Notice of Decision To Issue Clean Air Act PSD Permit for the Pio Pico Energy Center, 14505-14506 [2014-05740]

Download as PDF Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices electronic filing. Please file the requested information using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14345–001. Dated: March 7, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–05627 Filed 3–13–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RD14–6–000] Reliability Standards for Physical Security Measures; Notice of Designation of Commission Staff as Non-Decisional sroberts on DSK5SPTVN1PROD with NOTICES With respect to an order issued by the Commission today in the abovecaptioned docket, pursuant to 18 CFR 385.2201(c)(3) (2013), the staff identified below from the Office of Electric Reliability are designated as non-decisional in deliberations by the Commission in this docket. Accordingly, these persons will not serve as advisors to the Commission or otherwise be involved in the decisional process in this proceeding. Likewise, as non-decisional staff, pursuant to 18 CFR 385.2201 (2013), they are prohibited from communicating with advisory staff concerning any deliberations in this docket. The staff designated as non-decisional are: Edward Franks Regis Binder David O’Connor Mary Agnes Nimis Justin Kelly Andres Lopez Dated: March 7, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–05628 Filed 3–13–14; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 19:18 Mar 13, 2014 Jkt 232001 ENVIRONMENTAL PROTECTION AGENCY [EPA–R09–OAR–2011–0978; FRL–9908–07– Region–9] Notice of Decision To Issue Clean Air Act PSD Permit for the Pio Pico Energy Center United States Environmental Protection Agency (EPA) Region 9. ACTION: Notice of final agency action. AGENCY: This notice announces that EPA Region 9 issued a final permit decision for a Clean Air Act Prevention of Significant Deterioration (PSD) permit to Pio Pico Energy Center, LLC (PPLLC) for the construction of the Pio Pico Energy Center (PPEC). DATES: EPA Region 9 issued a final PSD permit decision for the PPEC on February 28, 2014. The PSD permit for the PPEC will become effective on April 7, 2014. Pursuant to section 307(b)(1) of the Clean Air Act, 42 U.S.C. 7607(b)(1), judicial review of this final permit decision, to the extent it is available, may be sought by filing a petition for review in the United States Court of Appeals for the Ninth Circuit within 60 days of March 14, 2014. ADDRESSES: Documents relevant to the above-referenced permit are available for public inspection during normal business hours at the following address: U.S. Environmental Protection Agency, Region 9, 75 Hawthorne Street, San Francisco, CA 94105–3901. To arrange for viewing of these documents, call Lisa Beckham at (415) 972–3811. FOR FURTHER INFORMATION CONTACT: Lisa Beckham, Permits Office (Air-3), U.S. Environmental Protection Agency, Region 9, (415) 972–3811, beckham.lisa@epa.gov. Key portions of the administrative record for this decision (including the final permit, all public comments, EPA’s responses to the public comments, and additional supporting information) are available through a link at Region 9’s Web site, www.epa.gov/region09/air/permit/r9permits-issued.html#psd, or at www.regulations.gov (Docket ID # EPA– R09–OAR–2011–0978). Anyone who wishes to review the EPA Environmental Appeals Board (EAB or Board) decision described below or documents in the EAB’s electronic docket for its decision related to this matter can obtain them at https:// www.epa.gov/eab/. Notice of Final Action and Supplementary Information: EPA Region 9 issued its final permit decision to PPLLC authorizing the construction and operation of the PPEC, PSD Permit No. SD 11–01, on February 28, 2014. SUMMARY: PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 14505 EPA Region 9 initially issued a final PSD permit decision to PPLLC for the PPEC on November 19, 2012. Three commenters filed petitions for review of the Region’s November 19, 2012 PSD permit decision for the PPEC with EPA’s EAB. On August 2, 2013, the Board issued a decision remanding in part and denying review in part of the Region’s November 19, 2012 PSD permit decision for the PPEC. See In re Pio Pico Energy Center PSD Permit No. SD 11–01, PSD Appeal Nos. 12–04 through 12–06 (EAB, Aug. 2, 2013) (Order Remanding in Part and Denying Review in Part). The Board remanded to Region 9 the emission limits for particulate matter from the combustion turbines and directed Region 9 to prepare a revised Best Available Control Technology (BACT) analysis for particulate matter for the Project’s combustion turbines in accordance with the Board’s decision, including a new BACT determination, after consideration of all of the relevant information. The Board also directed Region 9 to reopen the public comment period to provide the public with an opportunity to comment on the revisions to its particulate matter BACT analysis. The EAB denied review of all other issues. In addition, the Board’s decision stated that once Region 9 issues a final permit decision following the public comment period required by the remand, the Region’s final permit decision and the Board’s decision in this matter would become final agency action subject to judicial review per 40 CFR 124.19(l). The Board’s decision further stated that the Board was not requiring, and would not accept, an appeal to the Board of the final permit decision for the Project following remand in this case. In response to the EAB’s remand decision, Region 9 prepared a revised particulate matter BACT analysis and BACT determination for the emission limits for the Project’s combustion turbines in accordance with the Board’s order, and proposed revised permit conditions for such limits. In November of 2013, Region 9 issued a public notice seeking public comment on this revised analysis and these revised particulate matter permit conditions, and on December 17, 2013, Region 9 held a public hearing to receive such comment. EPA has carefully reviewed each of the comments submitted and, after consideration of the expressed views of all commenters, the pertinent Federal statutes and regulations, and additional material relevant to the application and contained in our Administrative Record, EPA made a decision in accordance E:\FR\FM\14MRN1.SGM 14MRN1 14506 Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices with 40 CFR 52.21 to issue a final PSD permit to PPLLC for the PPEC. Following completion of the remand proceedings, pursuant to 40 CFR 124.19(l)(2), EPA Region 9 issued a final permit decision to PPLLC for the PPEC on February 28, 2014. All conditions of the PPEC PSD permit, Permit No. SD 11–01, issued February 28, 2014, become final and effective on April 7, 2014. Dated: March 7, 2014. Deborah Jordan, Director, Air Division, Region IX. [FR Doc. 2014–05740 Filed 3–13–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9013–9] Environmental Impact Statements; Notice Of Availability sroberts on DSK5SPTVN1PROD with NOTICES Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/03/2014 Through 03/07/2014 Pursuant to 40 CFR 1506.9. Notice: Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20140062, Final EIS, NPS, CA, Tuolumne Wild and Scenic River Final Comprehensive Management Plan, Review Period Ends: 04/14/ 2014, Contact: Kathleen Morse 209– 379–1110. EIS No. 20140063, Draft EIS, BLM, NM, San Juan Basin Energy Connect Project, Comment Period Ends: 04/28/ 2014, Contact: Marcy Romero 505– 564–7600. EIS No. 20140064, Draft Supplement, USFS, MT, Beaverhead-Deerlodge National Forest Land and Resource Management Plan to Comply with a District of Montana Court Order (Temporary Roads), Comment Period Ends: 06/12/2014, Contact: Jan Bowey 406–842–5432. EIS No. 20140065, Draft EIS, USFS, OR, Proposed Revised Land Management Plans for the Malheur, Umatilla, and Wallowa-Whitman National Forests, Comment Period Ends: 06/16/2014, Contact: Sabrina Stadler 541–523– 1264. VerDate Mar<15>2010 19:18 Mar 13, 2014 Jkt 232001 EIS No. 20140066, Final EIS, BLM, NV, Arturo Mine Project, Review Period Ends:04/14/2014, Contact: John Daniel 775–753–0277. EIS No. 20140067, Final EIS, USFS, ND, North Billings County Range Allotment Management Plan Revision, Review Period Ends: 04/28/ 2014, Contact: Nickole Dahl 701–227– 7830. EIS No. 20140068, Draft Supplement, USFS, UT, Leasing and Underground Mining of the Greens Hollow Federal Coal Lease Tract UTU–102, Comment Period Ends: 04/28/2014, Contact: Marianne Orton 435–896–1090. EIS No. 20140069, Draft EIS, USFS, MT, Divide Travel Plan, Helena National Forest, Comment Period Ends: 04/28/ 2014, Contact: Heather DeGeest 406– 449–5201. EIS No. 20140070, Final EIS, NASA, CA, Proposed Demolition and Environmental Cleanup Activities at Santa Susana Field Laboratory, Review Period Ends: 04/14/2014, Contact: Allen Elliott 256–544–0662. EIS No. 20140071, Draft EIS, NRCS, UT, Green River Diversion Rehabilitation Project, Comment Period Ends: 04/30/ 2014, Contact: Bronson Smart 801– 524–4559. EIS No. 20140072, Final EIS, NPS, NC, Fort Raleigh National Historic Site, General Management Plan, Review Period Ends: 04/14/2014, Contact: David Libman 404–507–5701. ACTION: Notice of final action. This notice is to announce that on October 28, 2013, the EPA issued final Outer Continental Shelf (OCS) air quality permit numbered OCS–EPA–R4012 for Statoil Gulf Services, LLC (Statoil); and on November 25, 2013 and December 18, 2013, the EPA issued final Prevention of Significant Deterioration (PSD) air quality permits numbered PSD–EPA– R4010 and PSD–EPA–R4014 for the Florida Power & Light (FPL)—Port Everglades Next Generation Clean Energy Center (PEEC) and Tampa Electric Company (TECO), respectively. ADDRESSES: The final permits, the EPA’s response to public comments for these permits, and supporting information are available at https://www.epa.gov/ region4/air/permits/index.htm. Copies of the final permits and the EPA’s response to comments are also available for review at the EPA Regional Office and upon request in writing. The EPA requests that you contact the person listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office’s official hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m. excluding Federal holidays. FOR FURTHER INFORMATION CONTACT: Please contact Ms. Heather Ceron, Air Permits Section Chief, Air Planning Branch, Air, Pesticides and Toxics Amended Notices Management Division, Region 4, U.S. Environmental Protection Agency, 61 EIS No. 20140054, Revised Draft EIS, Forsyth Street SW., Atlanta, Georgia USFS, CA, Harris Vegetation Management Project, Comment Period 30303–8960. The telephone number is (404) 562–9185. Ms. Ceron can also be Ends: 04/21/2014, Contact: Emelia H. reached via electronic mail at Barnum 530–926–4511 ext. 1600. ceron.heather@epa.gov. Revision to FR Notice Published 03/ SUPPLEMENTARY INFORMATION: On August 07/2014; Correcting Comment Period 9, 2013, EPA Region 4 requested public from 4/25/2014 to 4/21/2014. comments on a preliminary Dated: March 11, 2014. determination to issue an OCS air Dawn Roberts, permit for Statoil. During the public Management Analyst, Office of Federal comment period, which ended on Activities. September 9, 2013, the EPA received no [FR Doc. 2014–05674 Filed 3–13–14; 8:45 am] comments. BILLING CODE 6560–50–P On May 31, 2013, EPA Region 4 requested public comments on a preliminary determination to issue a ENVIRONMENTAL PROTECTION PSD air quality permit for the FPL PEEC AGENCY project. A total of 26 comments from 3 [EPA–R04–OAR–2013–0577; EPA–R04– commenters, including 1 request for a OAR–2013–0431; and EPA–R04–OAR–2013– public hearing, were received (via email 0648; FRL–9907–98–Region–4] and letter) during the public comment period, which closed on July 2, 2013. Notice of Issuance of Final Air Permits On September 24, 2013, EPA Region for Statoil Gulf Services, LLC, Florida 4 requested public comments on a Power & Light—Port Everglades Next preliminary determination to issue a Generation Clean Energy Center, and PSD air quality permit for the TECO Tampa Electric Company. project. A total of 25 comments from two commenters were received (via AGENCY: Environmental Protection email) during the public comment Agency (EPA). PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 SUMMARY: E:\FR\FM\14MRN1.SGM 14MRN1

Agencies

[Federal Register Volume 79, Number 50 (Friday, March 14, 2014)]
[Notices]
[Pages 14505-14506]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05740]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-R09-OAR-2011-0978; FRL-9908-07-Region-9]


Notice of Decision To Issue Clean Air Act PSD Permit for the Pio 
Pico Energy Center

AGENCY: United States Environmental Protection Agency (EPA) Region 9.

ACTION: Notice of final agency action.

-----------------------------------------------------------------------

SUMMARY: This notice announces that EPA Region 9 issued a final permit 
decision for a Clean Air Act Prevention of Significant Deterioration 
(PSD) permit to Pio Pico Energy Center, LLC (PPLLC) for the 
construction of the Pio Pico Energy Center (PPEC).

DATES: EPA Region 9 issued a final PSD permit decision for the PPEC on 
February 28, 2014. The PSD permit for the PPEC will become effective on 
April 7, 2014. Pursuant to section 307(b)(1) of the Clean Air Act, 42 
U.S.C. 7607(b)(1), judicial review of this final permit decision, to 
the extent it is available, may be sought by filing a petition for 
review in the United States Court of Appeals for the Ninth Circuit 
within 60 days of March 14, 2014.

ADDRESSES: Documents relevant to the above-referenced permit are 
available for public inspection during normal business hours at the 
following address: U.S. Environmental Protection Agency, Region 9, 75 
Hawthorne Street, San Francisco, CA 94105-3901. To arrange for viewing 
of these documents, call Lisa Beckham at (415) 972-3811.

FOR FURTHER INFORMATION CONTACT: Lisa Beckham, Permits Office (Air-3), 
U.S. Environmental Protection Agency, Region 9, (415) 972-3811, 
beckham.lisa@epa.gov. Key portions of the administrative record for 
this decision (including the final permit, all public comments, EPA's 
responses to the public comments, and additional supporting 
information) are available through a link at Region 9's Web site, 
www.epa.gov/region09/air/permit/r9-permits-issued.html#psd, or at 
www.regulations.gov (Docket ID  EPA-R09-OAR-2011-0978). Anyone 
who wishes to review the EPA Environmental Appeals Board (EAB or Board) 
decision described below or documents in the EAB's electronic docket 
for its decision related to this matter can obtain them at https://www.epa.gov/eab/.
    Notice of Final Action and Supplementary Information: EPA Region 9 
issued its final permit decision to PPLLC authorizing the construction 
and operation of the PPEC, PSD Permit No. SD 11-01, on February 28, 
2014.
    EPA Region 9 initially issued a final PSD permit decision to PPLLC 
for the PPEC on November 19, 2012. Three commenters filed petitions for 
review of the Region's November 19, 2012 PSD permit decision for the 
PPEC with EPA's EAB. On August 2, 2013, the Board issued a decision 
remanding in part and denying review in part of the Region's November 
19, 2012 PSD permit decision for the PPEC. See In re Pio Pico Energy 
Center PSD Permit No. SD 11-01, PSD Appeal Nos. 12-04 through 12-06 
(EAB, Aug. 2, 2013) (Order Remanding in Part and Denying Review in 
Part). The Board remanded to Region 9 the emission limits for 
particulate matter from the combustion turbines and directed Region 9 
to prepare a revised Best Available Control Technology (BACT) analysis 
for particulate matter for the Project's combustion turbines in 
accordance with the Board's decision, including a new BACT 
determination, after consideration of all of the relevant information. 
The Board also directed Region 9 to reopen the public comment period to 
provide the public with an opportunity to comment on the revisions to 
its particulate matter BACT analysis. The EAB denied review of all 
other issues.
    In addition, the Board's decision stated that once Region 9 issues 
a final permit decision following the public comment period required by 
the remand, the Region's final permit decision and the Board's decision 
in this matter would become final agency action subject to judicial 
review per 40 CFR 124.19(l). The Board's decision further stated that 
the Board was not requiring, and would not accept, an appeal to the 
Board of the final permit decision for the Project following remand in 
this case.
    In response to the EAB's remand decision, Region 9 prepared a 
revised particulate matter BACT analysis and BACT determination for the 
emission limits for the Project's combustion turbines in accordance 
with the Board's order, and proposed revised permit conditions for such 
limits. In November of 2013, Region 9 issued a public notice seeking 
public comment on this revised analysis and these revised particulate 
matter permit conditions, and on December 17, 2013, Region 9 held a 
public hearing to receive such comment.
    EPA has carefully reviewed each of the comments submitted and, 
after consideration of the expressed views of all commenters, the 
pertinent Federal statutes and regulations, and additional material 
relevant to the application and contained in our Administrative Record, 
EPA made a decision in accordance

[[Page 14506]]

with 40 CFR 52.21 to issue a final PSD permit to PPLLC for the PPEC.
    Following completion of the remand proceedings, pursuant to 40 CFR 
124.19(l)(2), EPA Region 9 issued a final permit decision to PPLLC for 
the PPEC on February 28, 2014. All conditions of the PPEC PSD permit, 
Permit No. SD 11-01, issued February 28, 2014, become final and 
effective on April 7, 2014.

    Dated: March 7, 2014.
Deborah Jordan,
Director, Air Division, Region IX.
[FR Doc. 2014-05740 Filed 3-13-14; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.