Grand River Dam Authority; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, 15587-15588 [2014-06115]

Download as PDF Federal Register / Vol. 79, No. 54 / Thursday, March 20, 2014 / Notices Description: Tariff filing per 284.123(b)(2) + : Rate Petition to be effective 5/6/2014; TOFC: 1310. Filed Date: 3/7/14. Accession Number: 20140307–5143. Comments Due: 5 p.m. ET 3/28/14. 284.123(g) Protests Due: 5 p.m. ET 5/6/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR § 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated March 12, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 31, 2014. [FR Doc. 2014–06088 Filed 3–19–14; 8:45 am] Dated: March 13, 2014. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P [FR Doc. 2014–06117 Filed 3–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. EF14–4–000] [Project No. 2524–021] ehiers on DSK2VPTVN1PROD with NOTICES Western Area Power Administration; Notice of Filing Take notice that on February 27, 2014, the Western Area Power Administration submitted a tariff filing per 10 CFR 903.23: DSW_PDP_162–20140226 to be effective October 1, 2013, Rate Order No. WAPA–162, concerning extension of the Parker-Davis Project Firm Electric and Transmission Service Formula Rates. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or VerDate Mar<15>2010 14:48 Mar 19, 2014 Jkt 232001 Grand River Dam Authority; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2524–021. c. Date filed: November 27, 2013. d. Applicant: Grand River Dam Authority. e. Name of Project: Salina Pumped Storage Project. f. Location: The existing project is located on the Saline Creek arm of Lake Hudson in the Grand River basin in PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 15587 Mayes County, Oklahoma. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Dr. Darrell Townsend, P.O. Box 70, Langley, Oklahoma 74350–0070; (918) 256–0616; dtownsend@grda.com. i. FERC Contact: Stephen Bowler, (202) 502–6861, or stephen.bowler@ ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2524–021. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The existing Salina Pumped Storage Project consists of: (1) The 762-acre W.R. Holway Reservoir (the upper reservoir), with a normal pool elevation between 850 feet and 865 feet National Geodetic Vertical Datum; (2) three rim dikes around the upper reservoir; (3) an 1,800-foot-long concrete-lined canal; (4) a 336-foot-wide, 62-foot-high forebay structure; (5) a 2,300-foot-long, 185-foothigh earthen dam; (6) six 14-foot- E:\FR\FM\20MRN1.SGM 20MRN1 ehiers on DSK2VPTVN1PROD with NOTICES 15588 Federal Register / Vol. 79, No. 54 / Thursday, March 20, 2014 / Notices diameter penstocks, each between 630 and 680 feet long; (7) a powerhouse with six reversible pump-turbine units, each rated at 43.3 megawatt (MW), for a total installed capacity of 260 MW; (8) a substation; (9) an approximately 6mile-long, 161-kilovolt transmission line; and (10) appurtenant facilities. The project utilizes Lake Hudson (the lower reservoir), which is the reservoir for the Grand River Dam Authority’s Markham Ferry Project No. 2183, for pumped storage operations. m. A copy of the application is available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Copies are also available for inspection and reproduction at the public libraries in Vinita and Salina, Oklahoma, and at the Administrative Headquarters of the Grand River Dam Authority at 226 W. Dwain Willis Avenue, Vinita, Oklahoma. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the VerDate Mar<15>2010 14:48 Mar 19, 2014 Jkt 232001 application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues Draft EA. Comments on Draft EA ..... Modified Terms and Conditions. Commission Issues Final EA. May 2014. November 2014. December 2014. February 2015. May 2015. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. On December 18, 2013, Grand River Dam Authority filed with the Commission a copy of its request for water quality certification. The copy included a date stamp and signature from the Oklahoma Department of Water Quality indicating receipt of the request on December 11, 2013 by the certifying agency. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Dated: March 13, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–06115 Filed 3–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13753–002; 13762–002; 13771– 002; 13763–002; 13766–002; 13767–002] Notice of Applications Tendered for Filing With the Commission and Soliciting Additional Study Requests: FFP Missouri 16, LLC; FFP Missouri 15, LLC; Solia 8 Hydroelectric, LLC; FFP Missouri 13, LLC; Solia 5 Hydroelectric, LLC; Solia 4 Hydroelectric, LLC Take notice that the following hydroelectric applications have been filed with the Commission and are available for public inspection. a. Type of Applications: Original Major Licenses. b. Project Nos.: 13753–002; 13762– 002; 13771–002; 13763–002; 13766–002; 13767–002. c. Date Filed: February 27, 2014. d. Applicants: FFP Missouri 16, LLC; FFP Missouri 15, LLC; Solia 8 Hydroelectric, LLC; FFP Missouri 13, LLC; Solia 5 Hydroelectric, LLC; Solia 4 Hydroelectric, LLC. All applicants are subsidiaries of Free Flow Power Corporation. e. Names of Projects: Opekiska Lock and Dam Hydroelectric Project, 13753– 002; Morgantown Lock and Dam Hydroelectric Project, 13762–002; Point Marion Lock and Dam Hydroelectric Project, 13771–002; Grays Landing Lock and Dam Hydroelectric Project, 13763– 002; Maxwell Lock and Dam Hydroelectric Project, 13766–002; and Monongahela Lock and Dam Number Four Hydroelectric Project, 13767–002. These projects are collectively referred to as the ‘‘Monongahela River projects.’’ f. Locations: The proposed projects would be located at U.S. Army Corps of Engineers’ (Corps) dams on the Monongahela River in Monongalia County, West Virginia and Fayette, Greene, and Washington counties, Pennsylvania (see table below for specific locations). The projects would occupy 39.75 acres of federal land managed by the Corps. E:\FR\FM\20MRN1.SGM 20MRN1

Agencies

[Federal Register Volume 79, Number 54 (Thursday, March 20, 2014)]
[Notices]
[Pages 15587-15588]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-06115]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2524-021]


Grand River Dam Authority; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2524-021.
    c. Date filed: November 27, 2013.
    d. Applicant: Grand River Dam Authority.
    e. Name of Project: Salina Pumped Storage Project.
    f. Location: The existing project is located on the Saline Creek 
arm of Lake Hudson in the Grand River basin in Mayes County, Oklahoma. 
The project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Dr. Darrell Townsend, P.O. Box 70, Langley, 
Oklahoma 74350-0070; (918) 256-0616; dtownsend@grda.com.
    i. FERC Contact: Stephen Bowler, (202) 502-6861, or 
stephen.bowler@ferc.gov.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-2524-021.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The existing Salina Pumped Storage Project consists of: (1) The 
762-acre W.R. Holway Reservoir (the upper reservoir), with a normal 
pool elevation between 850 feet and 865 feet National Geodetic Vertical 
Datum; (2) three rim dikes around the upper reservoir; (3) an 1,800-
foot-long concrete-lined canal; (4) a 336-foot-wide, 62-foot-high 
forebay structure; (5) a 2,300-foot-long, 185-foot-high earthen dam; 
(6) six 14-foot-

[[Page 15588]]

diameter penstocks, each between 630 and 680 feet long; (7) a 
powerhouse with six reversible pump-turbine units, each rated at 43.3 
megawatt (MW), for a total installed capacity of 260 MW; (8) a 
substation; (9) an approximately 6-mile-long, 161-kilovolt transmission 
line; and (10) appurtenant facilities. The project utilizes Lake Hudson 
(the lower reservoir), which is the reservoir for the Grand River Dam 
Authority's Markham Ferry Project No. 2183, for pumped storage 
operations.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits in the 
docket number field, to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. Copies are also available for 
inspection and reproduction at the public libraries in Vinita and 
Salina, Oklahoma, and at the Administrative Headquarters of the Grand 
River Dam Authority at 226 W. Dwain Willis Avenue, Vinita, Oklahoma.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must: (1) Bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Procedural Schedule:
    The application will be processed according to the following 
preliminary Hydro Licensing Schedule. Revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary   May 2014.
 terms and conditions, and fishway
 prescriptions.
Commission issues Draft EA.............  November 2014.
Comments on Draft EA...................  December 2014.
Modified Terms and Conditions..........  February 2015.
Commission Issues Final EA.............  May 2015.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification. On 
December 18, 2013, Grand River Dam Authority filed with the Commission 
a copy of its request for water quality certification. The copy 
included a date stamp and signature from the Oklahoma Department of 
Water Quality indicating receipt of the request on December 11, 2013 by 
the certifying agency.

    Dated: March 13, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-06115 Filed 3-19-14; 8:45 am]
BILLING CODE 6717-01-P