Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 14502 [2014-05624]
Download as PDF
14502
Federal Register / Vol. 79, No. 50 / Friday, March 14, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 803–103]
sroberts on DSK5SPTVN1PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for Temporary Variance of License
Requirement.
b. Project No.: 803–103.
c. Date Filed: March 4, 2014.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: DeSabla
Centerville.
f. Location: Butte Creek and West
Branch Feather River in Butte County,
California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Rich Doble,
Senior License Coordinator, Pacific Gas
and Electric Company, Mail Code:
N11C, P.O. Box 770000, San Francisco,
CA 94177. Phone (415) 973–4480.
i. FERC Contact: Mr. John Aedo, (415)
369–3335, or john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 15 days from the
issuance date of this notice by the
Commission (March 24, 2014). The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
803–103) on any comments, motions to
intervene, protests, or recommendations
filed.
k. Description of Request: The
licensee requests Commission approval
for a temporary variance of the
minimum flow requirements of Article
VerDate Mar<15>2010
19:18 Mar 13, 2014
Jkt 232001
39 of the project license. The licensee
proposes to reduce flows from Philbrook
Reservoir to 0.8 cubic feet per second
(cfs) (with an additional 0.2 cfs flow
buffer) to ensure the availability of cold
water storage for spring-run Chinook
salmon during the fish holding period
in the summer. The licensee explains
that current drought conditions have
resulted in depressed storage levels in
Philbrook Reservoir and that spring-run
Chinook salmon have already entered
Butte Creek. The licensee requests the
above variance until June 1, 2014, or
until conditions improve, as determined
by the licensee and resource agencies at
monthly meetings.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title ‘‘Comments’’,
‘‘Protest’’, or ‘‘Motion To Intervene’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05624 Filed 3–13–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 308–007]
PacifiCorp Energy; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License (Minor Project).
b. Project No.: 308–007.
c. Date Filed: February 28, 2014.
d. Applicant: PacifiCorp Energy
(PacifiCorp).
e. Name of Project: Wallowa Falls
Hydroelectric Project.
f. Location: The existing project is
located on Royal Purple Creek and the
East and West Forks of the Wallowa
River in Wallowa County, Oregon. The
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 79, Number 50 (Friday, March 14, 2014)]
[Notices]
[Page 14502]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05624]
[[Page 14502]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 803-103]
Pacific Gas and Electric Company; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application for Temporary Variance of
License Requirement.
b. Project No.: 803-103.
c. Date Filed: March 4, 2014.
d. Applicant: Pacific Gas and Electric Company (licensee).
e. Name of Project: DeSabla Centerville.
f. Location: Butte Creek and West Branch Feather River in Butte
County, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Rich Doble, Senior License Coordinator,
Pacific Gas and Electric Company, Mail Code: N11C, P.O. Box 770000, San
Francisco, CA 94177. Phone (415) 973-4480.
i. FERC Contact: Mr. John Aedo, (415) 369-3335, or
john.aedo@ferc.gov.
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is 15 days from the issuance date of this notice by
the Commission (March 24, 2014). The Commission strongly encourages
electronic filing. Please file motions to intervene, protests,
comments, or recommendations using the Commission's eFiling system at
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. Please include the project number (P-
803-103) on any comments, motions to intervene, protests, or
recommendations filed.
k. Description of Request: The licensee requests Commission
approval for a temporary variance of the minimum flow requirements of
Article 39 of the project license. The licensee proposes to reduce
flows from Philbrook Reservoir to 0.8 cubic feet per second (cfs) (with
an additional 0.2 cfs flow buffer) to ensure the availability of cold
water storage for spring-run Chinook salmon during the fish holding
period in the summer. The licensee explains that current drought
conditions have resulted in depressed storage levels in Philbrook
Reservoir and that spring-run Chinook salmon have already entered Butte
Creek. The licensee requests the above variance until June 1, 2014, or
until conditions improve, as determined by the licensee and resource
agencies at monthly meetings.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``Comments'', ``Protest'', or
``Motion To Intervene'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-05624 Filed 3-13-14; 8:45 am]
BILLING CODE 6717-01-P