Clean Air Act Operating Permit Program; Petitions for Objection To State Operating Permits for Consolidated Environmental Management, Inc.-Nucor Steel Louisiana, 15740-15741 [2014-06224]
Download as PDF
15740
Federal Register / Vol. 79, No. 55 / Friday, March 21, 2014 / Notices
inspection, and removal; (d) the number
and locations of livestock found with
ruptured or punctured collars and the
apparent cause of the damage; (e) the
number, dates, and approximate
location of all collars lost; and (f) the
species, locations, and dates of all
suspected poisonings of humans,
domestic animals or non-target wild
animals resulting from collar use.
Respondents/affected entities: Entities
potentially affected by this ICR are
pesticide and other agricultural
manufacturers (NAICS 325320), e.g.,
pesticide registrants whose products
include 1080 collars; and government
establishments primarily engaged in
administration of environmental quality
programs (NAICS 9241) e.g., states
implementing a 1080 collar monitoring
program.
Respondent’s obligation to respond:
Mandatory.
Estimated number of respondents: 48
(total).
Frequency of response: Annual.
Total estimated burden: 1,944 hours
(per year). Burden is defined at 5 CFR
1320.03(b).
Total estimated cost: $83,335 (per
year), includes $0 annualized capital or
operation and maintenance costs.
Changes in the estimates: There is no
change in the total estimated respondent
burden compared with the ICR currently
approved by OMB.
FOR FURTHER INFORMATION CONTACT
Richard T. Westlund,
Acting Director, Collection Strategies
Division.
[FR Doc. 2014–06221 Filed 3–20–14; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9908–22–Region–6]
Clean Air Act Operating Permit
Program; Petitions for Objection To
State Operating Permits for
Consolidated Environmental
Management, Inc.—Nucor Steel
Louisiana
Environmental Protection
Agency (EPA).
ACTION: Notice of final action.
AGENCY:
Pursuant to Clean Air Act
(CAA) Section 505(b)(2) and 40 CFR
70.8(d), the EPA Administrator signed
an Order, dated January 30, 2014,
partially granting and partially denying
three petitions asking EPA to object to
operating permits (Permit Numbers
2560–00281–V0, 2560–00281–V1, and
3086–V0) issued by the Louisiana
Department for Environmental Quality
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:18 Mar 20, 2014
Jkt 232001
(LDEQ) to Consolidated Environmental
Management, Inc.—Nucor Steel
Louisiana (Nucor) relating to a facility
located near Convent, Saint James
Parish, Louisiana. Pursuant to CAA
Section 505(b)(2) and 40 CFR 70.8(d),
the EPA Administrator also signed an
Order, dated June 19, 2013, denying one
issue (‘‘Specific Objection I’’) raised in
two of those petitions. Together, EPA’s
June 19, 2013 Order and January 30,
2014 Order respond to the three
petitions submitted by Louisiana
Environmental Action Network and
Sierra Club (collectively, the Petitioners
on June 25, 2010 (the 2010 Petition),
May 3, 2011 (the 2011 Petition) and
October 3, 2012 (the 2012 Petition),
respectively. Sections 307(b) and
505(b)(2) of the Act provide that a
petitioner may ask for judicial review of
those portions of the Orders that deny
objections raised in the petitions by the
United States Court of Appeals for the
appropriate circuit. Any petition for
review shall be filed within 60 days
from the date this notice appears in the
Federal Register, pursuant to section
307(b) of the Act.
ADDRESSES: You may review copies of
the final Orders, the petitions, and other
supporting information at EPA Region 6,
1445 Ross Avenue, Dallas, Texas 75202–
2733.
EPA requests that if at all possible,
you contact the individual listed in the
section to view copies of the final
Orders, petitions, and other supporting
information. You may view the hard
copies Monday through Friday, from
9:00 a.m. to 3:00 p.m., excluding
Federal holidays. If you wish to
examine these documents, you should
make an appointment at least 24 hours
before the visiting day. Additionally, the
final June 19, 2013 Order and January
30, 2014 Orders are available
electronically at: https://www.epa.gov/
Region7/air/title5/petitiondb/petitions/
nucor_steel_partialresponse2011.pdf
and https://www.epa.gov/Region7/air/
title5/petitiondb/petitions/nucor_steel_
response2012.pdf, respectively.
FOR FURTHER INFORMATION CONTACT:
Dinesh Senghani at (214) 665–7221,
email address: senghani.dinesh@epa.gov
or the above EPA, Region 6 address.
SUPPLEMENTARY INFORMATION: The CAA
affords EPA a 45-day period to review,
and object, as appropriate, to a title V
operating permit proposed by a state
permitting authority. Section 505(b)(2)
of the CAA authorizes any person to
petition the EPA Administrator, within
60 days after the expiration of this
review period, to object to a title V
operating permit if EPA has not done so.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Petitions must be based only on
objections to the permit that were raised
with reasonable specificity during the
public comment period provided by the
state, unless the petitioner demonstrates
that it was impracticable to raise these
issues during the comment period or
unless the grounds for the issue arose
after this period.
EPA received three petitions from the
Petitioners, dated June 25, 2010, May 3,
2011, and October 3, 2012, to object to
operating permits issued to
Consolidated Environmental
Management, Inc.—Nucor Steel
Louisiana relating to a facility located
near Convent, Saint James Parish,
Louisiana.
The 2010 Petition requested that the
Administrator object to a Nucor
operating permit (Permit Number 2560–
00281–V0) on the basis that: (1) The
permit fails to apply the appropriate
maximum achievable control
technology (MACT) standards; (2) the
modeling submitted by Nucor to
support its PSD analysis is flawed, and
(3) the title V permit fails to incorporate
conditions sufficient to assure
compliance with PSD. The 2011 Petition
requested that the Administrator object
to two Nucor operating permits (Permit
Numbers 2560–00281–V1 and 3086–V0)
on the following bases: (1) LDEQ failed
to aggregate PSD permitting for
emissions from the entire facility (this
issue is also known as ‘‘Specific
Objection I’’ in this matter); (2) the
modified pig iron permit fails to apply
MACT standards for the topgas boilers;
(3) LDEQ failed to include emission
limits for particulate matter less than 2.5
microns; (4) the limit for natural gas
consumption is not the best available
control technology for greenhouse gas
(GHG) emissions from the Direct
Reduced Iron (DRI) process; and (5) the
DRI permits must specify procedures
estimating GHG emissions. The 2012
Petition requested that the
Administrator object to the Nucor
operating permits for the reasons
expressed in the 2010 and 2011
Petitions, which were incorporated by
reference and attached to the 2012
Petition.
On June 19, 2013, the Administrator
issued a partial Order denying Specific
Objection I of the 2011 Petition and as
re-raised in the 2012 Petition. On
January 30, 2014, the Administrator
issued an Order partially granting and
partially denying the 2010, 2011, and
2012 Petitions, (except Specific
Objection I). These Orders explain the
reasons behind EPA’s conclusion to
grant in part and deny in part these
three petitions. Together, the June 19,
2013 Order and January 30, 2014 Order
E:\FR\FM\21MRN1.SGM
21MRN1
Federal Register / Vol. 79, No. 55 / Friday, March 21, 2014 / Notices
address all the objections originally
raised in the 2010 Petition and the 2011
Petition, which were all re-raised in the
2012 Petition, as well as addressing the
claims in the 2012 Petition.
Dated: March 7, 2014.
Ron Curry,
Regional Administrator, Region 6.
[FR Doc. 2014–06224 Filed 3–20–14; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9014–1]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/10/2014 Through 03/14/2014
Pursuant to 40 CFR 1506.9.
mstockstill on DSK4VPTVN1PROD with NOTICES
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20140073, Draft EIS, FHWA, FL,
Gulf Coast Parkway, From US 98 to
US 231 and US 98 (Tyndall Parkway),
Comment Period Ends: 05/05/2014,
Contact: Benito Cunill 850–553–2224.
EIS No. 20140074, Final EIS, USAF, 00,
KC–46A Formal Training Unit (FTU)
and First Main Operating Base (MOB
1) Beddown, Review Period Ends: 04/
21/2014, Contact: Jean Reynolds 210–
395–8541.
EIS No. 20140075, Final EIS, USFS, UT,
Smiths Fork Vegetation Restoration
Project, Review Period Ends: 04/21/
2014, Contact: Pete Gomben 801–999–
2182.
EIS No. 20140076, Final EIS, BLM, CO,
Kremmling Proposed Resource
Management Plan, Review Period
Ends: 04/21/2014, Contact: Dennis
Gale 970–724–3003.
EIS No. 20140077, Draft Supplement,
USFS, NM, Carson and Santa Fe
National Forests Invasive Plant
Control Project, Comment Period
Ends: 05/05/2014, Contact: Julie Bain
505–438–5443.
EIS No. 20140078, Draft EIS, BLM, ID,
Proposed Modification to the Thomas
Creek Mine Plan of Operations,
Section 404 Clean Water Act Permit
Application and Public Land
VerDate Mar<15>2010
17:18 Mar 20, 2014
Jkt 232001
Disposal, Resource Management Plan,
Comment Period Ends: 07/18/2014,
Contact: Ken Gardner 208–879–6210.
EIS No. 20140079, Draft EIS, NIH, MD,
Proposed 2013 Master Plan National
Institutes of Health Bethesda Campus,
Comment Period Ends: 05/23/2014,
Contact: Valerie Nottingham 301–
496–7775.
EIS No. 20140080, Final EIS, USA, 00,
Implementation of Energy, Water, and
Solid Waste Sustainability Initiatives
at Fort Bliss, Review Period Ends: 04/
21/2014, Contact: John Kipp 915–
568–5162.
EIS No. 20140081, Final EIS, USFS, MT,
East Reservoir Project, Review Period
Ends: 04/21/2014, Contact: Denise
Beck 406–293–7773, ext. 7504.
EIS No. 20140082, Draft EIS, BLM, NV,
Long Canyon Mine Project, Comment
Period Ends: 05/05/2014, Contact:
Whitney Wirthlin 775–861–6568.
EIS No. 20140083, Draft EIS, USACE,
SC, Haile Gold Mine Project,
Comment Period Ends: 05/09/2014,
Contact: Richard Darden 843–329–
8043.
EIS No. 20140084, Draft EIS, FERC, TX,
Freeport LNG Liquefaction Project,
Phase II Modification Project,
Comment Period Ends: 05/05/2014,
Contact: Eric Tomasi 202–502–8097.
EIS No. 20140085, Draft EIS, USFS, WY,
Medicine Bow—Routt National
Forests and Thunder Basin National
Grassland Invasive Plant
Management, Comment Period Ends:
05/07/2014, Contact: Melissa Martin
307–745–2371.
EIS No. 20140086, Draft EIS, USFS, ID,
Upper North Fork HFRA Ecosystem
Restoration Project, Comment Period
Ends: 05/05/2014, Contact: Maggie
Seaberg 208–756–2711.
EIS No. 20140087, Final EIS, FHWA,
TX, Trinity Parkway, From IH–35E/
SH–183 to US–17/SH–310, Review
Period Ends: 05/05/2014, Contact:
Salvador Deocampo 512–536–5950.
EIS No. 20140088, Final EIS, DOE, CO,
PROGRAMMATIC—Uranium Leasing
Program, Review Period Ends: 04/21/
2014, Contact: Ray Plieness 303–410–
4806.
EIS No. 20140089, Draft Supplement,
BOEM, 00, Gulf of Mexico Outer
Continental Shelf (OCS) Oil and Gas
Lease Sales: 2015–2017, Central
Planning Area Lease Sales 235, 241,
and 247, Comment Period Ends: 05/
05/2014, Contact: Gary Goeke 504–
736–3233.
EIS No. 20140090, Final Supplement,
BOEM, 00, Gulf of Mexico Outer
Continental Shelf (OCS) Oil and Gas
Lease Sales: 201–2016, Western
Planning Area Lease Sales 238, 246,
and 248, Review Period Ends: 04/21/
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
15741
2014, Contact: Gary Goeke 504–736–
3233.
Amended Notices
EIS No. 20140033, Second Draft
Supplement, USACE, WA, Grays
Harbor Navigation Improvement
Project, Comment Period Ends: 04/08/
2014, Contact: Josh Jackson 206–764–
6583.
Revision to the FR Notice Published
01/31/2014; Extending Comment Period
from 03/24/2014 to 04/08/2014.
EIS No. 20140050, Draft EIS, NRC, OH,
GENERIC—License Renewal of
Nuclear Plants Regarding Davis-Besse
Nuclear Station, Comment Period
Ends: 04/21/2014, Contact: Elaine
Keegan 301–415–8517.
Revision to the FR Notice Published
02/21/2014; Extending Comment Period
from 04/14/2014 to 04/21/2014.
Dated: March 18, 2014.
Dawn Roberts,
Management Analyst, Office of Federal
Activities.
[FR Doc. 2014–06230 Filed 3–20–14; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9908–35–OAR]
Meeting of the Mobile Sources
Technical Review Subcommittee
Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
AGENCY:
Pursuant to the Federal
Advisory Committee Act, Public Law
92–463, notice is hereby given that the
Mobile Sources Technical Review
Subcommittee (MSTRS) will meet on
May 7, 2014. The MSTRS is a
subcommittee under the Clean Air Act
Advisory Committee. This is an open
meeting. The meeting will include
discussion of current topics and
presentations about activities being
conducted by EPA’s Office of
Transportation and Air Quality. The
preliminary agenda for the meeting and
any notices about change in venue will
be posted on the Subcommittee’s Web
site: https://www.epa.gov/air/caaac/
mobile_sources.html. MSTRS listserver
subscribers will receive notification
when the agenda is available on the
Subcommittee Web site. To subscribe to
the MSTRS listserver, send an email to
Etchells.elizabeth@epa.gov.
DATES: Wednesday, May 7, 2014 from
9:00 a.m. to 4:30 p.m. Registration
begins at 8:30 a.m.
SUMMARY:
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 79, Number 55 (Friday, March 21, 2014)]
[Notices]
[Pages 15740-15741]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-06224]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-9908-22-Region-6]
Clean Air Act Operating Permit Program; Petitions for Objection
To State Operating Permits for Consolidated Environmental Management,
Inc.--Nucor Steel Louisiana
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice of final action.
-----------------------------------------------------------------------
SUMMARY: Pursuant to Clean Air Act (CAA) Section 505(b)(2) and 40 CFR
70.8(d), the EPA Administrator signed an Order, dated January 30, 2014,
partially granting and partially denying three petitions asking EPA to
object to operating permits (Permit Numbers 2560-00281-V0, 2560-00281-
V1, and 3086-V0) issued by the Louisiana Department for Environmental
Quality (LDEQ) to Consolidated Environmental Management, Inc.--Nucor
Steel Louisiana (Nucor) relating to a facility located near Convent,
Saint James Parish, Louisiana. Pursuant to CAA Section 505(b)(2) and 40
CFR 70.8(d), the EPA Administrator also signed an Order, dated June 19,
2013, denying one issue (``Specific Objection I'') raised in two of
those petitions. Together, EPA's June 19, 2013 Order and January 30,
2014 Order respond to the three petitions submitted by Louisiana
Environmental Action Network and Sierra Club (collectively, the
Petitioners on June 25, 2010 (the 2010 Petition), May 3, 2011 (the 2011
Petition) and October 3, 2012 (the 2012 Petition), respectively.
Sections 307(b) and 505(b)(2) of the Act provide that a petitioner may
ask for judicial review of those portions of the Orders that deny
objections raised in the petitions by the United States Court of
Appeals for the appropriate circuit. Any petition for review shall be
filed within 60 days from the date this notice appears in the Federal
Register, pursuant to section 307(b) of the Act.
ADDRESSES: You may review copies of the final Orders, the petitions,
and other supporting information at EPA Region 6, 1445 Ross Avenue,
Dallas, Texas 75202-2733.
EPA requests that if at all possible, you contact the individual
listed in the FOR FURTHER INFORMATION CONTACT section to view copies of
the final Orders, petitions, and other supporting information. You may
view the hard copies Monday through Friday, from 9:00 a.m. to 3:00
p.m., excluding Federal holidays. If you wish to examine these
documents, you should make an appointment at least 24 hours before the
visiting day. Additionally, the final June 19, 2013 Order and January
30, 2014 Orders are available electronically at: https://www.epa.gov/Region7/air/title5/petitiondb/petitions/nucor_steel_partialresponse2011.pdf and https://www.epa.gov/Region7/air/title5/petitiondb/petitions/nucor_steel_response2012.pdf, respectively.
FOR FURTHER INFORMATION CONTACT: Dinesh Senghani at (214) 665-7221,
email address: senghani.dinesh@epa.gov or the above EPA, Region 6
address.
SUPPLEMENTARY INFORMATION: The CAA affords EPA a 45-day period to
review, and object, as appropriate, to a title V operating permit
proposed by a state permitting authority. Section 505(b)(2) of the CAA
authorizes any person to petition the EPA Administrator, within 60 days
after the expiration of this review period, to object to a title V
operating permit if EPA has not done so. Petitions must be based only
on objections to the permit that were raised with reasonable
specificity during the public comment period provided by the state,
unless the petitioner demonstrates that it was impracticable to raise
these issues during the comment period or unless the grounds for the
issue arose after this period.
EPA received three petitions from the Petitioners, dated June 25,
2010, May 3, 2011, and October 3, 2012, to object to operating permits
issued to Consolidated Environmental Management, Inc.--Nucor Steel
Louisiana relating to a facility located near Convent, Saint James
Parish, Louisiana.
The 2010 Petition requested that the Administrator object to a
Nucor operating permit (Permit Number 2560-00281-V0) on the basis that:
(1) The permit fails to apply the appropriate maximum achievable
control technology (MACT) standards; (2) the modeling submitted by
Nucor to support its PSD analysis is flawed, and (3) the title V permit
fails to incorporate conditions sufficient to assure compliance with
PSD. The 2011 Petition requested that the Administrator object to two
Nucor operating permits (Permit Numbers 2560-00281-V1 and 3086-V0) on
the following bases: (1) LDEQ failed to aggregate PSD permitting for
emissions from the entire facility (this issue is also known as
``Specific Objection I'' in this matter); (2) the modified pig iron
permit fails to apply MACT standards for the topgas boilers; (3) LDEQ
failed to include emission limits for particulate matter less than 2.5
microns; (4) the limit for natural gas consumption is not the best
available control technology for greenhouse gas (GHG) emissions from
the Direct Reduced Iron (DRI) process; and (5) the DRI permits must
specify procedures estimating GHG emissions. The 2012 Petition
requested that the Administrator object to the Nucor operating permits
for the reasons expressed in the 2010 and 2011 Petitions, which were
incorporated by reference and attached to the 2012 Petition.
On June 19, 2013, the Administrator issued a partial Order denying
Specific Objection I of the 2011 Petition and as re-raised in the 2012
Petition. On January 30, 2014, the Administrator issued an Order
partially granting and partially denying the 2010, 2011, and 2012
Petitions, (except Specific Objection I). These Orders explain the
reasons behind EPA's conclusion to grant in part and deny in part these
three petitions. Together, the June 19, 2013 Order and January 30, 2014
Order
[[Page 15741]]
address all the objections originally raised in the 2010 Petition and
the 2011 Petition, which were all re-raised in the 2012 Petition, as
well as addressing the claims in the 2012 Petition.
Dated: March 7, 2014.
Ron Curry,
Regional Administrator, Region 6.
[FR Doc. 2014-06224 Filed 3-20-14; 8:45 am]
BILLING CODE 6560-50-P