City of Pasadena Water & Power Department;, 14030-14031 [2014-05419]

Download as PDF 14030 Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Dated: March 5, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–05302 Filed 3–11–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14–1422–000] tkelley on DSK3SPTVN1PROD with NOTICES RockTenn CP, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of RockTenn CP, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is March 25, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, VerDate Mar<15>2010 17:51 Mar 11, 2014 Jkt 232001 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 5, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–05327 Filed 3–11–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1250–019] City of Pasadena Water & Power Department; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing. b. Project No.: 1250–019. c. Date Filed: December 24, 2013. d. Submitted By: City of Pasadena Water & Power Department. e. Name of Project: Azusa Hydroelectric Project. f. Location: On the San Gabriel River, in Los Angeles County, California. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Arturo Silva, Power Production Superintendent, City of Pasadena Water and Power Department, 85 East State Street, Pasadena, CA 91105–3418; (626) 744–4568; email—asilva@ cityofpasadena.net. i. FERC Contact: Shana Murray at (202) 502–8333; or email at shana.murray@ferc.gov. j. City of Pasadena Water & Power Department filed its request to use the Traditional Licensing Process on December 24, 2013. City of Pasadena PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 Water & Power Department provided public notice of its request on December 23, 2013. In a letter dated March 6, 2014, the Director of the Division of Hydropower Licensing approved City of Pasadena Water & Power Department’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the California State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating City of Pasadena Water & Power Department as the Commission’s nonfederal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the MagnusonStevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. City of Pasadena Water & Power Department filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 1250. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by December 31, 2016. E:\FR\FM\12MRN1.SGM 12MRN1 Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: March 6, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–05419 Filed 3–11–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13877–001] tkelley on DSK3SPTVN1PROD with NOTICES Mahoning Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 13877–001. c. Date Filed: January 2, 2014. d. Submitted By: Mahoning Hydropower, LLC. e. Name of Project: Stonewall Jackson Hydroelectric Project. f. Location: On the West Fork River, in Lewis County, West Virginia. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Anthony Marra, 700 E. 73rd Street, Cleveland, OH 44103; (440) 804–6627; email—Anthony@marrainc.com. i. FERC Contact: Monir Chowdhury at (202) 502–6736; or email at monir.chowdhury@ferc.gov. j. Mahoning Hydropower, LLC filed its request to use the Traditional Licensing Process on January 2, 2014, and provided public notice of its request on January 3, 2014. In a letter dated March 5, 2014, the Director of the Division of Hydropower Licensing approved Mahoning Hydropower, LLC’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) the U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and (b) the West Virginia State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. VerDate Mar<15>2010 17:51 Mar 11, 2014 Jkt 232001 l. Mahoning Hydropower, LLC filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. m. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. n. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: March 5, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–05309 Filed 3–11–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM01–8–000; RM10–12–000; RM12–3–000] Filing Requirements for El. Utility S.A.; Electricity Market Transparency Provisions of Section 220 of the Federal Power Act; Revisions to Electric Quarterly Report Filing Process; Order Extending and Setting Deadlines To File Electric Quarterly Reports Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. 1. This order establishes new deadlines for filing the third quarter (Q3) 2013 Electric Quarterly Report (EQR), fourth quarter (Q4) 2013 EQR, and first quarter (Q1) 2014 EQR. On September 21, 2012, the Federal Energy Regulatory Commission (Commission) issued Order No. 768,1 which, among 1 Electricity Market Transparency Provisions of Section 220 of the Federal Power Act, Order No. 768, FERC Stats. & Regs. ¶ 31,336 (2012), order on reh’g, Order No. 768–A, 143 FERC ¶ 61,054 (2013); see also Revised Public Utility Filing Requirements, Order No. 2001, FERC Stats. & Regs. ¶ 31,127, reh’g PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 14031 other things, revised the existing EQR filing requirements to require market participants that are excluded from the Commission’s jurisdiction under section 205 of the Federal Power Act (FPA) 2 and have more than a de minimis market presence to file EQRs with the Commission. The requirement for certain non-public utilities to file EQRs was to be implemented at the same time as the requirement for all EQR filers (both public utilities and non-public utilities) to report the revised EQR data fields adopted in Order No. 768, i.e., beginning with Q3 2013.3 2. On November 12, 2012, the Commission issued Order No. 770,4 which, among other things, revised the Commission’s regulations to change the process for filing EQRs. In Order No. 770, the Commission announced that, due to technology changes that will render the current filing process outmoded, ineffective, and unsustainable, the Commission will discontinue the use of Commissiondistributed software to file an EQR. The Commission reported that, instead, it will adopt a web-based approach to filing EQRs that will allow a public or non-public utility to file an EQR directly through the Commission’s Web site, either through a web interface or by submitting an Extensible Mark-Up Language-formatted file. The Commission stated that the changes to the process for filing EQRs would apply to EQR filings beginning with the Q3 2013 EQR.5 3. On October 10, 2013, the Commission notified all public and nonpublic utilities that they were not to file Q3 2013 EQRs until the web-based approach was available.6 The Commission extended the deadline for public and non-public utilities to file Q3 denied, Order No. 2001–A, 100 FERC ¶ 61,074, reh’g denied, Order No. 2001–B, 100 FERC ¶ 61,342, order directing filing, Order No. 2001–C, 101 FERC ¶ 61,314 (2002), order directing filing, Order No. 2001–D, 102 FERC ¶ 61,334, order refining filing requirements, Order No. 2001–E, 105 FERC ¶ 61,352 (2003), order on clarification, Order No. 2001–F, 106 FERC ¶ 61,060 (2004), order revising filing requirements, Order No. 2001–G, 120 FERC ¶ 61,270, order on reh’g and clarification, Order No. 2001–H, 121 FERC ¶ 61,289 (2007), order revising filing requirements, Order No. 2001–I, FERC Stats. & Regs. ¶ 31,282 (2008). 2 16 U.S.C. ¶ 824d (2012). Order No. 768 refers to market participants that are not public utilities under section 201(f) of the FPA as ‘‘non-public utilities.’’ 3 Order No. 768, FERC Stats. & Regs. ¶ 31,336 at P 4. 4 Revisions to Electric Quarterly Report Filing Process, Order No. 770, FERC Stats. & Regs. ¶ 31,338 (2012). 5 Id. PP 1, 47. 6 Filing Requirements for El. Utility S.A., 145 FERC ¶ 61,031 (2013). E:\FR\FM\12MRN1.SGM 12MRN1

Agencies

[Federal Register Volume 79, Number 48 (Wednesday, March 12, 2014)]
[Notices]
[Pages 14030-14031]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05419]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1250-019]


City of Pasadena Water & Power Department;

    Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing 
Process
    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing.
    b. Project No.: 1250-019.
    c. Date Filed: December 24, 2013.
    d. Submitted By: City of Pasadena Water & Power Department.
    e. Name of Project: Azusa Hydroelectric Project.
    f. Location: On the San Gabriel River, in Los Angeles County, 
California. No federal lands are occupied by the project works or 
located within the project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Arturo Silva, Power Production 
Superintendent, City of Pasadena Water and Power Department, 85 East 
State Street, Pasadena, CA 91105-3418; (626) 744-4568; email_
asilva@cityofpasadena.net.
    i. FERC Contact: Shana Murray at (202) 502-8333; or email at 
shana.murray@ferc.gov.
    j. City of Pasadena Water & Power Department filed its request to 
use the Traditional Licensing Process on December 24, 2013. City of 
Pasadena Water & Power Department provided public notice of its request 
on December 23, 2013. In a letter dated March 6, 2014, the Director of 
the Division of Hydropower Licensing approved City of Pasadena Water & 
Power Department's request to use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 
of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the California State Historic Preservation Officer, 
as required by section 106, National Historical Preservation Act, and 
the implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    l. With this notice, we are designating City of Pasadena Water & 
Power Department as the Commission's non-federal representative for 
carrying out informal consultation pursuant to section 7 of the 
Endangered Species Act and section 305(b) of the Magnuson-Stevens 
Fishery Conservation and Management Act; and consultation pursuant to 
section 106 of the National Historic Preservation Act.
    m. City of Pasadena Water & Power Department filed a Pre-
Application Document (PAD; including a proposed process plan and 
schedule) with the Commission, pursuant to 18 CFR 5.6 of the 
Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 1250. Pursuant to 18 CFR 
16.8, 16.9, and 16.10 each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by December 31, 
2016.

[[Page 14031]]

    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

     Dated: March 6, 2014.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2014-05419 Filed 3-11-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.