Final EIS, USFS, MT, East Reservoir Project, Review Period Ends: 04/21/2014, Contact: Denise Beck 406–293–7773, ext. 7504. EIS No. 20140082, Draft EIS, BLM, NV, Long Canyon Mine Project, Comment Period Ends: 05/05/2014, Contact: Whitney Wirthlin 775–861–6568. EIS No. 20140083, Draft EIS, USACE, SC, Haile Gold Mine Project, Comment Period Ends: 05/09/2014, Contact: Richard Darden 843–329– 8043. EIS No. 20140084, Draft EIS, FERC, TX, Freeport LNG Liquefaction Project, Phase II Modification Project, Comment Period Ends: 05/05/2014, Contact: Eric Tomasi 202–502–8097. EIS No. 20140085, Draft EIS, USFS, WY, Medicine Bow—Routt National Forests and Thunder Basin National Grassland Invasive Plant Management, Comment Period Ends: 05/07/2014, Contact: Melissa Martin 307–745–2371. EIS No. 20140086, Draft EIS, USFS, ID, Upper North Fork HFRA Ecosystem Restoration Project, Comment Period Ends: 05/05/2014, Contact: Maggie Seaberg 208–756–2711. EIS No. 20140087, Final EIS, FHWA, TX, Trinity Parkway, From IH–35E/ SH–183 to US–17/SH–310, Review Period Ends: 05/05/2014, Contact: Salvador Deocampo 512–536–5950. EIS No. 20140088, Final EIS, DOE, CO, PROGRAMMATIC—Uranium Leasing Program, Review Period Ends: 04/21/ 2014, Contact: Ray Plieness 303–410– 4806. EIS No. 20140089, Draft Supplement, BOEM, 00, Gulf of Mexico Outer Continental Shelf (OCS) Oil and Gas Lease Sales: 2015–2017, Central Planning Area Lease Sales 235, 241, and 247, Comment Period Ends: 05/ 05/2014, Contact: Gary Goeke 504– 736–3233. EIS No. 20140090, Final Supplement, BOEM, 00, Gulf of Mexico Outer Continental Shelf (OCS) Oil and Gas Lease Sales: 201–2016, Western Planning Area Lease Sales 238, 246, and 248, Review Period Ends: 04/21/ PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 15741 2014, Contact: Gary Goeke 504–736– 3233. Amended Notices EIS No. 20140033, Second Draft Supplement, USACE, WA, Grays Harbor Navigation Improvement Project, Comment Period Ends: 04/08/ 2014, Contact: Josh Jackson 206–764– 6583. Revision to the FR Notice Published 01/31/2014; Extending Comment Period from 03/24/2014 to 04/08/2014. EIS No. 20140050, Draft EIS, NRC, OH, GENERIC—License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Station, Comment Period Ends: 04/21/2014, Contact: Elaine Keegan 301–415–8517. Revision to the FR Notice Published 02/21/2014; Extending Comment Period from 04/14/2014 to 04/21/2014. Dated: March 18, 2014. Dawn Roberts, Management Analyst, Office of Federal Activities. [FR Doc. 2014–06230 Filed 3–20–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9908–35–OAR] Meeting of the Mobile Sources Technical Review Subcommittee Environmental Protection Agency (EPA). ACTION: Notice of meeting. AGENCY: Pursuant to the Federal Advisory Committee Act, Public Law 92–463, notice is hereby given that the Mobile Sources Technical Review Subcommittee (MSTRS) will meet on May 7, 2014. The MSTRS is a subcommittee under the Clean Air Act Advisory Committee. This is an open meeting. The meeting will include discussion of current topics and presentations about activities being conducted by EPA’s Office of Transportation and Air Quality. The preliminary agenda for the meeting and any notices about change in venue will be posted on the Subcommittee’s Web site: https://www.epa.gov/air/caaac/ mobile_sources.html. MSTRS listserver subscribers will receive notification when the agenda is available on the Subcommittee Web site. To subscribe to the MSTRS listserver, send an email to Etchells.elizabeth@epa.gov. DATES: Wednesday, May 7, 2014 from 9:00 a.m. to 4:30 p.m. Registration begins at 8:30 a.m. SUMMARY: E:\FR\FM\21MRN1.SGM 21MRN1

Agencies

[Federal Register Volume 79, Number 55 (Friday, March 21, 2014)]
[Notices]
[Pages 15740-15741]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-06224]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9908-22-Region-6]


Clean Air Act Operating Permit Program; Petitions for Objection 
To State Operating Permits for Consolidated Environmental Management, 
Inc.--Nucor Steel Louisiana

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of final action.

-----------------------------------------------------------------------

SUMMARY: Pursuant to Clean Air Act (CAA) Section 505(b)(2) and 40 CFR 
70.8(d), the EPA Administrator signed an Order, dated January 30, 2014, 
partially granting and partially denying three petitions asking EPA to 
object to operating permits (Permit Numbers 2560-00281-V0, 2560-00281-
V1, and 3086-V0) issued by the Louisiana Department for Environmental 
Quality (LDEQ) to Consolidated Environmental Management, Inc.--Nucor 
Steel Louisiana (Nucor) relating to a facility located near Convent, 
Saint James Parish, Louisiana. Pursuant to CAA Section 505(b)(2) and 40 
CFR 70.8(d), the EPA Administrator also signed an Order, dated June 19, 
2013, denying one issue (``Specific Objection I'') raised in two of 
those petitions. Together, EPA's June 19, 2013 Order and January 30, 
2014 Order respond to the three petitions submitted by Louisiana 
Environmental Action Network and Sierra Club (collectively, the 
Petitioners on June 25, 2010 (the 2010 Petition), May 3, 2011 (the 2011 
Petition) and October 3, 2012 (the 2012 Petition), respectively. 
Sections 307(b) and 505(b)(2) of the Act provide that a petitioner may 
ask for judicial review of those portions of the Orders that deny 
objections raised in the petitions by the United States Court of 
Appeals for the appropriate circuit. Any petition for review shall be 
filed within 60 days from the date this notice appears in the Federal 
Register, pursuant to section 307(b) of the Act.

ADDRESSES: You may review copies of the final Orders, the petitions, 
and other supporting information at EPA Region 6, 1445 Ross Avenue, 
Dallas, Texas 75202-2733.
    EPA requests that if at all possible, you contact the individual 
listed in the FOR FURTHER INFORMATION CONTACT section to view copies of 
the final Orders, petitions, and other supporting information. You may 
view the hard copies Monday through Friday, from 9:00 a.m. to 3:00 
p.m., excluding Federal holidays. If you wish to examine these 
documents, you should make an appointment at least 24 hours before the 
visiting day. Additionally, the final June 19, 2013 Order and January 
30, 2014 Orders are available electronically at: https://www.epa.gov/Region7/air/title5/petitiondb/petitions/nucor_steel_partialresponse2011.pdf and https://www.epa.gov/Region7/air/title5/petitiondb/petitions/nucor_steel_response2012.pdf, respectively.

FOR FURTHER INFORMATION CONTACT: Dinesh Senghani at (214) 665-7221, 
email address: senghani.dinesh@epa.gov or the above EPA, Region 6 
address.

SUPPLEMENTARY INFORMATION: The CAA affords EPA a 45-day period to 
review, and object, as appropriate, to a title V operating permit 
proposed by a state permitting authority. Section 505(b)(2) of the CAA 
authorizes any person to petition the EPA Administrator, within 60 days 
after the expiration of this review period, to object to a title V 
operating permit if EPA has not done so. Petitions must be based only 
on objections to the permit that were raised with reasonable 
specificity during the public comment period provided by the state, 
unless the petitioner demonstrates that it was impracticable to raise 
these issues during the comment period or unless the grounds for the 
issue arose after this period.
    EPA received three petitions from the Petitioners, dated June 25, 
2010, May 3, 2011, and October 3, 2012, to object to operating permits 
issued to Consolidated Environmental Management, Inc.--Nucor Steel 
Louisiana relating to a facility located near Convent, Saint James 
Parish, Louisiana.
    The 2010 Petition requested that the Administrator object to a 
Nucor operating permit (Permit Number 2560-00281-V0) on the basis that: 
(1) The permit fails to apply the appropriate maximum achievable 
control technology (MACT) standards; (2) the modeling submitted by 
Nucor to support its PSD analysis is flawed, and (3) the title V permit 
fails to incorporate conditions sufficient to assure compliance with 
PSD. The 2011 Petition requested that the Administrator object to two 
Nucor operating permits (Permit Numbers 2560-00281-V1 and 3086-V0) on 
the following bases: (1) LDEQ failed to aggregate PSD permitting for 
emissions from the entire facility (this issue is also known as 
``Specific Objection I'' in this matter); (2) the modified pig iron 
permit fails to apply MACT standards for the topgas boilers; (3) LDEQ 
failed to include emission limits for particulate matter less than 2.5 
microns; (4) the limit for natural gas consumption is not the best 
available control technology for greenhouse gas (GHG) emissions from 
the Direct Reduced Iron (DRI) process; and (5) the DRI permits must 
specify procedures estimating GHG emissions. The 2012 Petition 
requested that the Administrator object to the Nucor operating permits 
for the reasons expressed in the 2010 and 2011 Petitions, which were 
incorporated by reference and attached to the 2012 Petition.
    On June 19, 2013, the Administrator issued a partial Order denying 
Specific Objection I of the 2011 Petition and as re-raised in the 2012 
Petition. On January 30, 2014, the Administrator issued an Order 
partially granting and partially denying the 2010, 2011, and 2012 
Petitions, (except Specific Objection I). These Orders explain the 
reasons behind EPA's conclusion to grant in part and deny in part these 
three petitions. Together, the June 19, 2013 Order and January 30, 2014 
Order

[[Page 15741]]

address all the objections originally raised in the 2010 Petition and 
the 2011 Petition, which were all re-raised in the 2012 Petition, as 
well as addressing the claims in the 2012 Petition.

    Dated: March 7, 2014.
Ron Curry,
Regional Administrator, Region 6.
[FR Doc. 2014-06224 Filed 3-20-14; 8:45 am]