H2 Refuel H-Prize Draft Guidelines Released for Public Comment, 15737 [2014-06193]
Download as PDF
Federal Register / Vol. 79, No. 55 / Friday, March 21, 2014 / Notices
the comments may be made available to
the PCAST members prior to this
meeting for their consideration.
Information regarding how to submit
comments and documents to PCAST is
available at https://whitehouse.gov/ostp/
pcast in the section entitled ‘‘Connect
with PCAST.’’
Please note that because PCAST
operates under the provisions of FACA,
all public comments and/or
presentations will be treated as public
documents and will be made available
for public inspection, including being
posted on the PCAST Web site.
Meeting Accommodations:
Individuals requiring special
accommodation to access this public
meeting should contact Dr. Ashley
Predith at least ten business days prior
to the meeting so that appropriate
arrangements can be made.
Issued in Washington, DC, on March 14,
2014.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2014–06197 Filed 3–20–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Office of Energy Efficiency and
Renewable Energy
H2 Refuel H-Prize Draft Guidelines
Released for Public Comment
Office of Energy Efficiency and
Renewable Energy, Department of
Energy (DOE).
ACTION: Notice of Public Comment
Period for the H2 Refuel H-Prize Draft
Guidelines.
AGENCY:
The Department of Energy
(DOE) announces in this notice the
release of the H2 Refuel H-Prize Draft
Guidelines for public comment,
pursuant to Section 654 of the Energy
Independence and Security Act of 2007,
Public Law 110–140 (December 19,
2007). Interested persons are
encouraged to learn about the H2 Refuel
H-Prize guidelines at: https://
www.hydrogen.energy.gov/hprize.html.
DATES: Comments on the draft H2 Refuel
H-Prize draft guidelines must be
received within 30 days of the Federal
Register Notice publication date.
ADDRESSES: U.S. Department of Energy,
Golden Field Office, 15013 Denver West
Parkway, Golden, CO 80401–3111, Attn:
Reginald Tyler.
To submit comments, interested
persons are encouraged to follow any of
the listed methods: Email: HPrize@
go.doe.gov. Include ‘‘H2 Refuel H-Prize’’
in the Subject line.
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:18 Mar 20, 2014
Jkt 232001
FOR FURTHER INFORMATION CONTACT:
Questions may be directed to Reginald
Tyler at 720–356–1805 or by email at
Reginald.tyler@go.doe.gov.
SUPPLEMENTARY INFORMATION: In 2007
the Energy Independence and Security
Act authorized the H-Prize to
competitively award prizes for advances
in hydrogen energy technologies in
order to accelerate and reward
breakthroughs in notable scientific and
engineering challenges, while engaging
a broad range of participants. The $1
million H2 Refuel H-Prize challenges
America’s engineers and entrepreneurs
to develop affordable systems for smallscale, non-commercial hydrogen
fueling, at homes or multi-use sites that
can supplement the current
development of hydrogen fueling station
infrastructure. Successful entries will
install and test systems that generate
hydrogen from resources available to
most homes, electricity and natural gas,
and dispense the hydrogen into
vehicles. Winners will demonstrate that
they can meet both the technical and
cost criteria as outlined in the final
guidelines.
Today’s notice announces the
availability of draft guidelines for
administration of the prize competition.
The DOE will consider any comments
received within 30 days of the Federal
Register Notice publication date.
Issued in Golden, CO, on March 12, 2014.
Christina Kouch,
Contracting Officer.
[FR Doc. 2014–06193 Filed 3–20–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2238–006;
ER10–2239–006; ER10–2237–005; ER12–
896–002.
Applicants: Indigo Generation LLC,
Larkspur Energy LLC, Wildflower
Energy LP, Mariposa Energy, LLC.
Description: Supplement to June 13,
2013 Triennial Market Power Analysis
for the Southwest Region of the DGC
Southwest Sellers.
Filed Date: 3/13/14.
Accession Number: 20140313–5087.
Comments Due: 5 p.m. ET 3/24/14.
Docket Numbers: ER14–603–001.
Applicants: Midcontinent
Independent System Operator, Inc.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
15737
Description: 2014–03–12_SA 1519
G132 Unexecuted Amended GIA
Deficiency Response to be effective 12/
13/2013.
Filed Date: 3/12/14.
Accession Number: 20140312–5335.
Comments Due: 5 p.m. ET 4/2/14.
Docket Numbers: ER14–616–001.
Applicants: New England Power Pool
Participants Committee, ISO New
England Inc.
Description: ORTP Compliance Filing
to be effective 2/11/2014.
Filed Date: 3/13/14.
Accession Number: 20140313–5068.
Comments Due: 5 p.m. ET 4/3/14.
Docket Numbers: ER14–801–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–03–13 Docket No.
ER14–801–000_GVTC Compliance
Filing to be effective 2/21/2014.
Filed Date: 3/13/14.
Accession Number: 20140313–5086.
Comments Due: 5 p.m. ET 4/3/14.
Docket Numbers: ER14–822–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Response to Deficiency
Letter dated 3/6/2014 in Docket No.
ER14–822 to be effective 3/15/2014.
Filed Date: 3/12/14.
Accession Number: 20140312–5316.
Comments Due: 5 p.m. ET 3/24/14.
Docket Numbers: ER14–864–001.
Applicants: New York Independent
System Operator, Inc.
Description: NYISO compliance re:
Proxy generator bus pricing rules to be
effective 4/8/2014.
Filed Date: 3/13/14.
Accession Number: 20140313–5073.
Comments Due: 5 p.m. ET 4/3/14.
Docket Numbers: ER14–1471–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–03–11_SA 2637
Border Winds-NSP E&P Agreement
(J290) to be effective 3/13/2014.
Filed Date: 3/12/14.
Accession Number: 20140312–5332.
Comments Due: 5 p.m. ET 4/2/14.
Docket Numbers: ER14–1474–000.
Applicants: WSPP Inc.
Description: List of Members Update
to be effective 3/3/2014.
Filed Date: 3/12/14.
Accession Number: 20140312–5299.
Comments Due: 5 p.m. ET 4/2/14.
Docket Numbers: ER14–1475–000.
Applicants: Invenergy Nelson LLC.
Description: Request of Invenergy
Nelson LLC for Limited Waiver of the
PJM Interconnection, L.L.C. Tariff, for
Shortened Comment Period and for
Expedited Action.
Filed Date: 3/12/14.
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 79, Number 55 (Friday, March 21, 2014)]
[Notices]
[Page 15737]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-06193]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Office of Energy Efficiency and Renewable Energy
H2 Refuel H-Prize Draft Guidelines Released for Public Comment
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy (DOE).
ACTION: Notice of Public Comment Period for the H2 Refuel H-Prize Draft
Guidelines.
-----------------------------------------------------------------------
SUMMARY: The Department of Energy (DOE) announces in this notice the
release of the H2 Refuel H-Prize Draft Guidelines for public comment,
pursuant to Section 654 of the Energy Independence and Security Act of
2007, Public Law 110-140 (December 19, 2007). Interested persons are
encouraged to learn about the H2 Refuel H-Prize guidelines at: https://www.hydrogen.energy.gov/hprize.html.
DATES: Comments on the draft H2 Refuel H-Prize draft guidelines must be
received within 30 days of the Federal Register Notice publication
date.
ADDRESSES: U.S. Department of Energy, Golden Field Office, 15013 Denver
West Parkway, Golden, CO 80401-3111, Attn: Reginald Tyler.
To submit comments, interested persons are encouraged to follow any
of the listed methods: Email: HPrize@go.doe.gov. Include ``H2 Refuel H-
Prize'' in the Subject line.
FOR FURTHER INFORMATION CONTACT: Questions may be directed to Reginald
Tyler at 720-356-1805 or by email at Reginald.tyler@go.doe.gov.
SUPPLEMENTARY INFORMATION: In 2007 the Energy Independence and Security
Act authorized the H-Prize to competitively award prizes for advances
in hydrogen energy technologies in order to accelerate and reward
breakthroughs in notable scientific and engineering challenges, while
engaging a broad range of participants. The $1 million H2 Refuel H-
Prize challenges America's engineers and entrepreneurs to develop
affordable systems for small-scale, non-commercial hydrogen fueling, at
homes or multi-use sites that can supplement the current development of
hydrogen fueling station infrastructure. Successful entries will
install and test systems that generate hydrogen from resources
available to most homes, electricity and natural gas, and dispense the
hydrogen into vehicles. Winners will demonstrate that they can meet
both the technical and cost criteria as outlined in the final
guidelines.
Today's notice announces the availability of draft guidelines for
administration of the prize competition.
The DOE will consider any comments received within 30 days of the
Federal Register Notice publication date.
Issued in Golden, CO, on March 12, 2014.
Christina Kouch,
Contracting Officer.
[FR Doc. 2014-06193 Filed 3-20-14; 8:45 am]
BILLING CODE 6450-01-P