Download as PDF Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices Public Agency: County of Oneida and City of Rhinelander, Rhinelander, Wisconsin. Application Number: 14–13–C–00– RHI. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved in this Decision: $47,508. Earliest Charge Effective Date: May 1, 2014. Estimated Charge Expiration Date: December 1, 2014. Class Of Air Carriers Not Required To Collect PFC’S: Part 135 air taxi/ commercial operators filing FAA Form 1800–31 and operating at Rhinelander/ Oneida County Airport (RHI). Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at RHI. Brief Description of Projects Approved for Collection and Use: Design and construction of taxiway. 14101 Aircraft rescue and firefighting facility (design). Environmental assessment—remove obstructions. Design obstruction removal. Mark airfield pavements. Construct aircraft rescue and firefighting building. Design and construct access road. Decision Date: January 22, 2014. FOR FURTHER INFORMATION CONTACT: Nancy Nistler, Minneapolis Airports District Office, (612) 253–4638. AMENDMENTS TO PFC APPROVALS Amendment approved date Amendment no. city, state 11–10–C–01–VLD Valdosta GA .................... 12–14–C–02–YKM Yakima, WA .................... 03–03–C–02–HLN Helena, MT ..................... 08–02–C–04–PIE Clearwater, FL .................. 09–08–C–01–HDN Hayden, CO .................... 03–06–C–01–FAR Fargo, ND ....................... 04–06–C–02–PSC Pasco, WA ...................... 09–01–C–02–CHS Charleston, SC ............... 12–19–C–01–COS Colorado Springs, CO .... 13–08–C–01–LBB Lubbock, TX .................... Amended approved net PCF revenue Original approved net PCF revenue 12/17/13 01/06/14 01/10/14 01/15/14 01/16/14 01/16/14 01/16/14 01/22/14 01/23/14 01/27/14 $472,800 907,615 2,938,178 10,528,075 1,691,312 12,469,848 8,599,230 14,833,920 728,878 6,859,912 $517,379 1,041,984 3,383,375 17,685,075 696,252 10,197,865 5,545,404 14,415,631 633,878 6,859,912 Issued in Washington, DC, on March 6, 2014. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. Omnibus Budget Reconciliation Act of 1990) (Pub. L. 101–508) and Part 158 of the Federal Aviation Regulations (14 CFR Part 158). This notice is published pursuant to paragraph d of § 158.29. [FR Doc. 2014–05358 Filed 3–11–14; 8:45 am] PFC Applications Approved BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals Federal Aviation Administration (FAA), DOT. ACTION: Monthly Notice of PFC Approvals and Disapprovals. In December 2013, there were three applications approved. This notice also includes information on eight applications, two approved in November 2012, one approved in August 2013, and five approved in November 2013, inadvertently left off the November 2012, August 2013, and November 2013 notices, respectively. Additionally, four approved amendments to previously approved applications are listed. tkelley on DSK3SPTVN1PROD with NOTICES AGENCY: The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of 1990 (Title IX of the SUMMARY: VerDate Mar<15>2010 17:51 Mar 11, 2014 Jkt 232001 PUBLIC AGENCY: City of Chicago Department of Aviation, Chicago, Illinois. APPLICATION NUMBER: 13–26–C– 00–ORD. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $2,484,000. EARLIEST CHARGE EFFECTIVE DATE: November 1, 2038. ESTIMATED CHARGE EXPIRATION DATE: December 1, 2038. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: Air taxi. DETERMINATION: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Chicago O’Hare International Airport. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AND USE: O’Hare School sound insulation program—noise abatement modifications, St. Tarcissus School. DECISION DATE: November 2, 2012. PO 00000 Frm 00125 Fmt 4703 Sfmt 4703 Original estimated charge exp. date 01/01/14 03/01/15 10/01/12 08/01/14 05/01/15 05/01/17 04/01/16 06/01/13 06/01/14 05/01/20 Amended estimated charge exp. date 01/01/14 01/01/16 03/01/15 06/01/17 09/01/13 04/01/12 09/01/09 05/01/13 11/01/15 05/01/20 FOR FURTHER INFORMATION CONTACT: Amy Hanson, Chicago Airports District Office, (847) 294–7354. PUBLIC AGENCY: City of Atlanta Department of Aviation, Atlanta, Georgia. APPLICATION NUMBER: 12–14–C– 00–ATL. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $24,355,000. EARLIEST CHARGE EFFECTIVE DATE: October 1, 2023. ESTIMATED CHARGE EXPIRATION DATE: December 1, 2023. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: Air taxi/commercial operators when enplaning revenue passengers in limited, irregular, special service air taxi/commercial operations such as air ambulance services, student instruction, and non-stop sightseeing flights, that begin and end at the airport and are concluded within a 25-mile radius of the airport. DETERMINATION: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Hartsfield—Jackson Atlanta International Airport. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND E:\FR\FM\12MRN1.SGM 12MRN1 tkelley on DSK3SPTVN1PROD with NOTICES 14102 Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices USE AT A $4.50 PFC LEVEL: North deicing facility. Runway 10/28 bridge and taxiway SG bridge deck visual enhancements. DECISION DATE: November 29, 2012. FOR FURTHER INFORMATION CONTACT: Scott Seritt, Atlanta Airports District Office, (404) 305–7150. PUBLIC AGENCY: Broward County Aviation Department, Dania Beach, Florida. APPLICATION NUMBER: 13–13–C– 00–FLL. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $50,899,175. EARLIEST CHARGE EFFECTIVE DATE: February 1, 2031. ESTIMATED CHARGE EXPIRATION DATE: February 1, 2032. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: Nonscheduled/on-demand air carriers. DETERMINATION: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Fort Lauderdale/Hollywood International Airport. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE AT A $3.00 PFC LEVEL: Loading bridges, phase II. Rehabilitation of runway 9L/27R (design only). Aircraft rescue and firefighting truck 210 replacement. Disabled passenger lift replacement. BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND USE AT A $4.50 PFC LEVEL: In-line explosives detection system baggage system. DETERMINATION: Partially approved for collection and use. In accordance with § 158.15(b)(6), the duty free concession storage area in Terminal 2 is not PFC eligible. Further, in accordance with § 158.15(b)(2), the air carrier operations space is not PFC eligible. However, according to the PFC application, the costs of these relocations are not included in the PFC amount requested for this project so the PFC amount of the project is not being reduced as a result of the ineligible areas. In addition, the FAA found a mathematical error in the estimate for the baggage system in Terminal 4 and is reducing the approved PFC amount accordingly. BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND USE AT A $3.00 VerDate Mar<15>2010 17:51 Mar 11, 2014 Jkt 232001 PFC LEVEL: Hardstand operation equipment. DETERMINATION: Partially approved for collection and use. In accordance with § 158.15(b)(2), the air stair component is not PFC eligible. BRIEF DESCRIPTION OF WITHDRAWN PROJECT: Noise monitors. DATE OF WITHDRAWAL: August 16, 2013. DECISION DATE: August 26, 2013. FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District Office, (407) 812–6331 PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii. APPLICATION NUMBER: 13–05–C– 00–HNL. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $301,094,938. EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014. ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HONOLULU INTERNATIONAL AIRPORT (HNL) AND USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement rehabilitation. Runway 04R/22L pavement rehabilitation. Install runway 04L/22R lighting system. Loading bridge replacement— Overseas Terminal. Construct new Mauka concourse. Aircraft parking apron—Mauka concourse. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements—Overseas Terminal. Shuttle bus stations between gates 6 and 62—terminal improvements. Roof canopy replacement—Overseas Terminal. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND USE AT HILO INTERNATIONAL AIRPORT (ITO) AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND USE AT KONA INTERNATIONAL AT KEAHOLE AIRPORT (KOA) AT A $4.50 PFC PO 00000 Frm 00126 Fmt 4703 Sfmt 4703 LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT HNL FOR FUTURE USE AT KAHULUI AIRPORT (OGG) AT A $3.00 PFC LEVEL: Land acquisition. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT HNL AND USE AT HNL, ITO, KOA, OGG, AND LIHUE AIRPORT (LIH) AT A $3.00 PFC LEVEL: PFC administrative costs. BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural improvements at HNL. Runway 08L/26R widening at HNL. DATE OF WITHDRAWAL: July 19, 2013/ DECISION DATE: November 22, 2013. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii. APPLICATION NUMBER: 13–05–C– 00–OGG. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $85,385,132. EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014. ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement rehabilitation. Runway 04R/22L pavement rehabilitation. Install runway 04L/22R lighting system. Loading bridge replacement— Overseas Terminal. Construct new Mauka concourse. Aircraft parking apron—Mauka concourse. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements—Overseas Terminal. Shuttle bus stations between gates 6 and 62—terminal improvements. Roof canopy replacement—Overseas Terminal. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. E:\FR\FM\12MRN1.SGM 12MRN1 tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT OGG FOR FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT OGG AND USE AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative costs. BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural improvements at HNL. Runway 08L/26R widening at HNL. DATE OF WITHDRAWAL: July 19, 2013/ DECISION DATE: November 22, 2013. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii. APPLICATION NUMBER: 13–05–C– 00–KOA. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $26,963,726. EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014. ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement rehabilitation. Runway 04R/22L pavement rehabilitation. Install runway 04L/22R lighting system. Loading bridge replacement— Overseas Terminal. Construct new Mauka concourse. Aircraft parking apron—Mauka concourse. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements—Overseas Terminal. Shuttle bus stations between gates 6 and 62—terminal improvements. Roof canopy replacement—Overseas Terminal. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT VerDate Mar<15>2010 17:51 Mar 11, 2014 Jkt 232001 KOA AND USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT KOA FOR FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT KOA AND USE AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative costs. BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural improvements at HNL. Runway 08L/26R widening at HNL. DATE OF WITHDRAWAL: July 19, 2013/ DECISION DATE: November 22, 2013. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii. APPLICATION NUMBER: 13–05–C– 00–LIH. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $17,975,817. EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014. ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement rehabilitation. Runway 04R/22L pavement rehabilitation. Install runway 04L/22R lighting system. Loading bridge replacement— Overseas Terminal. Construct new Mauka concourse. Aircraft parking apron—Mauka concourse. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements—Overseas Terminal. Shuttle bus stations between gates 6 and 62—terminal improvements. Roof canopy replacement—Overseas Terminal. PO 00000 Frm 00127 Fmt 4703 Sfmt 4703 14103 BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT LIH FOR FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT LIH AND USE AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative costs. BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural improvements at HNL. Runway 08L/26R widening at HNL. DATE OF WITHDRAWAL: July 19, 2013/ DECISION DATE: November 22, 2013. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii. APPLICATION NUMBER: 13–03–C– 00–ITO. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $17,975,817. EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014. ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement rehabilitation. Runway 04R/22L pavement rehabilitation. Install runway 04L/22R lighting system. Loading bridge replacement— Overseas Terminal. Construct new Mauka concourse. Aircraft parking apron—Mauka concourse. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements—Overseas Terminal. Shuttle bus stations between gates 6 and 62—terminal improvements. E:\FR\FM\12MRN1.SGM 12MRN1 14104 Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices Roof canopy replacement—Overseas Terminal. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and firefighting facility. Install access control and closed circuit television. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT ITO FOR FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition. BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT ITO AND USE AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative costs. BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural improvements at HNL. Runway 08L/26R widening at HNL. DATE OF WITHDRAWAL: July 19, 2013/ DECISION DATE: November 22, 2013. FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District Office, (808) 541–1225. PUBLIC AGENCY: Monterey Peninsula Airport District, Monterey, California. APPLICATION NUMBER: 14–19–C– 00–MRY. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $925,000. EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014. ESTIMATED CHARGE EXPIRATION DATE: May 1, 2015. CLASSES OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: (1) Non-scheduled/on-demand air carriers filing FAA Form 1800–31; and (2) commuters or small certificated air carriers filing Department of Transportation (DOT) Form T–100. DETERMINATION: Approved. Based on information contained in the public agency’s application, the FAA has determined that each of the approved classes accounts for less than 1 percent of the total annual enplanements at Monterey Peninsula Airport. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: Acquire one standard police vehicle—security improvement. Improve runway safety area, runway 10R/28L—phase 4. DECISION DATE: December 3, 2013. FOR FURTHER INFORMATION CONTACT: Neil Kumar, San Francisco Airports District Office, (650) 827–7627. PUBLIC AGENCY: Jackson County Airport Authority, Medford, Oregon. APPLICATION NUMBER: 14–11–C– 00–MFR. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $1,082,418. EARLIEST CHARGE EFFECTIVE DATE: September 1, 2025. ESTIMATED CHARGE EXPIRATION DATE: August 1, 2026. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: Air taxi/commercial operators when enplaning revenue passengers in limited, irregular, special service air taxi/commercial operations such as air ambulance services, student instruction, and non-stop sightseeing flights, that begin and end at the airport and are concluded within a 25-mile radius of the airport. DETERMINATION: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Rogue Valley International—Medford Airport. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: Rehabilitate taxiway C design. Rehabilitate taxiway B/C construction. Snow removal equipment (rotary plow). Rehabilitate taxilanes. Rehabilitate runway 14/32. Relocate perimeter fencing. PFC administration. DECISION DATE: December 10, 2013. FOR FURTHER INFORMATION CONTACT: Trang Tran, Seattle Airports District Office, (425) 227–1662. PUBLIC AGENCY: County of Delta, Escanaba, Michigan. APPLICATION NUMBER: 14–09–C– 00–ESC. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $134,671. EARLIEST CHARGE EFFECTIVE DATE: April 1, 2014. ESTIMATED CHARGE EXPIRATION DATE: November 1, 2016. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: Airport layout plan update. Runway 9/27 rehabilitation. Environmental study. Westland mitigation. Acquire easements. Obstruction removal. Construct taxiway lighting. Install supplemental wind cone. Design and construct snow removal equipment building. Design and construct perimeter fence. Rehabilitate taxiways. Rehabilitate runway 18/36. Runway safety improvements, runway 18/36. Apron rehabilitation. Taxiway B widening and taxiway C rehabilitation. DECISION DATE: December 19, 2013. FOR FURTHER INFORMATION CONTACT: Irene Porter, Detroit Airports District Office, (734) 229–2915. AMENDMENTS TO PFC APPROVALS Amendment approved date tkelley on DSK3SPTVN1PROD with NOTICES Amendment No. city, state 10–08–C–02–GCC Gillette, WY .......................................... 10–04–C–01–CEC Crescent City, CA ................................. 07–04–C–01–RAP Rapid City, SD ...................................... 07–05–C–01–LAWTON, OK ................................................ VerDate Mar<15>2010 17:51 Mar 11, 2014 Jkt 232001 PO 00000 Frm 00128 12/3/13 12/4/13 12/4/13 12/17/13 Fmt 4703 Original approved net PFC revenue $813,164 $96,221 $1,401,088 $357,888 Sfmt 4703 Amended approved net PFC revenue $793,843 $75,221 $728,665 $566,166 E:\FR\FM\12MRN1.SGM 12MRN1 Original estimated charge exp. date 11/01/14 07/01/18 09/01/08 04/01/09 Amended estimated charge exp. date 01/01/14 10/01/14 02/01/08 04/01/09 Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices Issued in Washington, DC, on March 6, 2014. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. 2014–05350 Filed 3–11–14; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Highway Administration Connected Vehicle Pilot Deployment Program; Request for Information Federal Highway Administration (FHWA), Department of Transportation (DOT). ACTION: Notice. AGENCY: This notice is a Request for Information (RFI) and comments that will be used to help refine the plans for one or more pilot deployments, which combines connected vehicle and mobile device technologies innovations to improve traveler mobility and system productivity, while reducing environmental impacts and enhancing safety. The FHWA anticipates a procurement action for one or more pilot deployment concepts in 2015. The FHWA is issuing this RFI in collaboration with, and on behalf of, other agencies within the DOT, specifically the Federal Transit Administration, the Federal Motor Carrier Safety Administration, National Highway Traffic Safety Administration (NHTSA), and the Office of the Assistant Secretary for Research and Technology. Feedback and comments on any aspect of the RFI are welcome from all interested public, private, and academic entities. While all feedback is welcome, DOT is particularly interested in feedback on the questions provided in the last section of this RFI. DATES: Responses to this RFI should be submitted by 11:59 p.m., e.t., on April 11, 2014. ADDRESSES: Responses to this RFI should be delivered electronically as an email or attachment to an email sent to CVPilots@dot.gov. FOR FURTHER INFORMATION CONTACT: For questions about the program discussed herein, contact Katherine Hartman, CV Pilots Program Lead, ITS Joint Program Office, 202–366–2742, kate.hartman@ dot.gov. For legal questions, interpretations and counsel, please contact Adam Sleeter, Office of the Chief Counsel, 202–366–8839, adam.sleeter@dot.gov, 1200 New Jersey Avenue SE., Washington, DC 20590. Office hours for the FHWA are from tkelley on DSK3SPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 17:51 Mar 11, 2014 Jkt 232001 8:00 a.m. to 4:30 p.m., e.t., Monday through Friday, except Federal holidays. SUPPLEMENTARY INFORMATION: Background Based on the successful results of the connected vehicle research program, and the recent decision by NHTSA to pursue vehicle to vehicle communications safety technology for light vehicles, a robust connected vehicle pilots program is envisioned as a mechanism to spur the implementation of connected vehicle technology. These pilots will serve as initial implementations of connected vehicle technology deployed in real world settings with the aim of delivering near-term safety, mobility, and environmental benefits to the public. The DOT connected vehicle research program is a multimodal initiative that aims to enable safe, interoperable networked wireless communications among vehicles, infrastructure, and personal communications devices. Connected vehicle research is sponsored by the DOT and others to leverage the potentially transformative capabilities of wireless technology to make surface transportation safer, smarter, and greener. Research has resulted in a considerable body of work supporting pilot deployments, including concepts of operations and prototyping for more than two dozen applications. Concurrent Federal research efforts developed critical cross-cutting technologies and other enabling capabilities required to integrate and deploy applications. Descriptions of the following relevant research products, developed by the component connected vehicle research programs, can be found at the locations provided in footnotes: • Dynamic Mobility Applications Program.1 • Real-Time Data Capture and Management Program.2 • Applications for the Environment: Real-Time Information (AERIS) Program.3 • Road-Weather Management Program.4 • Safety Pilot Model Deployment.5 • Vehicle-to-Infrastructure (V2I) Safety Program.6 • Vehicle-to-Vehicle (V2V) Safety Program.7 1 https://www.its.dot.gov/dma/. 2 https://www.its.dot.gov/data_capture/data_ capture.htm. 3 https://www.its.dot.gov/aeris/. 4 https://www.its.dot.gov/connected_vehicle/road_ weather.htm. 5 https://www.its.dot.gov/safety_pilot/. 6 https://www.its.dot.gov/research/v2i.htm. 7 https://www.its.dot.gov/research/v2v.htm. PO 00000 Frm 00129 Fmt 4703 Sfmt 4703 14105 These programs seek to identify, develop, and deploy applications that leverage the full potential of trusted communications among connected vehicles, travelers, and infrastructure to better inform travelers, enhance current operational practices, and transform surface transportation systems management. In 2012–2013, the connected vehicle research program conducted the Safety Pilot Model Deployment in Ann Arbor, Michigan, to assess the potential of V2V and other safety applications to reduce crashes and improve roadway system safety. Building on the collective body of connected vehicle research work, the Connected Vehicle Pilot Deployment Program seeks preliminary operational deployments of connected vehicle applications that synergistically capture and utilize new forms of connected vehicle and mobile device data to improve multimodal surface transportation system performance and enable enhanced performance-based systems management. The applications developed as connected vehicle applications include support for improved decisionmaking by both system users (travelers) and system managers. The intent is to deploy sitetailored collections of applications that address specific local needs while laying a foundation for broader regional and national deployment. Pilot deployment sites selected in this effort will focus on combinations of applications that result in improved and measureable system performance in one or more of the following areas: • System Productivity. • Mobility, including impact on freight movements. • Livability/Accessibility (accessibility is defined as the ability to reach goods, services, and activities). • Environment/Fuel Use. • Traveler/System Safety, including advising of potentially unsafe conditions and mitigating the impact of events that may cause vehicle crashes. Purpose of the Notice The DOT seeks comments and innovative ideas from the public sector, private sector, and academic communities concerning the pilot program described in this RFI. While comments are welcome on any area of the RFI, the DOT is particularly interested in responses to the questions listed at the end of this RFI. Connected Vehicle Pilot Deployment Program Description This Connected Vehicle Pilot Deployment Program envisions multiple pilot deployments with an initial wave E:\FR\FM\12MRN1.SGM 12MRN1

Agencies

[Federal Register Volume 79, Number 48 (Wednesday, March 12, 2014)]
[Notices]
[Pages 14101-14105]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05350]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Notice of Passenger Facility Charge (PFC) Approvals and 
Disapprovals

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Monthly Notice of PFC Approvals and Disapprovals. In December 
2013, there were three applications approved. This notice also includes 
information on eight applications, two approved in November 2012, one 
approved in August 2013, and five approved in November 2013, 
inadvertently left off the November 2012, August 2013, and November 
2013 notices, respectively. Additionally, four approved amendments to 
previously approved applications are listed.

-----------------------------------------------------------------------

SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
approvals and disapprovals under the provisions of the Aviation Safety 
and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget 
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the 
Federal Aviation Regulations (14 CFR Part 158). This notice is 
published pursuant to paragraph d of Sec.  158.29.

PFC Applications Approved

    PUBLIC AGENCY: City of Chicago Department of Aviation, Chicago, 
Illinois.
    APPLICATION NUMBER: 13-26-C-00-ORD.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $2,484,000.
    EARLIEST CHARGE EFFECTIVE DATE: November 1, 2038.
    ESTIMATED CHARGE EXPIRATION DATE: December 1, 2038.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi.
    DETERMINATION: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Chicago O'Hare International Airport.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AND USE: 
O'Hare School sound insulation program--noise abatement modifications, 
St. Tarcissus School.
    DECISION DATE: November 2, 2012.

FOR FURTHER INFORMATION CONTACT: Amy Hanson, Chicago Airports District 
Office, (847) 294-7354.
    PUBLIC AGENCY: City of Atlanta Department of Aviation, Atlanta, 
Georgia.
    APPLICATION NUMBER: 12-14-C-00-ATL.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $24,355,000.
    EARLIEST CHARGE EFFECTIVE DATE: October 1, 2023.
    ESTIMATED CHARGE EXPIRATION DATE: December 1, 2023.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi/
commercial operators when enplaning revenue passengers in limited, 
irregular, special service air taxi/commercial operations such as air 
ambulance services, student instruction, and non-stop sightseeing 
flights, that begin and end at the airport and are concluded within a 
25-mile radius of the airport.
    DETERMINATION: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Hartsfield--Jackson Atlanta International Airport.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND

[[Page 14102]]

USE AT A $4.50 PFC LEVEL: North deicing facility. Runway 10/28 bridge 
and taxiway SG bridge deck visual enhancements.
    DECISION DATE: November 29, 2012.

FOR FURTHER INFORMATION CONTACT: Scott Seritt, Atlanta Airports 
District Office, (404) 305-7150.
    PUBLIC AGENCY: Broward County Aviation Department, Dania Beach, 
Florida.
    APPLICATION NUMBER: 13-13-C-00-FLL.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $50,899,175.
    EARLIEST CHARGE EFFECTIVE DATE: February 1, 2031.
    ESTIMATED CHARGE EXPIRATION DATE: February 1, 2032.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Non-scheduled/
on-demand air carriers.
    DETERMINATION: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Fort Lauderdale/Hollywood International Airport.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE AT A 
$3.00 PFC LEVEL:
    Loading bridges, phase II.
    Rehabilitation of runway 9L/27R (design only).
    Aircraft rescue and firefighting truck 210 replacement.
    Disabled passenger lift replacement.
    BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND 
USE AT A $4.50 PFC LEVEL: In-line explosives detection system baggage 
system.
    DETERMINATION: Partially approved for collection and use. In 
accordance with Sec.  158.15(b)(6), the duty free concession storage 
area in Terminal 2 is not PFC eligible. Further, in accordance with 
Sec.  158.15(b)(2), the air carrier operations space is not PFC 
eligible. However, according to the PFC application, the costs of these 
relocations are not included in the PFC amount requested for this 
project so the PFC amount of the project is not being reduced as a 
result of the ineligible areas. In addition, the FAA found a 
mathematical error in the estimate for the baggage system in Terminal 4 
and is reducing the approved PFC amount accordingly.
    BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND 
USE AT A $3.00 PFC LEVEL: Hardstand operation equipment.
    DETERMINATION: Partially approved for collection and use. In 
accordance with Sec.  158.15(b)(2), the air stair component is not PFC 
eligible.
    BRIEF DESCRIPTION OF WITHDRAWN PROJECT: Noise monitors.
    DATE OF WITHDRAWAL: August 16, 2013.
    DECISION DATE: August 26, 2013.

FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District 
Office, (407) 812-6331
    PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
    APPLICATION NUMBER: 13-05-C-00-HNL.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $301,094,938.
    EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
    ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HONOLULU 
INTERNATIONAL AIRPORT (HNL) AND USE AT HNL AT A $4.50 PFC LEVEL: Runway 
08R/26L pavement rehabilitation.
    Runway 04R/22L pavement rehabilitation.
    Install runway 04L/22R lighting system.
    Loading bridge replacement--Overseas Terminal.
    Construct new Mauka concourse.
    Aircraft parking apron--Mauka concourse.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND 
USE AT HNL AT A $3.00 PFC LEVEL:
    Second level roadway improvements--Overseas Terminal.
    Shuttle bus stations between gates 6 and 62--terminal improvements.
    Roof canopy replacement--Overseas Terminal.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND 
USE AT HILO INTERNATIONAL AIRPORT (ITO) AT A $4.50 PFC LEVEL: Construct 
aircraft rescue and firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND 
USE AT KONA INTERNATIONAL AT KEAHOLE AIRPORT (KOA) AT A $4.50 PFC 
LEVEL: Construct aircraft rescue and firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT HNL FOR 
FUTURE USE AT KAHULUI AIRPORT (OGG) AT A $3.00 PFC LEVEL: Land 
acquisition.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT HNL AND USE 
AT HNL, ITO, KOA, OGG, AND LIHUE AIRPORT (LIH) AT A $3.00 PFC LEVEL: 
PFC administrative costs.
    BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural 
improvements at HNL.
    Runway 08L/26R widening at HNL.
    DATE OF WITHDRAWAL: July 19, 2013/
    DECISION DATE: November 22, 2013.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.
    PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
    APPLICATION NUMBER: 13-05-C-00-OGG.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $85,385,132.
    EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
    ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND 
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement 
rehabilitation.
    Runway 04R/22L pavement rehabilitation.
    Install runway 04L/22R lighting system.
    Loading bridge replacement--Overseas Terminal.
    Construct new Mauka concourse.
    Aircraft parking apron--Mauka concourse.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND 
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
    Shuttle bus stations between gates 6 and 62--terminal improvements.
    Roof canopy replacement--Overseas Terminal.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND 
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.

[[Page 14103]]

    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND 
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT OGG FOR 
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT OGG AND USE 
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative 
costs.
    BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural 
improvements at HNL.
    Runway 08L/26R widening at HNL.
    DATE OF WITHDRAWAL: July 19, 2013/
    DECISION DATE: November 22, 2013.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.
    PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
    APPLICATION NUMBER: 13-05-C-00-KOA.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $26,963,726.
    EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
    ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND 
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement 
rehabilitation.
    Runway 04R/22L pavement rehabilitation.
    Install runway 04L/22R lighting system.
    Loading bridge replacement--Overseas Terminal.
    Construct new Mauka concourse.
    Aircraft parking apron--Mauka concourse.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND 
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
    Shuttle bus stations between gates 6 and 62--terminal improvements.
    Roof canopy replacement--Overseas Terminal.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND 
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND 
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT KOA FOR 
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT KOA AND USE 
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative 
costs.
    BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural 
improvements at HNL.
    Runway 08L/26R widening at HNL.
    DATE OF WITHDRAWAL: July 19, 2013/
    DECISION DATE: November 22, 2013.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.
    PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
    APPLICATION NUMBER: 13-05-C-00-LIH.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $17,975,817.
    EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
    ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND 
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement 
rehabilitation.
    Runway 04R/22L pavement rehabilitation.
    Install runway 04L/22R lighting system.
    Loading bridge replacement--Overseas Terminal.
    Construct new Mauka concourse.
    Aircraft parking apron--Mauka concourse.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND 
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
    Shuttle bus stations between gates 6 and 62--terminal improvements.
    Roof canopy replacement--Overseas Terminal.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND 
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND 
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT LIH FOR 
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT LIH AND USE 
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative 
costs.
    BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural 
improvements at HNL.
    Runway 08L/26R widening at HNL.
    DATE OF WITHDRAWAL: July 19, 2013/
    DECISION DATE: November 22, 2013.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.
    PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
    APPLICATION NUMBER: 13-03-C-00-ITO.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $17,975,817.
    EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
    ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND 
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement 
rehabilitation.
    Runway 04R/22L pavement rehabilitation.
    Install runway 04L/22R lighting system.
    Loading bridge replacement--Overseas Terminal.
    Construct new Mauka concourse.
    Aircraft parking apron--Mauka concourse.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND 
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
    Shuttle bus stations between gates 6 and 62--terminal improvements.

[[Page 14104]]

    Roof canopy replacement--Overseas Terminal.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND 
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND 
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and 
firefighting facility.
    Install access control and closed circuit television.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT ITO FOR 
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
    BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT ITO AND USE 
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative 
costs.
    BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural 
improvements at HNL.
    Runway 08L/26R widening at HNL.
    DATE OF WITHDRAWAL: July 19, 2013/
    DECISION DATE: November 22, 2013.

FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District 
Office, (808) 541-1225.
    PUBLIC AGENCY: Monterey Peninsula Airport District, Monterey, 
California.
    APPLICATION NUMBER: 14-19-C-00-MRY.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $925,000.
    EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
    ESTIMATED CHARGE EXPIRATION DATE: May 1, 2015.
    CLASSES OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S:
    (1) Non-scheduled/on-demand air carriers filing FAA Form 1800-31; 
and (2) commuters or small certificated air carriers filing Department 
of Transportation (DOT) Form T-100.
    DETERMINATION: Approved. Based on information contained in the 
public agency's application, the FAA has determined that each of the 
approved classes accounts for less than 1 percent of the total annual 
enplanements at Monterey Peninsula Airport.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: 
Acquire one standard police vehicle--security improvement.
    Improve runway safety area, runway 10R/28L--phase 4.
    DECISION DATE: December 3, 2013.

FOR FURTHER INFORMATION CONTACT: Neil Kumar, San Francisco Airports 
District Office, (650) 827-7627.
    PUBLIC AGENCY: Jackson County Airport Authority, Medford, Oregon.
    APPLICATION NUMBER: 14-11-C-00-MFR.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $1,082,418.
    EARLIEST CHARGE EFFECTIVE DATE: September 1, 2025.
    ESTIMATED CHARGE EXPIRATION DATE: August 1, 2026.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi/
commercial operators when enplaning revenue passengers in limited, 
irregular, special service air taxi/commercial operations such as air 
ambulance services, student instruction, and non-stop sightseeing 
flights, that begin and end at the airport and are concluded within a 
25-mile radius of the airport.
    DETERMINATION: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Rogue Valley International--Medford Airport.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
    Rehabilitate taxiway C design.
    Rehabilitate taxiway B/C construction.
    Snow removal equipment (rotary plow).
    Rehabilitate taxilanes.
    Rehabilitate runway 14/32.
    Relocate perimeter fencing.
    PFC administration.
    DECISION DATE: December 10, 2013.

FOR FURTHER INFORMATION CONTACT: Trang Tran, Seattle Airports District 
Office, (425) 227-1662.
    PUBLIC AGENCY: County of Delta, Escanaba, Michigan.
    APPLICATION NUMBER: 14-09-C-00-ESC.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $134,671.
    EARLIEST CHARGE EFFECTIVE DATE: April 1, 2014.
    ESTIMATED CHARGE EXPIRATION DATE: November 1, 2016.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: 
Airport layout plan update.
    Runway 9/27 rehabilitation.
    Environmental study.
    Westland mitigation.
    Acquire easements.
    Obstruction removal.
    Construct taxiway lighting.
    Install supplemental wind cone.
    Design and construct snow removal equipment building.
    Design and construct perimeter fence.
    Rehabilitate taxiways.
    Rehabilitate runway 18/36.
    Runway safety improvements, runway 18/36.
    Apron rehabilitation.
    Taxiway B widening and taxiway C rehabilitation.
    DECISION DATE: December 19, 2013.

FOR FURTHER INFORMATION CONTACT: Irene Porter, Detroit Airports 
District Office, (734) 229-2915.

                                           Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
                                                                                     Original         Amended
                                     Amendment       Original         Amended        estimated       estimated
    Amendment No. city, state      approved date   approved net    approved net     charge exp.     charge exp.
                                                    PFC revenue     PFC revenue        date            date
----------------------------------------------------------------------------------------------------------------
10-08-C-02-GCC Gillette, WY.....         12/3/13        $813,164        $793,843        11/01/14        01/01/14
10-04-C-01-CEC Crescent City, CA         12/4/13         $96,221         $75,221        07/01/18        10/01/14
07-04-C-01-RAP Rapid City, SD...         12/4/13      $1,401,088        $728,665        09/01/08        02/01/08
07-05-C-01-LAWTON, OK...........        12/17/13        $357,888        $566,166        04/01/09        04/01/09
----------------------------------------------------------------------------------------------------------------



[[Page 14105]]

    Issued in Washington, DC, on March 6, 2014.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 2014-05350 Filed 3-11-14; 8:45 am]
BILLING CODE 4910-13-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.