Woodland Pulp, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 14500-14501 [2014-05625]
Download as PDF
14500
Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov/fdsys. At this site you
can view this document, as well as all
other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF you must
have Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Dated: March 11, 2014.
Nadya Chinoy Dabby,
Associate Assistant Deputy Secretary for
Innovation and Improvement, delegated the
authority to perform the functions and duties
of the Assistant Deputy Secretary.
[FR Doc. 2014–05706 Filed 3–13–14; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
U.S. Energy Information
Administration
Proposed Agency Information
Collection
U.S. Energy Information
Administration (EIA), U.S. Department
of Energy.
ACTION: Notice and Request for OMB
Review and Comment.
AGENCY:
In accordance with the
provisions of the Paperwork Reduction
Act of 1995, EIA has submitted to the
Office of Management and Budget
(OMB) for clearance:
• EIA–3 ‘‘Quarterly Survey of NonElectric Sector Coal Data’’
• EIA–6 ‘‘Emergency Coal Supply
Survey (Standby)’’
• EIA–7A ‘‘Annual Survey of Coal
Production and Preparation’’
• EIA–8A ‘‘Annual Survey of Coal
Stocks and Coal Exports’’
• EIA–20 ‘‘Emergency Weekly Coal
Monitoring Survey for Coal Burning
Power Producers (Standby)’’
The proposed coal forms will be used
to collect production, consumption,
receipts, stocks, and prices. EIA
proposes to discontinue standby Forms
EIA–1 and EIA–4. To date, these forms
have never been deployed. In addition,
sroberts on DSK5SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
19:18 Mar 13, 2014
Jkt 232001
coal and coke data collected on Form
EIA–5 in Schedules II, III, and IV will
now be collected on Form EIA–3.
Hence, EIA proposes to discontinue the
Form EIA–5. Forms EIA–7A and EIA–
8A will now include new fields for
metallurgical and non-metallurgical coal
under sections on Open and Captive
Market Sales to gather more accurate
revenue data from each type of sale, in
addition to new questions that were
proposed, to reduce double-counting
and improve accuracy of data
submitted. Improvements to
instructions have been proposed on all
forms. Form title changes are proposed
for all surveys in the package, including
standby Forms EIA–6 and EIA–20. We
have updated the number of
respondents and annual burden hours to
reflect the most recent respondent count
in our four frames. The number of
respondents now reporting on the EIA–
3 and EIA–7A has decreased
significantly.
DATES: Comments regarding this
proposed information collection must
be received on or before April 14, 2014.
If you anticipate that you will be
submitting comments, but find it
difficult to do so within the period of
time allowed by this notice, please
advise the DOE Desk Officer at OMB of
your intention to make a submission as
soon as possible. The Desk Officer may
be telephoned at 202–395–4650.
ADDRESSES: Written comments should
be sent to the
DOE Desk Officer, Office of Information
and Regulatory Affairs, Office of
Management and Budget, New
Executive Office Building, Room
10102, 735 17th Street NW.,
Washington, DC 20503.
And to
Attn: Tejasvi Raghuveer, EIA–3 Survey
Manager, U.S. Energy Information
Administration, EI–24, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Requests for additional information or
copies of the information collection
instrument and instructions should be
directed to Tejasvi Raghuveer at
Tejasvi.raghuveer@eia.gov. The
collection instruments can be viewed
using link: https://www.eia.gov/survey/
#eia-3.
SUPPLEMENTARY INFORMATION: This
information collection request contains:
(1) OMB No. 1905–0167; (2) Information
Collection Request Title: Coal Program
Package; (3) Type of Request: Revision;
(4) Purpose: The coal surveys collect
data on coal production, consumption,
stocks, prices, imports and exports. Data
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
are published in various EIA
publications. Respondents include
producers of coke, purchasers and
distributors of coal, coal mining
operators, and coal-consuming nonelectric sites; (5) Annual Estimated
Number of Respondents: 1788; (6)
Annual Estimated Number of Total
Responses: 3270; (7) Annual Estimated
Number of Burden Hours: 3764; (8)
Annual Estimated Reporting and
Recordkeeping Cost Burden: EIA
estimates that there are no additional
costs to respondents associated with the
surveys other than the costs associated
with the burden hours.
Statutory Authority: Section 13(b) of the
Federal Energy Administration Act of 1974,
Public Law 93–275, codified at 15 U.S.C.
772(b), and the DOE Organization Act of
1977, Public Law 95–91, codified at 42 U.S.C.
7101 et seq.
Issued in Washington, DC, on March 7,
2014.
Stephen Harvey,
Assistant Administrator for Energy Statistics,
U. S. Energy Information Administration.
[FR Doc. 2014–05654 Filed 3–13–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2492–013]
Woodland Pulp, LLC; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor
License.
b. Project No.: 2492–013.
c. Date Filed: February 28, 2014.
d. Applicant: Woodland Pulp, LLC
(Woodland Pulp).
e. Name of Project: Vanceboro Dam
Storage Project.
f. Location: The existing project is
located on the outlet of Spednik Lake,
on the east branch of the Saint Croix
River, in Washington County, Maine
and New Brunswick, Canada. The
project does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Jay Beaudoin,
Woodland Pulp, LLC, 144 Main Street,
Baileyville, Maine 04694, (207) 427–
4005 or Jay.Beaudoin@
woodlandpulp.com.
E:\FR\FM\14MRN1.SGM
14MRN1
sroberts on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices
i. FERC Contact: Michael Watts, (202)
502–6123 or michael.watts@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
existing Vanceboro Dam Storage Project
consists of: (1) A 16-foot-high, 469-footlong dam comprised of a 170-foot-long
earthen embankment section, a 230-footlong earthen embankment section, and a
69-foot-long gated concrete spillway
section with two 22.5-foot-long, 14.5foot-high steel Tainter gates with a crest
elevation of 385.86 feet above mean sea
level (msl); (2) an 8-foot-wide concrete
vertical-slot upstream fishway; (3) an
18,558-acre impoundment (Spednik
Lake) with a maximum pool elevation of
385.86 feet msl; and (4) appurtenant
facilities.
The Vanceboro Dam Storage Project
operates in a seasonal store and release
mode. The existing license requires a
minimum impoundment elevation of
371.5 feet msl, if possible, between
October 1 and April 30; a minimum
impoundment elevation of 376.5 feet
msl, if possible, between May 1 and
September 30; a maximum
impoundment elevation of 385.86 feet
msl, if possible; and a year round
minimum downstream flow of 200
cubic feet per second.
Woodland Pulp is not proposing any
new project facilities or changes in
project operation.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
VerDate Mar<15>2010
19:18 Mar 13, 2014
Jkt 232001
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis.
Filing of recommendations,
preliminary terms and
conditions, and fishway
prescriptions.
Commission issues NonDraft EA.
Comments on EA ..............
Modified terms and conditions.
April 2014.
June 2014.
October 2014.
November 2014.
January 2015.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: March 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05625 Filed 3–13–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 13728–001]
Goodwin Power, LLC; Notice of Intent
to File License Application, Filing of
Pre-Application Document, and
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 13728–001.
c. Date Filed: October 30, 2013.
d. Submitted By: Goodwin Power,
LLC.
e. Name of Project: Goodwin Dam
Hydroelectric Project.
f. Location: On the Stanislaus River,
in Tuolumne County, California. No
federal lands are occupied by the project
works or located within the project
boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
Magnus Johannesson, CEO, Goodwin
Power, LLC, 46 E. Penninsula Center,
Palos Verde Estates, CA 90274; (310)
699–6400; mj@americarenewables.com.
i. FERC Contact: Jennifer Adams at
(202) 502–8087; or email at
jennifer.adams@ferc.gov.
j. Goodwin Power, LLC (Goodwin
Power) filed its request to use the
Traditional Licensing Process on
October 30, 2013. Goodwin Power
provided public notice of its request on
December 18, 2013. In a letter dated
March 7, 2014, the Director of the
PO 00000
Frm 00031
Fmt 4703
Sfmt 9990
14501
Division of Hydropower Licensing
approved Goodwin Power’s request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the California State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Goodwin Power as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens
Fishery Conservation and Management
Act, and section 106 of the National
Historic Preservation Act.
m. Goodwin Power filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05626 Filed 3–13–14; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 79, Number 50 (Friday, March 14, 2014)]
[Notices]
[Pages 14500-14501]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05625]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2492-013]
Woodland Pulp, LLC; Notice of Application Tendered for Filing
With the Commission and Establishing Procedural Schedule for Licensing
and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Minor License.
b. Project No.: 2492-013.
c. Date Filed: February 28, 2014.
d. Applicant: Woodland Pulp, LLC (Woodland Pulp).
e. Name of Project: Vanceboro Dam Storage Project.
f. Location: The existing project is located on the outlet of
Spednik Lake, on the east branch of the Saint Croix River, in
Washington County, Maine and New Brunswick, Canada. The project does
not affect federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Jay Beaudoin, Woodland Pulp, LLC, 144 Main
Street, Baileyville, Maine 04694, (207) 427-4005 or
Jay.Beaudoin@woodlandpulp.com.
[[Page 14501]]
i. FERC Contact: Michael Watts, (202) 502-6123 or
michael.watts@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The existing Vanceboro Dam Storage
Project consists of: (1) A 16-foot-high, 469-foot-long dam comprised of
a 170-foot-long earthen embankment section, a 230-foot-long earthen
embankment section, and a 69-foot-long gated concrete spillway section
with two 22.5-foot-long, 14.5-foot-high steel Tainter gates with a
crest elevation of 385.86 feet above mean sea level (msl); (2) an 8-
foot-wide concrete vertical-slot upstream fishway; (3) an 18,558-acre
impoundment (Spednik Lake) with a maximum pool elevation of 385.86 feet
msl; and (4) appurtenant facilities.
The Vanceboro Dam Storage Project operates in a seasonal store and
release mode. The existing license requires a minimum impoundment
elevation of 371.5 feet msl, if possible, between October 1 and April
30; a minimum impoundment elevation of 376.5 feet msl, if possible,
between May 1 and September 30; a maximum impoundment elevation of
385.86 feet msl, if possible; and a year round minimum downstream flow
of 200 cubic feet per second.
Woodland Pulp is not proposing any new project facilities or
changes in project operation.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready April 2014.
for Environmental Analysis.
Filing of recommendations, preliminary June 2014.
terms and conditions, and fishway
prescriptions.
Commission issues Non-Draft EA......... October 2014.
Comments on EA......................... November 2014.
Modified terms and conditions.......... January 2015.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: March 7, 2014.
Kimberly D. Bose,
Secretary.