Notice of Issuance of Final Air Permits for Statoil Gulf Services, LLC, Florida Power & Light-Port Everglades Next Generation Clean Energy Center, and Tampa Electric Company., 14506-14507 [2014-05737]

Download as PDF 14506 Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices with 40 CFR 52.21 to issue a final PSD permit to PPLLC for the PPEC. Following completion of the remand proceedings, pursuant to 40 CFR 124.19(l)(2), EPA Region 9 issued a final permit decision to PPLLC for the PPEC on February 28, 2014. All conditions of the PPEC PSD permit, Permit No. SD 11–01, issued February 28, 2014, become final and effective on April 7, 2014. Dated: March 7, 2014. Deborah Jordan, Director, Air Division, Region IX. [FR Doc. 2014–05740 Filed 3–13–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9013–9] Environmental Impact Statements; Notice Of Availability sroberts on DSK5SPTVN1PROD with NOTICES Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/03/2014 Through 03/07/2014 Pursuant to 40 CFR 1506.9. Notice: Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20140062, Final EIS, NPS, CA, Tuolumne Wild and Scenic River Final Comprehensive Management Plan, Review Period Ends: 04/14/ 2014, Contact: Kathleen Morse 209– 379–1110. EIS No. 20140063, Draft EIS, BLM, NM, San Juan Basin Energy Connect Project, Comment Period Ends: 04/28/ 2014, Contact: Marcy Romero 505– 564–7600. EIS No. 20140064, Draft Supplement, USFS, MT, Beaverhead-Deerlodge National Forest Land and Resource Management Plan to Comply with a District of Montana Court Order (Temporary Roads), Comment Period Ends: 06/12/2014, Contact: Jan Bowey 406–842–5432. EIS No. 20140065, Draft EIS, USFS, OR, Proposed Revised Land Management Plans for the Malheur, Umatilla, and Wallowa-Whitman National Forests, Comment Period Ends: 06/16/2014, Contact: Sabrina Stadler 541–523– 1264. VerDate Mar<15>2010 19:18 Mar 13, 2014 Jkt 232001 EIS No. 20140066, Final EIS, BLM, NV, Arturo Mine Project, Review Period Ends:04/14/2014, Contact: John Daniel 775–753–0277. EIS No. 20140067, Final EIS, USFS, ND, North Billings County Range Allotment Management Plan Revision, Review Period Ends: 04/28/ 2014, Contact: Nickole Dahl 701–227– 7830. EIS No. 20140068, Draft Supplement, USFS, UT, Leasing and Underground Mining of the Greens Hollow Federal Coal Lease Tract UTU–102, Comment Period Ends: 04/28/2014, Contact: Marianne Orton 435–896–1090. EIS No. 20140069, Draft EIS, USFS, MT, Divide Travel Plan, Helena National Forest, Comment Period Ends: 04/28/ 2014, Contact: Heather DeGeest 406– 449–5201. EIS No. 20140070, Final EIS, NASA, CA, Proposed Demolition and Environmental Cleanup Activities at Santa Susana Field Laboratory, Review Period Ends: 04/14/2014, Contact: Allen Elliott 256–544–0662. EIS No. 20140071, Draft EIS, NRCS, UT, Green River Diversion Rehabilitation Project, Comment Period Ends: 04/30/ 2014, Contact: Bronson Smart 801– 524–4559. EIS No. 20140072, Final EIS, NPS, NC, Fort Raleigh National Historic Site, General Management Plan, Review Period Ends: 04/14/2014, Contact: David Libman 404–507–5701. ACTION: Notice of final action. This notice is to announce that on October 28, 2013, the EPA issued final Outer Continental Shelf (OCS) air quality permit numbered OCS–EPA–R4012 for Statoil Gulf Services, LLC (Statoil); and on November 25, 2013 and December 18, 2013, the EPA issued final Prevention of Significant Deterioration (PSD) air quality permits numbered PSD–EPA– R4010 and PSD–EPA–R4014 for the Florida Power & Light (FPL)—Port Everglades Next Generation Clean Energy Center (PEEC) and Tampa Electric Company (TECO), respectively. ADDRESSES: The final permits, the EPA’s response to public comments for these permits, and supporting information are available at https://www.epa.gov/ region4/air/permits/index.htm. Copies of the final permits and the EPA’s response to comments are also available for review at the EPA Regional Office and upon request in writing. The EPA requests that you contact the person listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office’s official hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m. excluding Federal holidays. FOR FURTHER INFORMATION CONTACT: Please contact Ms. Heather Ceron, Air Permits Section Chief, Air Planning Branch, Air, Pesticides and Toxics Amended Notices Management Division, Region 4, U.S. Environmental Protection Agency, 61 EIS No. 20140054, Revised Draft EIS, Forsyth Street SW., Atlanta, Georgia USFS, CA, Harris Vegetation Management Project, Comment Period 30303–8960. The telephone number is (404) 562–9185. Ms. Ceron can also be Ends: 04/21/2014, Contact: Emelia H. reached via electronic mail at Barnum 530–926–4511 ext. 1600. ceron.heather@epa.gov. Revision to FR Notice Published 03/ SUPPLEMENTARY INFORMATION: On August 07/2014; Correcting Comment Period 9, 2013, EPA Region 4 requested public from 4/25/2014 to 4/21/2014. comments on a preliminary Dated: March 11, 2014. determination to issue an OCS air Dawn Roberts, permit for Statoil. During the public Management Analyst, Office of Federal comment period, which ended on Activities. September 9, 2013, the EPA received no [FR Doc. 2014–05674 Filed 3–13–14; 8:45 am] comments. BILLING CODE 6560–50–P On May 31, 2013, EPA Region 4 requested public comments on a preliminary determination to issue a ENVIRONMENTAL PROTECTION PSD air quality permit for the FPL PEEC AGENCY project. A total of 26 comments from 3 [EPA–R04–OAR–2013–0577; EPA–R04– commenters, including 1 request for a OAR–2013–0431; and EPA–R04–OAR–2013– public hearing, were received (via email 0648; FRL–9907–98–Region–4] and letter) during the public comment period, which closed on July 2, 2013. Notice of Issuance of Final Air Permits On September 24, 2013, EPA Region for Statoil Gulf Services, LLC, Florida 4 requested public comments on a Power & Light—Port Everglades Next preliminary determination to issue a Generation Clean Energy Center, and PSD air quality permit for the TECO Tampa Electric Company. project. A total of 25 comments from two commenters were received (via AGENCY: Environmental Protection email) during the public comment Agency (EPA). PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 SUMMARY: E:\FR\FM\14MRN1.SGM 14MRN1 Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices sroberts on DSK5SPTVN1PROD with NOTICES period, which closed on October 25, 2013. The EPA reviewed each comment received and prepared a Response to Comments document for the two projects. After consideration of the expressed view of all interested persons, the pertinent federal statutes and regulations, the applications and supplemental information submitted by the applicants, and additional material relevant to the applications and contained in the Administrative Records, the EPA made final determinations in accordance with title 40 CFR part 52 and part 55 (for Statoil) to issue final air permits. Under 40 CFR 124.19(f)(2), notice of any final Agency action regarding a PSD permit must be published in the Federal Register. Section 307(b)(1) of the CAA provides for review of final Agency action that is locally or regionally applicable in the United States Court of Appeals for the appropriate circuit. Such a petition for review of final Agency action must be filed within 60 days from the date of notice of such action in the Federal Register. For purposes of judicial review under the CAA, final Agency action occurs when a final PSD permit is issued or denied by the EPA and Agency review procedures are exhausted, per 40 CFR 124.19(f)(1). Any person who filed comments on the draft permits was provided the opportunity to petition the Environmental Appeals Board by the end of November 26, 2013 for the Statoil permit, by the end of December 26, 2013 for the PEEC permit, or by the end of January 17, 2014 for the TECO permit. No petitions were submitted for any of these permits. Therefore, the Statoil permit became effective on November 27, 2013. The PEEC permit became effective on December 27, 2013. This date was changed from December 25, 2013, as stated on the final permit, to correct for the effective date coinciding with a federal holiday. The TECO permit became effective on January 18, 2014. Dated: February 27, 2014. Carol L. Kemker, Acting Director, Air, Pesticides and Toxics, Management Division, Region 4. [FR Doc. 2014–05737 Filed 3–13–14; 8:45 am] BILLING CODE 6560–50–P VerDate Mar<15>2010 19:18 Mar 13, 2014 Jkt 232001 ENVIRONMENTAL PROTECTION AGENCY [FRL–9907–84–Region–10] Final Modification of the National Pollutant Discharge Elimination System (NPDES) General Permit (GP) for Small Suction Dredges in Idaho, IDG370000 Environmental Protection Agency (EPA). ACTION: Final notice of modification of a general permit. AGENCY: When the 2013 General Permit (GP) was issued, the language of the GP contained a discrepancy with the total maximum daily load (TMDL) that was issued for Mores Creek. The Environmental Protection Agency (EPA) proposed to modify the permit on December 18, 2013, and provided a 45 day comment period. EPA prepared a Response to Comments and modified the GP so it now includes the tributaries of Mores, Elk or Grimes creeks in the loading allocations of the TMDL and a list of these tributaries in Appendix F. DATES: The modified GP will be effective on April 14, 2014. ADDRESSES: Copies of the modified general permit, Statement of Basis and Response to Comments are available upon request. Requests may be made to Tracy DeGering at (208) 378–5756 or to Cindi Godsey at (907) 271–6561. Requests may also be electronically mailed to: degering.tracy@epa.gov or godsey.cindi@epa.gov. Written requests may be submitted to EPA, Region 10, 1200 Sixth Avenue, Suite 900, OWW–130, Seattle, WA 98101. FOR FURTHER INFORMATION CONTACT: The GP, Statement of Basis and Response to Comments along with detailed maps and other useful information may be found on the Region 10 Web site at: https://yosemite.epa.gov/r10/water.nsf/ npdes+permits/idsuction-gp. SUPPLEMENTARY INFORMATION: Executive Order 12866: The Office of Management and Budget has exempted this action from the review requirements of Executive Order 12866 pursuant to Section 6 of that order. Regulatory Flexibility Act: Under the Regulatory Flexibility Act (RFA), 5 U.S.C. 601 et seq., a Federal agency must prepare an initial regulatory flexibility analysis ‘‘for any proposed rule’’ for which the agency ‘‘is required by section 553 of the Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.’’ The RFA exempts from this requirement any rule that the SUMMARY: PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 14507 issuing agency certifies ‘‘will not, if promulgated, have a significant economic impact on a substantial number of small entities.’’ EPA has concluded that NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA. Notwithstanding that general permits are not subject to the RFA, EPA has determined that these general permits, as issued, will not have a significant economic impact on a substantial number of small entities. Dated: March 5, 2014. Daniel D. Opalski, Director, Office of Water & Watersheds, Region 10, U.S. Environmental Protection Agency. [FR Doc. 2014–05724 Filed 3–13–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9907–95–Region–4; CERCLA–04– 2013–3763] LWD, Inc. Superfund Site; Calverty City, Marshall County, Kentucky; Notice of Settlement Environmental Protection Agency (EPA). AGENCY: ACTION: Notice of Settlement. Under 122(h) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the United States Environmental Protection Agency (EPA) has entered into a settlement with the approximately fifty (50) parties concerning the LWD, Inc. Superfund Site located in Calvert City, Marshall County, Kentucky. The settlement addresses remaining costs from a fundlead Removal Action taken by the EPA at the Site. SUMMARY: The Agency will consider public comments on the settlement until April 14, 2014. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the amended settlement is inappropriate, improper, or inadequate. DATES: Copies of the settlement are available from the Agency by contacting Ms. Paula V. Painter, Environmental Protection Specialist using the contact information provided in this notice. Comments may also be submitted by referencing the Site’s name through one of the following methods: ADDRESSES: E:\FR\FM\14MRN1.SGM 14MRN1

Agencies

[Federal Register Volume 79, Number 50 (Friday, March 14, 2014)]
[Notices]
[Pages 14506-14507]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05737]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-R04-OAR-2013-0577; EPA-R04-OAR-2013-0431; and EPA-R04-OAR-2013-
0648; FRL-9907-98-Region-4]


Notice of Issuance of Final Air Permits for Statoil Gulf 
Services, LLC, Florida Power & Light--Port Everglades Next Generation 
Clean Energy Center, and Tampa Electric Company.

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of final action.

-----------------------------------------------------------------------

SUMMARY: This notice is to announce that on October 28, 2013, the EPA 
issued final Outer Continental Shelf (OCS) air quality permit numbered 
OCS-EPA-R4012 for Statoil Gulf Services, LLC (Statoil); and on November 
25, 2013 and December 18, 2013, the EPA issued final Prevention of 
Significant Deterioration (PSD) air quality permits numbered PSD-EPA-
R4010 and PSD-EPA-R4014 for the Florida Power & Light (FPL)--Port 
Everglades Next Generation Clean Energy Center (PEEC) and Tampa 
Electric Company (TECO), respectively.

ADDRESSES: The final permits, the EPA's response to public comments for 
these permits, and supporting information are available at https://www.epa.gov/region4/air/permits/index.htm. Copies of the final permits 
and the EPA's response to comments are also available for review at the 
EPA Regional Office and upon request in writing. The EPA requests that 
you contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section to schedule your inspection. The Regional Office's official 
hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m. 
excluding Federal holidays.

FOR FURTHER INFORMATION CONTACT: Please contact Ms. Heather Ceron, Air 
Permits Section Chief, Air Planning Branch, Air, Pesticides and Toxics 
Management Division, Region 4, U.S. Environmental Protection Agency, 61 
Forsyth Street SW., Atlanta, Georgia 30303-8960. The telephone number 
is (404) 562-9185. Ms. Ceron can also be reached via electronic mail at 
ceron.heather@epa.gov.

SUPPLEMENTARY INFORMATION: On August 9, 2013, EPA Region 4 requested 
public comments on a preliminary determination to issue an OCS air 
permit for Statoil. During the public comment period, which ended on 
September 9, 2013, the EPA received no comments.
    On May 31, 2013, EPA Region 4 requested public comments on a 
preliminary determination to issue a PSD air quality permit for the FPL 
PEEC project. A total of 26 comments from 3 commenters, including 1 
request for a public hearing, were received (via email and letter) 
during the public comment period, which closed on July 2, 2013.
    On September 24, 2013, EPA Region 4 requested public comments on a 
preliminary determination to issue a PSD air quality permit for the 
TECO project. A total of 25 comments from two commenters were received 
(via email) during the public comment

[[Page 14507]]

period, which closed on October 25, 2013.
    The EPA reviewed each comment received and prepared a Response to 
Comments document for the two projects. After consideration of the 
expressed view of all interested persons, the pertinent federal 
statutes and regulations, the applications and supplemental information 
submitted by the applicants, and additional material relevant to the 
applications and contained in the Administrative Records, the EPA made 
final determinations in accordance with title 40 CFR part 52 and part 
55 (for Statoil) to issue final air permits.
    Under 40 CFR 124.19(f)(2), notice of any final Agency action 
regarding a PSD permit must be published in the Federal Register. 
Section 307(b)(1) of the CAA provides for review of final Agency action 
that is locally or regionally applicable in the United States Court of 
Appeals for the appropriate circuit. Such a petition for review of 
final Agency action must be filed within 60 days from the date of 
notice of such action in the Federal Register. For purposes of judicial 
review under the CAA, final Agency action occurs when a final PSD 
permit is issued or denied by the EPA and Agency review procedures are 
exhausted, per 40 CFR 124.19(f)(1).
    Any person who filed comments on the draft permits was provided the 
opportunity to petition the Environmental Appeals Board by the end of 
November 26, 2013 for the Statoil permit, by the end of December 26, 
2013 for the PEEC permit, or by the end of January 17, 2014 for the 
TECO permit. No petitions were submitted for any of these permits. 
Therefore, the Statoil permit became effective on November 27, 2013. 
The PEEC permit became effective on December 27, 2013. This date was 
changed from December 25, 2013, as stated on the final permit, to 
correct for the effective date coinciding with a federal holiday. The 
TECO permit became effective on January 18, 2014.

    Dated: February 27, 2014.
Carol L. Kemker,
Acting Director, Air, Pesticides and Toxics, Management Division, 
Region 4.
[FR Doc. 2014-05737 Filed 3-13-14; 8:45 am]
BILLING CODE 6560-50-P