Notice of Decision To Issue Clean Air Act PSD Permit for the Pio Pico Energy Center, 14505-14506 [2014-05740]
Download as PDF
Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices
electronic filing. Please file the
requested information using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–14345–001.
Dated: March 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05627 Filed 3–13–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RD14–6–000]
Reliability Standards for Physical
Security Measures; Notice of
Designation of Commission Staff as
Non-Decisional
sroberts on DSK5SPTVN1PROD with NOTICES
With respect to an order issued by the
Commission today in the abovecaptioned docket, pursuant to 18 CFR
385.2201(c)(3) (2013), the staff
identified below from the Office of
Electric Reliability are designated as
non-decisional in deliberations by the
Commission in this docket.
Accordingly, these persons will not
serve as advisors to the Commission or
otherwise be involved in the decisional
process in this proceeding. Likewise, as
non-decisional staff, pursuant to 18 CFR
385.2201 (2013), they are prohibited
from communicating with advisory staff
concerning any deliberations in this
docket.
The staff designated as non-decisional
are:
Edward Franks
Regis Binder
David O’Connor
Mary Agnes Nimis
Justin Kelly
Andres Lopez
Dated: March 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05628 Filed 3–13–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
19:18 Mar 13, 2014
Jkt 232001
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–R09–OAR–2011–0978; FRL–9908–07–
Region–9]
Notice of Decision To Issue Clean Air
Act PSD Permit for the Pio Pico Energy
Center
United States Environmental
Protection Agency (EPA) Region 9.
ACTION: Notice of final agency action.
AGENCY:
This notice announces that
EPA Region 9 issued a final permit
decision for a Clean Air Act Prevention
of Significant Deterioration (PSD)
permit to Pio Pico Energy Center, LLC
(PPLLC) for the construction of the Pio
Pico Energy Center (PPEC).
DATES: EPA Region 9 issued a final PSD
permit decision for the PPEC on
February 28, 2014. The PSD permit for
the PPEC will become effective on April
7, 2014. Pursuant to section 307(b)(1) of
the Clean Air Act, 42 U.S.C. 7607(b)(1),
judicial review of this final permit
decision, to the extent it is available,
may be sought by filing a petition for
review in the United States Court of
Appeals for the Ninth Circuit within 60
days of March 14, 2014.
ADDRESSES: Documents relevant to the
above-referenced permit are available
for public inspection during normal
business hours at the following address:
U.S. Environmental Protection Agency,
Region 9, 75 Hawthorne Street, San
Francisco, CA 94105–3901. To arrange
for viewing of these documents, call
Lisa Beckham at (415) 972–3811.
FOR FURTHER INFORMATION CONTACT: Lisa
Beckham, Permits Office (Air-3), U.S.
Environmental Protection Agency,
Region 9, (415) 972–3811,
beckham.lisa@epa.gov. Key portions of
the administrative record for this
decision (including the final permit, all
public comments, EPA’s responses to
the public comments, and additional
supporting information) are available
through a link at Region 9’s Web site,
www.epa.gov/region09/air/permit/r9permits-issued.html#psd, or at
www.regulations.gov (Docket ID # EPA–
R09–OAR–2011–0978). Anyone who
wishes to review the EPA
Environmental Appeals Board (EAB or
Board) decision described below or
documents in the EAB’s electronic
docket for its decision related to this
matter can obtain them at https://
www.epa.gov/eab/.
Notice of Final Action and
Supplementary Information: EPA
Region 9 issued its final permit decision
to PPLLC authorizing the construction
and operation of the PPEC, PSD Permit
No. SD 11–01, on February 28, 2014.
SUMMARY:
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
14505
EPA Region 9 initially issued a final
PSD permit decision to PPLLC for the
PPEC on November 19, 2012. Three
commenters filed petitions for review of
the Region’s November 19, 2012 PSD
permit decision for the PPEC with EPA’s
EAB. On August 2, 2013, the Board
issued a decision remanding in part and
denying review in part of the Region’s
November 19, 2012 PSD permit decision
for the PPEC. See In re Pio Pico Energy
Center PSD Permit No. SD 11–01, PSD
Appeal Nos. 12–04 through 12–06 (EAB,
Aug. 2, 2013) (Order Remanding in Part
and Denying Review in Part). The Board
remanded to Region 9 the emission
limits for particulate matter from the
combustion turbines and directed
Region 9 to prepare a revised Best
Available Control Technology (BACT)
analysis for particulate matter for the
Project’s combustion turbines in
accordance with the Board’s decision,
including a new BACT determination,
after consideration of all of the relevant
information. The Board also directed
Region 9 to reopen the public comment
period to provide the public with an
opportunity to comment on the
revisions to its particulate matter BACT
analysis. The EAB denied review of all
other issues.
In addition, the Board’s decision
stated that once Region 9 issues a final
permit decision following the public
comment period required by the
remand, the Region’s final permit
decision and the Board’s decision in
this matter would become final agency
action subject to judicial review per 40
CFR 124.19(l). The Board’s decision
further stated that the Board was not
requiring, and would not accept, an
appeal to the Board of the final permit
decision for the Project following
remand in this case.
In response to the EAB’s remand
decision, Region 9 prepared a revised
particulate matter BACT analysis and
BACT determination for the emission
limits for the Project’s combustion
turbines in accordance with the Board’s
order, and proposed revised permit
conditions for such limits. In November
of 2013, Region 9 issued a public notice
seeking public comment on this revised
analysis and these revised particulate
matter permit conditions, and on
December 17, 2013, Region 9 held a
public hearing to receive such comment.
EPA has carefully reviewed each of
the comments submitted and, after
consideration of the expressed views of
all commenters, the pertinent Federal
statutes and regulations, and additional
material relevant to the application and
contained in our Administrative Record,
EPA made a decision in accordance
E:\FR\FM\14MRN1.SGM
14MRN1
14506
Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices
with 40 CFR 52.21 to issue a final PSD
permit to PPLLC for the PPEC.
Following completion of the remand
proceedings, pursuant to 40 CFR
124.19(l)(2), EPA Region 9 issued a final
permit decision to PPLLC for the PPEC
on February 28, 2014. All conditions of
the PPEC PSD permit, Permit No. SD
11–01, issued February 28, 2014,
become final and effective on April 7,
2014.
Dated: March 7, 2014.
Deborah Jordan,
Director, Air Division, Region IX.
[FR Doc. 2014–05740 Filed 3–13–14; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9013–9]
Environmental Impact Statements;
Notice Of Availability
sroberts on DSK5SPTVN1PROD with NOTICES
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/03/2014 Through 03/07/2014
Pursuant to 40 CFR 1506.9.
Notice:
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20140062, Final EIS, NPS, CA,
Tuolumne Wild and Scenic River
Final Comprehensive Management
Plan, Review Period Ends: 04/14/
2014, Contact: Kathleen Morse 209–
379–1110.
EIS No. 20140063, Draft EIS, BLM, NM,
San Juan Basin Energy Connect
Project, Comment Period Ends: 04/28/
2014, Contact: Marcy Romero 505–
564–7600.
EIS No. 20140064, Draft Supplement,
USFS, MT, Beaverhead-Deerlodge
National Forest Land and Resource
Management Plan to Comply with a
District of Montana Court Order
(Temporary Roads), Comment Period
Ends: 06/12/2014, Contact: Jan Bowey
406–842–5432.
EIS No. 20140065, Draft EIS, USFS, OR,
Proposed Revised Land Management
Plans for the Malheur, Umatilla, and
Wallowa-Whitman National Forests,
Comment Period Ends: 06/16/2014,
Contact: Sabrina Stadler 541–523–
1264.
VerDate Mar<15>2010
19:18 Mar 13, 2014
Jkt 232001
EIS No. 20140066, Final EIS, BLM, NV,
Arturo Mine Project, Review Period
Ends:04/14/2014, Contact: John
Daniel 775–753–0277.
EIS No. 20140067, Final EIS, USFS, ND,
North Billings County Range
Allotment Management Plan
Revision, Review Period Ends: 04/28/
2014, Contact: Nickole Dahl 701–227–
7830.
EIS No. 20140068, Draft Supplement,
USFS, UT, Leasing and Underground
Mining of the Greens Hollow Federal
Coal Lease Tract UTU–102, Comment
Period Ends: 04/28/2014, Contact:
Marianne Orton 435–896–1090.
EIS No. 20140069, Draft EIS, USFS, MT,
Divide Travel Plan, Helena National
Forest, Comment Period Ends: 04/28/
2014, Contact: Heather DeGeest 406–
449–5201.
EIS No. 20140070, Final EIS, NASA, CA,
Proposed Demolition and
Environmental Cleanup Activities at
Santa Susana Field Laboratory,
Review Period Ends: 04/14/2014,
Contact: Allen Elliott 256–544–0662.
EIS No. 20140071, Draft EIS, NRCS, UT,
Green River Diversion Rehabilitation
Project, Comment Period Ends: 04/30/
2014, Contact: Bronson Smart 801–
524–4559.
EIS No. 20140072, Final EIS, NPS, NC,
Fort Raleigh National Historic Site,
General Management Plan, Review
Period Ends: 04/14/2014, Contact:
David Libman 404–507–5701.
ACTION:
Notice of final action.
This notice is to announce
that on October 28, 2013, the EPA
issued final Outer Continental Shelf
(OCS) air quality permit numbered
OCS–EPA–R4012 for Statoil Gulf
Services, LLC (Statoil); and on
November 25, 2013 and December 18,
2013, the EPA issued final Prevention of
Significant Deterioration (PSD) air
quality permits numbered PSD–EPA–
R4010 and PSD–EPA–R4014 for the
Florida Power & Light (FPL)—Port
Everglades Next Generation Clean
Energy Center (PEEC) and Tampa
Electric Company (TECO), respectively.
ADDRESSES: The final permits, the EPA’s
response to public comments for these
permits, and supporting information are
available at https://www.epa.gov/
region4/air/permits/index.htm. Copies
of the final permits and the EPA’s
response to comments are also available
for review at the EPA Regional Office
and upon request in writing. The EPA
requests that you contact the person
listed in the FOR FURTHER INFORMATION
CONTACT section to schedule your
inspection. The Regional Office’s
official hours of business are Monday
through Friday, 8:30 a.m. to 4:30 p.m.
excluding Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Please contact Ms. Heather Ceron, Air
Permits Section Chief, Air Planning
Branch, Air, Pesticides and Toxics
Amended Notices
Management Division, Region 4, U.S.
Environmental Protection Agency, 61
EIS No. 20140054, Revised Draft EIS,
Forsyth Street SW., Atlanta, Georgia
USFS, CA, Harris Vegetation
Management Project, Comment Period 30303–8960. The telephone number is
(404) 562–9185. Ms. Ceron can also be
Ends: 04/21/2014, Contact: Emelia H.
reached via electronic mail at
Barnum 530–926–4511 ext. 1600.
ceron.heather@epa.gov.
Revision to FR Notice Published 03/
SUPPLEMENTARY INFORMATION: On August
07/2014; Correcting Comment Period
9, 2013, EPA Region 4 requested public
from 4/25/2014 to 4/21/2014.
comments on a preliminary
Dated: March 11, 2014.
determination to issue an OCS air
Dawn Roberts,
permit for Statoil. During the public
Management Analyst, Office of Federal
comment period, which ended on
Activities.
September 9, 2013, the EPA received no
[FR Doc. 2014–05674 Filed 3–13–14; 8:45 am]
comments.
BILLING CODE 6560–50–P
On May 31, 2013, EPA Region 4
requested public comments on a
preliminary determination to issue a
ENVIRONMENTAL PROTECTION
PSD air quality permit for the FPL PEEC
AGENCY
project. A total of 26 comments from 3
[EPA–R04–OAR–2013–0577; EPA–R04–
commenters, including 1 request for a
OAR–2013–0431; and EPA–R04–OAR–2013– public hearing, were received (via email
0648; FRL–9907–98–Region–4]
and letter) during the public comment
period, which closed on July 2, 2013.
Notice of Issuance of Final Air Permits
On September 24, 2013, EPA Region
for Statoil Gulf Services, LLC, Florida
4 requested public comments on a
Power & Light—Port Everglades Next
preliminary determination to issue a
Generation Clean Energy Center, and
PSD air quality permit for the TECO
Tampa Electric Company.
project. A total of 25 comments from
two commenters were received (via
AGENCY: Environmental Protection
email) during the public comment
Agency (EPA).
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
SUMMARY:
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 79, Number 50 (Friday, March 14, 2014)]
[Notices]
[Pages 14505-14506]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05740]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-R09-OAR-2011-0978; FRL-9908-07-Region-9]
Notice of Decision To Issue Clean Air Act PSD Permit for the Pio
Pico Energy Center
AGENCY: United States Environmental Protection Agency (EPA) Region 9.
ACTION: Notice of final agency action.
-----------------------------------------------------------------------
SUMMARY: This notice announces that EPA Region 9 issued a final permit
decision for a Clean Air Act Prevention of Significant Deterioration
(PSD) permit to Pio Pico Energy Center, LLC (PPLLC) for the
construction of the Pio Pico Energy Center (PPEC).
DATES: EPA Region 9 issued a final PSD permit decision for the PPEC on
February 28, 2014. The PSD permit for the PPEC will become effective on
April 7, 2014. Pursuant to section 307(b)(1) of the Clean Air Act, 42
U.S.C. 7607(b)(1), judicial review of this final permit decision, to
the extent it is available, may be sought by filing a petition for
review in the United States Court of Appeals for the Ninth Circuit
within 60 days of March 14, 2014.
ADDRESSES: Documents relevant to the above-referenced permit are
available for public inspection during normal business hours at the
following address: U.S. Environmental Protection Agency, Region 9, 75
Hawthorne Street, San Francisco, CA 94105-3901. To arrange for viewing
of these documents, call Lisa Beckham at (415) 972-3811.
FOR FURTHER INFORMATION CONTACT: Lisa Beckham, Permits Office (Air-3),
U.S. Environmental Protection Agency, Region 9, (415) 972-3811,
beckham.lisa@epa.gov. Key portions of the administrative record for
this decision (including the final permit, all public comments, EPA's
responses to the public comments, and additional supporting
information) are available through a link at Region 9's Web site,
www.epa.gov/region09/air/permit/r9-permits-issued.html#psd, or at
www.regulations.gov (Docket ID EPA-R09-OAR-2011-0978). Anyone
who wishes to review the EPA Environmental Appeals Board (EAB or Board)
decision described below or documents in the EAB's electronic docket
for its decision related to this matter can obtain them at https://www.epa.gov/eab/.
Notice of Final Action and Supplementary Information: EPA Region 9
issued its final permit decision to PPLLC authorizing the construction
and operation of the PPEC, PSD Permit No. SD 11-01, on February 28,
2014.
EPA Region 9 initially issued a final PSD permit decision to PPLLC
for the PPEC on November 19, 2012. Three commenters filed petitions for
review of the Region's November 19, 2012 PSD permit decision for the
PPEC with EPA's EAB. On August 2, 2013, the Board issued a decision
remanding in part and denying review in part of the Region's November
19, 2012 PSD permit decision for the PPEC. See In re Pio Pico Energy
Center PSD Permit No. SD 11-01, PSD Appeal Nos. 12-04 through 12-06
(EAB, Aug. 2, 2013) (Order Remanding in Part and Denying Review in
Part). The Board remanded to Region 9 the emission limits for
particulate matter from the combustion turbines and directed Region 9
to prepare a revised Best Available Control Technology (BACT) analysis
for particulate matter for the Project's combustion turbines in
accordance with the Board's decision, including a new BACT
determination, after consideration of all of the relevant information.
The Board also directed Region 9 to reopen the public comment period to
provide the public with an opportunity to comment on the revisions to
its particulate matter BACT analysis. The EAB denied review of all
other issues.
In addition, the Board's decision stated that once Region 9 issues
a final permit decision following the public comment period required by
the remand, the Region's final permit decision and the Board's decision
in this matter would become final agency action subject to judicial
review per 40 CFR 124.19(l). The Board's decision further stated that
the Board was not requiring, and would not accept, an appeal to the
Board of the final permit decision for the Project following remand in
this case.
In response to the EAB's remand decision, Region 9 prepared a
revised particulate matter BACT analysis and BACT determination for the
emission limits for the Project's combustion turbines in accordance
with the Board's order, and proposed revised permit conditions for such
limits. In November of 2013, Region 9 issued a public notice seeking
public comment on this revised analysis and these revised particulate
matter permit conditions, and on December 17, 2013, Region 9 held a
public hearing to receive such comment.
EPA has carefully reviewed each of the comments submitted and,
after consideration of the expressed views of all commenters, the
pertinent Federal statutes and regulations, and additional material
relevant to the application and contained in our Administrative Record,
EPA made a decision in accordance
[[Page 14506]]
with 40 CFR 52.21 to issue a final PSD permit to PPLLC for the PPEC.
Following completion of the remand proceedings, pursuant to 40 CFR
124.19(l)(2), EPA Region 9 issued a final permit decision to PPLLC for
the PPEC on February 28, 2014. All conditions of the PPEC PSD permit,
Permit No. SD 11-01, issued February 28, 2014, become final and
effective on April 7, 2014.
Dated: March 7, 2014.
Deborah Jordan,
Director, Air Division, Region IX.
[FR Doc. 2014-05740 Filed 3-13-14; 8:45 am]
BILLING CODE 6560-50-P