Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals, 14101-14105 [2014-05350]
Download as PDF
Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices
Public Agency: County of Oneida and
City of Rhinelander, Rhinelander,
Wisconsin.
Application Number: 14–13–C–00–
RHI.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in this
Decision: $47,508.
Earliest Charge Effective Date: May 1,
2014.
Estimated Charge Expiration Date:
December 1, 2014.
Class Of Air Carriers Not Required To
Collect PFC’S: Part 135 air taxi/
commercial operators filing FAA Form
1800–31 and operating at Rhinelander/
Oneida County Airport (RHI).
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the approved class
accounts for less than 1 percent of the
total annual enplanements at RHI.
Brief Description of Projects
Approved for Collection and Use:
Design and construction of taxiway.
14101
Aircraft rescue and firefighting facility
(design).
Environmental assessment—remove
obstructions.
Design obstruction removal.
Mark airfield pavements.
Construct aircraft rescue and
firefighting building.
Design and construct access road.
Decision Date: January 22, 2014.
FOR FURTHER INFORMATION CONTACT:
Nancy Nistler, Minneapolis Airports
District Office, (612) 253–4638.
AMENDMENTS TO PFC APPROVALS
Amendment
approved date
Amendment no. city, state
11–10–C–01–VLD Valdosta GA ....................
12–14–C–02–YKM Yakima, WA ....................
03–03–C–02–HLN Helena, MT .....................
08–02–C–04–PIE Clearwater, FL ..................
09–08–C–01–HDN Hayden, CO ....................
03–06–C–01–FAR Fargo, ND .......................
04–06–C–02–PSC Pasco, WA ......................
09–01–C–02–CHS Charleston, SC ...............
12–19–C–01–COS Colorado Springs, CO ....
13–08–C–01–LBB Lubbock, TX ....................
Amended
approved net
PCF revenue
Original approved
net PCF revenue
12/17/13
01/06/14
01/10/14
01/15/14
01/16/14
01/16/14
01/16/14
01/22/14
01/23/14
01/27/14
$472,800
907,615
2,938,178
10,528,075
1,691,312
12,469,848
8,599,230
14,833,920
728,878
6,859,912
$517,379
1,041,984
3,383,375
17,685,075
696,252
10,197,865
5,545,404
14,415,631
633,878
6,859,912
Issued in Washington, DC, on March 6,
2014.
Joe Hebert,
Manager, Financial Analysis and Passenger
Facility Charge Branch.
Omnibus Budget Reconciliation Act of
1990) (Pub. L. 101–508) and Part 158 of
the Federal Aviation Regulations (14
CFR Part 158). This notice is published
pursuant to paragraph d of § 158.29.
[FR Doc. 2014–05358 Filed 3–11–14; 8:45 am]
PFC Applications Approved
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge
(PFC) Approvals and Disapprovals
Federal Aviation
Administration (FAA), DOT.
ACTION: Monthly Notice of PFC
Approvals and Disapprovals. In
December 2013, there were three
applications approved. This notice also
includes information on eight
applications, two approved in
November 2012, one approved in
August 2013, and five approved in
November 2013, inadvertently left off
the November 2012, August 2013, and
November 2013 notices, respectively.
Additionally, four approved
amendments to previously approved
applications are listed.
tkelley on DSK3SPTVN1PROD with NOTICES
AGENCY:
The FAA publishes a monthly
notice, as appropriate, of PFC approvals
and disapprovals under the provisions
of the Aviation Safety and Capacity
Expansion Act of 1990 (Title IX of the
SUMMARY:
VerDate Mar<15>2010
17:51 Mar 11, 2014
Jkt 232001
PUBLIC AGENCY: City of Chicago
Department of Aviation, Chicago,
Illinois.
APPLICATION NUMBER: 13–26–C–
00–ORD.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $2,484,000.
EARLIEST CHARGE EFFECTIVE
DATE: November 1, 2038.
ESTIMATED CHARGE EXPIRATION
DATE: December 1, 2038.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the approved class
accounts for less than 1 percent of the
total annual enplanements at Chicago
O’Hare International Airport.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AND
USE: O’Hare School sound insulation
program—noise abatement
modifications, St. Tarcissus School.
DECISION DATE: November 2, 2012.
PO 00000
Frm 00125
Fmt 4703
Sfmt 4703
Original estimated
charge exp. date
01/01/14
03/01/15
10/01/12
08/01/14
05/01/15
05/01/17
04/01/16
06/01/13
06/01/14
05/01/20
Amended
estimated
charge exp. date
01/01/14
01/01/16
03/01/15
06/01/17
09/01/13
04/01/12
09/01/09
05/01/13
11/01/15
05/01/20
FOR FURTHER INFORMATION CONTACT:
Amy Hanson, Chicago Airports District
Office, (847) 294–7354.
PUBLIC AGENCY: City of Atlanta
Department of Aviation, Atlanta,
Georgia.
APPLICATION NUMBER: 12–14–C–
00–ATL.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $24,355,000.
EARLIEST CHARGE EFFECTIVE
DATE: October 1, 2023.
ESTIMATED CHARGE EXPIRATION
DATE: December 1, 2023.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi/commercial operators when
enplaning revenue passengers in
limited, irregular, special service air
taxi/commercial operations such as air
ambulance services, student instruction,
and non-stop sightseeing flights, that
begin and end at the airport and are
concluded within a 25-mile radius of
the airport.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the approved class
accounts for less than 1 percent of the
total annual enplanements at
Hartsfield—Jackson Atlanta
International Airport.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
E:\FR\FM\12MRN1.SGM
12MRN1
tkelley on DSK3SPTVN1PROD with NOTICES
14102
Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices
USE AT A $4.50 PFC LEVEL: North
deicing facility. Runway 10/28 bridge
and taxiway SG bridge deck visual
enhancements.
DECISION DATE: November 29, 2012.
FOR FURTHER INFORMATION CONTACT:
Scott Seritt, Atlanta Airports District
Office, (404) 305–7150.
PUBLIC AGENCY: Broward County
Aviation Department, Dania Beach,
Florida.
APPLICATION NUMBER: 13–13–C–
00–FLL.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $50,899,175.
EARLIEST CHARGE EFFECTIVE
DATE: February 1, 2031.
ESTIMATED CHARGE EXPIRATION
DATE: February 1, 2032.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Nonscheduled/on-demand air carriers.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the approved class
accounts for less than 1 percent of the
total annual enplanements at Fort
Lauderdale/Hollywood International
Airport.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE AT A $3.00 PFC LEVEL:
Loading bridges, phase II.
Rehabilitation of runway 9L/27R
(design only).
Aircraft rescue and firefighting truck
210 replacement.
Disabled passenger lift replacement.
BRIEF DESCRIPTION OF PROJECT
PARTIALLY APPROVED FOR
COLLECTION AND USE AT A $4.50
PFC LEVEL: In-line explosives detection
system baggage system.
DETERMINATION: Partially
approved for collection and use. In
accordance with § 158.15(b)(6), the duty
free concession storage area in Terminal
2 is not PFC eligible. Further, in
accordance with § 158.15(b)(2), the air
carrier operations space is not PFC
eligible. However, according to the PFC
application, the costs of these
relocations are not included in the PFC
amount requested for this project so the
PFC amount of the project is not being
reduced as a result of the ineligible
areas. In addition, the FAA found a
mathematical error in the estimate for
the baggage system in Terminal 4 and is
reducing the approved PFC amount
accordingly.
BRIEF DESCRIPTION OF PROJECT
PARTIALLY APPROVED FOR
COLLECTION AND USE AT A $3.00
VerDate Mar<15>2010
17:51 Mar 11, 2014
Jkt 232001
PFC LEVEL: Hardstand operation
equipment.
DETERMINATION: Partially
approved for collection and use. In
accordance with § 158.15(b)(2), the air
stair component is not PFC eligible.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECT: Noise
monitors.
DATE OF WITHDRAWAL: August 16,
2013.
DECISION DATE: August 26, 2013.
FOR FURTHER INFORMATION CONTACT:
Susan Moore, Orlando Airports District
Office, (407) 812–6331
PUBLIC AGENCY: State of Hawaii,
Honolulu, Hawaii.
APPLICATION NUMBER: 13–05–C–
00–HNL.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $301,094,938.
EARLIEST CHARGE EFFECTIVE
DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
HONOLULU INTERNATIONAL
AIRPORT (HNL) AND USE AT HNL AT
A $4.50 PFC LEVEL: Runway 08R/26L
pavement rehabilitation.
Runway 04R/22L pavement
rehabilitation.
Install runway 04L/22R lighting
system.
Loading bridge replacement—
Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron—Mauka
concourse.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
HNL AND USE AT HNL AT A $3.00
PFC LEVEL:
Second level roadway
improvements—Overseas Terminal.
Shuttle bus stations between gates 6
and 62—terminal improvements.
Roof canopy replacement—Overseas
Terminal.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
HNL AND USE AT HILO
INTERNATIONAL AIRPORT (ITO) AT
A $4.50 PFC LEVEL: Construct aircraft
rescue and firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
HNL AND USE AT KONA
INTERNATIONAL AT KEAHOLE
AIRPORT (KOA) AT A $4.50 PFC
PO 00000
Frm 00126
Fmt 4703
Sfmt 4703
LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT
HNL FOR FUTURE USE AT KAHULUI
AIRPORT (OGG) AT A $3.00 PFC
LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT
HNL AND USE AT HNL, ITO, KOA,
OGG, AND LIHUE AIRPORT (LIH) AT
A $3.00 PFC LEVEL: PFC administrative
costs.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECTS: Taxiway Z
structural improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19,
2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Wong, Honolulu Airports District
Office, (808) 541–1225.
PUBLIC AGENCY: State of Hawaii,
Honolulu, Hawaii.
APPLICATION NUMBER: 13–05–C–
00–OGG.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $85,385,132.
EARLIEST CHARGE EFFECTIVE
DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
OGG AND USE AT HNL AT A $4.50
PFC LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement
rehabilitation.
Install runway 04L/22R lighting
system.
Loading bridge replacement—
Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron—Mauka
concourse.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
OGG AND USE AT HNL AT A $3.00
PFC LEVEL: Second level roadway
improvements—Overseas Terminal.
Shuttle bus stations between gates 6
and 62—terminal improvements.
Roof canopy replacement—Overseas
Terminal.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
OGG AND USE AT ITO AT A $4.50 PFC
LEVEL: Construct aircraft rescue and
firefighting facility.
E:\FR\FM\12MRN1.SGM
12MRN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
OGG AND USE AT KOA AT A $4.50
PFC LEVEL: Construct aircraft rescue
and firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT
OGG FOR FUTURE USE AT OGG AT A
$3.00 PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT
OGG AND USE AT HNL, ITO, KOA,
OGG, AND LIH AT A $3.00 PFC LEVEL:
PFC administrative costs.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECTS: Taxiway Z
structural improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19,
2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Wong, Honolulu Airports District
Office, (808) 541–1225.
PUBLIC AGENCY: State of Hawaii,
Honolulu, Hawaii.
APPLICATION NUMBER: 13–05–C–
00–KOA.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $26,963,726.
EARLIEST CHARGE EFFECTIVE
DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
KOA AND USE AT HNL AT A $4.50
PFC LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement
rehabilitation.
Install runway 04L/22R lighting
system.
Loading bridge replacement—
Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron—Mauka
concourse.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
KOA AND USE AT HNL AT A $3.00
PFC LEVEL: Second level roadway
improvements—Overseas Terminal.
Shuttle bus stations between gates 6
and 62—terminal improvements.
Roof canopy replacement—Overseas
Terminal.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
VerDate Mar<15>2010
17:51 Mar 11, 2014
Jkt 232001
KOA AND USE AT ITO AT A $4.50 PFC
LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT
KOA AND USE AT KOA AT A $4.50
PFC LEVEL: Construct aircraft rescue
and firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT
KOA FOR FUTURE USE AT OGG AT A
$3.00 PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT
KOA AND USE AT HNL, ITO, KOA,
OGG, AND LIH AT A $3.00 PFC LEVEL:
PFC administrative costs.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECTS: Taxiway Z
structural improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19,
2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Wong, Honolulu Airports District
Office, (808) 541–1225.
PUBLIC AGENCY: State of Hawaii,
Honolulu, Hawaii.
APPLICATION NUMBER: 13–05–C–
00–LIH.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $17,975,817.
EARLIEST CHARGE EFFECTIVE
DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT LIH
AND USE AT HNL AT A $4.50 PFC
LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement
rehabilitation.
Install runway 04L/22R lighting
system.
Loading bridge replacement—
Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron—Mauka
concourse.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT LIH
AND USE AT HNL AT A $3.00 PFC
LEVEL: Second level roadway
improvements—Overseas Terminal.
Shuttle bus stations between gates 6
and 62—terminal improvements.
Roof canopy replacement—Overseas
Terminal.
PO 00000
Frm 00127
Fmt 4703
Sfmt 4703
14103
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT LIH
AND USE AT ITO AT A $4.50 PFC
LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT LIH
AND USE AT KOA AT A $4.50 PFC
LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT LIH
FOR FUTURE USE AT OGG AT A $3.00
PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT LIH
AND USE AT HNL, ITO, KOA, OGG,
AND LIH AT A $3.00 PFC LEVEL: PFC
administrative costs.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECTS: Taxiway Z
structural improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19,
2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Wong, Honolulu Airports District
Office, (808) 541–1225.
PUBLIC AGENCY: State of Hawaii,
Honolulu, Hawaii.
APPLICATION NUMBER: 13–03–C–
00–ITO.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $17,975,817.
EARLIEST CHARGE EFFECTIVE
DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT ITO
AND USE AT HNL AT A $4.50 PFC
LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement
rehabilitation.
Install runway 04L/22R lighting
system.
Loading bridge replacement—
Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron—Mauka
concourse.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT ITO
AND USE AT HNL AT A $3.00 PFC
LEVEL: Second level roadway
improvements—Overseas Terminal.
Shuttle bus stations between gates 6
and 62—terminal improvements.
E:\FR\FM\12MRN1.SGM
12MRN1
14104
Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices
Roof canopy replacement—Overseas
Terminal.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT ITO
AND USE AT ITO AT A $4.50 PFC
LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT ITO
AND USE AT KOA AT A $4.50 PFC
LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed
circuit television.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT ITO
FOR FUTURE USE AT OGG AT A $3.00
PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT ITO
AND USE AT HNL, ITO, KOA, OGG,
AND LIH AT A $3.00 PFC LEVEL: PFC
administrative costs.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECTS: Taxiway Z
structural improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19,
2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Wong, Honolulu Airports District
Office, (808) 541–1225.
PUBLIC AGENCY: Monterey
Peninsula Airport District, Monterey,
California.
APPLICATION NUMBER: 14–19–C–
00–MRY.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $925,000.
EARLIEST CHARGE EFFECTIVE
DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: May 1, 2015.
CLASSES OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S:
(1) Non-scheduled/on-demand air
carriers filing FAA Form 1800–31; and
(2) commuters or small certificated air
carriers filing Department of
Transportation (DOT) Form T–100.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that each of the approved
classes accounts for less than 1 percent
of the total annual enplanements at
Monterey Peninsula Airport.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE: Acquire one standard police
vehicle—security improvement.
Improve runway safety area, runway
10R/28L—phase 4.
DECISION DATE: December 3, 2013.
FOR FURTHER INFORMATION CONTACT: Neil
Kumar, San Francisco Airports District
Office, (650) 827–7627.
PUBLIC AGENCY: Jackson County
Airport Authority, Medford, Oregon.
APPLICATION NUMBER: 14–11–C–
00–MFR.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $1,082,418.
EARLIEST CHARGE EFFECTIVE
DATE: September 1, 2025.
ESTIMATED CHARGE EXPIRATION
DATE: August 1, 2026.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi/commercial operators when
enplaning revenue passengers in
limited, irregular, special service air
taxi/commercial operations such as air
ambulance services, student instruction,
and non-stop sightseeing flights, that
begin and end at the airport and are
concluded within a 25-mile radius of
the airport.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the approved class
accounts for less than 1 percent of the
total annual enplanements at Rogue
Valley International—Medford Airport.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE:
Rehabilitate taxiway C design.
Rehabilitate taxiway B/C
construction.
Snow removal equipment (rotary
plow).
Rehabilitate taxilanes.
Rehabilitate runway 14/32.
Relocate perimeter fencing.
PFC administration.
DECISION DATE: December 10, 2013.
FOR FURTHER INFORMATION CONTACT:
Trang Tran, Seattle Airports District
Office, (425) 227–1662.
PUBLIC AGENCY: County of Delta,
Escanaba, Michigan.
APPLICATION NUMBER: 14–09–C–
00–ESC.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $134,671.
EARLIEST CHARGE EFFECTIVE
DATE: April 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: November 1, 2016.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE: Airport layout plan update.
Runway 9/27 rehabilitation.
Environmental study.
Westland mitigation.
Acquire easements.
Obstruction removal.
Construct taxiway lighting.
Install supplemental wind cone.
Design and construct snow removal
equipment building.
Design and construct perimeter fence.
Rehabilitate taxiways.
Rehabilitate runway 18/36.
Runway safety improvements, runway
18/36.
Apron rehabilitation.
Taxiway B widening and taxiway C
rehabilitation.
DECISION DATE: December 19, 2013.
FOR FURTHER INFORMATION CONTACT:
Irene Porter, Detroit Airports District
Office, (734) 229–2915.
AMENDMENTS TO PFC APPROVALS
Amendment
approved date
tkelley on DSK3SPTVN1PROD with NOTICES
Amendment No. city, state
10–08–C–02–GCC Gillette, WY ..........................................
10–04–C–01–CEC Crescent City, CA .................................
07–04–C–01–RAP Rapid City, SD ......................................
07–05–C–01–LAWTON, OK ................................................
VerDate Mar<15>2010
17:51 Mar 11, 2014
Jkt 232001
PO 00000
Frm 00128
12/3/13
12/4/13
12/4/13
12/17/13
Fmt 4703
Original
approved net
PFC revenue
$813,164
$96,221
$1,401,088
$357,888
Sfmt 4703
Amended
approved net
PFC revenue
$793,843
$75,221
$728,665
$566,166
E:\FR\FM\12MRN1.SGM
12MRN1
Original
estimated
charge exp.
date
11/01/14
07/01/18
09/01/08
04/01/09
Amended
estimated
charge exp.
date
01/01/14
10/01/14
02/01/08
04/01/09
Federal Register / Vol. 79, No. 48 / Wednesday, March 12, 2014 / Notices
Issued in Washington, DC, on March 6,
2014.
Joe Hebert,
Manager, Financial Analysis and Passenger
Facility Charge Branch.
[FR Doc. 2014–05350 Filed 3–11–14; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Connected Vehicle Pilot Deployment
Program; Request for Information
Federal Highway
Administration (FHWA), Department of
Transportation (DOT).
ACTION: Notice.
AGENCY:
This notice is a Request for
Information (RFI) and comments that
will be used to help refine the plans for
one or more pilot deployments, which
combines connected vehicle and mobile
device technologies innovations to
improve traveler mobility and system
productivity, while reducing
environmental impacts and enhancing
safety. The FHWA anticipates a
procurement action for one or more
pilot deployment concepts in 2015. The
FHWA is issuing this RFI in
collaboration with, and on behalf of,
other agencies within the DOT,
specifically the Federal Transit
Administration, the Federal Motor
Carrier Safety Administration, National
Highway Traffic Safety Administration
(NHTSA), and the Office of the
Assistant Secretary for Research and
Technology. Feedback and comments
on any aspect of the RFI are welcome
from all interested public, private, and
academic entities. While all feedback is
welcome, DOT is particularly interested
in feedback on the questions provided
in the last section of this RFI.
DATES: Responses to this RFI should be
submitted by 11:59 p.m., e.t., on April
11, 2014.
ADDRESSES: Responses to this RFI
should be delivered electronically as an
email or attachment to an email sent to
CVPilots@dot.gov.
FOR FURTHER INFORMATION CONTACT: For
questions about the program discussed
herein, contact Katherine Hartman, CV
Pilots Program Lead, ITS Joint Program
Office, 202–366–2742, kate.hartman@
dot.gov. For legal questions,
interpretations and counsel, please
contact Adam Sleeter, Office of the
Chief Counsel, 202–366–8839,
adam.sleeter@dot.gov, 1200 New Jersey
Avenue SE., Washington, DC 20590.
Office hours for the FHWA are from
tkelley on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:51 Mar 11, 2014
Jkt 232001
8:00 a.m. to 4:30 p.m., e.t., Monday
through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Background
Based on the successful results of the
connected vehicle research program,
and the recent decision by NHTSA to
pursue vehicle to vehicle
communications safety technology for
light vehicles, a robust connected
vehicle pilots program is envisioned as
a mechanism to spur the
implementation of connected vehicle
technology. These pilots will serve as
initial implementations of connected
vehicle technology deployed in real
world settings with the aim of
delivering near-term safety, mobility,
and environmental benefits to the
public.
The DOT connected vehicle research
program is a multimodal initiative that
aims to enable safe, interoperable
networked wireless communications
among vehicles, infrastructure, and
personal communications devices.
Connected vehicle research is sponsored
by the DOT and others to leverage the
potentially transformative capabilities of
wireless technology to make surface
transportation safer, smarter, and
greener. Research has resulted in a
considerable body of work supporting
pilot deployments, including concepts
of operations and prototyping for more
than two dozen applications.
Concurrent Federal research efforts
developed critical cross-cutting
technologies and other enabling
capabilities required to integrate and
deploy applications. Descriptions of the
following relevant research products,
developed by the component connected
vehicle research programs, can be found
at the locations provided in footnotes:
• Dynamic Mobility Applications
Program.1
• Real-Time Data Capture and
Management Program.2
• Applications for the Environment:
Real-Time Information (AERIS)
Program.3
• Road-Weather Management
Program.4
• Safety Pilot Model Deployment.5
• Vehicle-to-Infrastructure (V2I)
Safety Program.6
• Vehicle-to-Vehicle (V2V) Safety
Program.7
1 https://www.its.dot.gov/dma/.
2 https://www.its.dot.gov/data_capture/data_
capture.htm.
3 https://www.its.dot.gov/aeris/.
4 https://www.its.dot.gov/connected_vehicle/road_
weather.htm.
5 https://www.its.dot.gov/safety_pilot/.
6 https://www.its.dot.gov/research/v2i.htm.
7 https://www.its.dot.gov/research/v2v.htm.
PO 00000
Frm 00129
Fmt 4703
Sfmt 4703
14105
These programs seek to identify,
develop, and deploy applications that
leverage the full potential of trusted
communications among connected
vehicles, travelers, and infrastructure to
better inform travelers, enhance current
operational practices, and transform
surface transportation systems
management. In 2012–2013, the
connected vehicle research program
conducted the Safety Pilot Model
Deployment in Ann Arbor, Michigan, to
assess the potential of V2V and other
safety applications to reduce crashes
and improve roadway system safety.
Building on the collective body of
connected vehicle research work, the
Connected Vehicle Pilot Deployment
Program seeks preliminary operational
deployments of connected vehicle
applications that synergistically capture
and utilize new forms of connected
vehicle and mobile device data to
improve multimodal surface
transportation system performance and
enable enhanced performance-based
systems management. The applications
developed as connected vehicle
applications include support for
improved decisionmaking by both
system users (travelers) and system
managers. The intent is to deploy sitetailored collections of applications that
address specific local needs while
laying a foundation for broader regional
and national deployment. Pilot
deployment sites selected in this effort
will focus on combinations of
applications that result in improved and
measureable system performance in one
or more of the following areas:
• System Productivity.
• Mobility, including impact on
freight movements.
• Livability/Accessibility
(accessibility is defined as the ability to
reach goods, services, and activities).
• Environment/Fuel Use.
• Traveler/System Safety, including
advising of potentially unsafe
conditions and mitigating the impact of
events that may cause vehicle crashes.
Purpose of the Notice
The DOT seeks comments and
innovative ideas from the public sector,
private sector, and academic
communities concerning the pilot
program described in this RFI. While
comments are welcome on any area of
the RFI, the DOT is particularly
interested in responses to the questions
listed at the end of this RFI.
Connected Vehicle Pilot Deployment
Program Description
This Connected Vehicle Pilot
Deployment Program envisions multiple
pilot deployments with an initial wave
E:\FR\FM\12MRN1.SGM
12MRN1
Agencies
[Federal Register Volume 79, Number 48 (Wednesday, March 12, 2014)]
[Notices]
[Pages 14101-14105]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05350]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge (PFC) Approvals and
Disapprovals
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Monthly Notice of PFC Approvals and Disapprovals. In December
2013, there were three applications approved. This notice also includes
information on eight applications, two approved in November 2012, one
approved in August 2013, and five approved in November 2013,
inadvertently left off the November 2012, August 2013, and November
2013 notices, respectively. Additionally, four approved amendments to
previously approved applications are listed.
-----------------------------------------------------------------------
SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC
approvals and disapprovals under the provisions of the Aviation Safety
and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the
Federal Aviation Regulations (14 CFR Part 158). This notice is
published pursuant to paragraph d of Sec. 158.29.
PFC Applications Approved
PUBLIC AGENCY: City of Chicago Department of Aviation, Chicago,
Illinois.
APPLICATION NUMBER: 13-26-C-00-ORD.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $2,484,000.
EARLIEST CHARGE EFFECTIVE DATE: November 1, 2038.
ESTIMATED CHARGE EXPIRATION DATE: December 1, 2038.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the approved
class accounts for less than 1 percent of the total annual enplanements
at Chicago O'Hare International Airport.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AND USE:
O'Hare School sound insulation program--noise abatement modifications,
St. Tarcissus School.
DECISION DATE: November 2, 2012.
FOR FURTHER INFORMATION CONTACT: Amy Hanson, Chicago Airports District
Office, (847) 294-7354.
PUBLIC AGENCY: City of Atlanta Department of Aviation, Atlanta,
Georgia.
APPLICATION NUMBER: 12-14-C-00-ATL.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $24,355,000.
EARLIEST CHARGE EFFECTIVE DATE: October 1, 2023.
ESTIMATED CHARGE EXPIRATION DATE: December 1, 2023.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi/
commercial operators when enplaning revenue passengers in limited,
irregular, special service air taxi/commercial operations such as air
ambulance services, student instruction, and non-stop sightseeing
flights, that begin and end at the airport and are concluded within a
25-mile radius of the airport.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the approved
class accounts for less than 1 percent of the total annual enplanements
at Hartsfield--Jackson Atlanta International Airport.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND
[[Page 14102]]
USE AT A $4.50 PFC LEVEL: North deicing facility. Runway 10/28 bridge
and taxiway SG bridge deck visual enhancements.
DECISION DATE: November 29, 2012.
FOR FURTHER INFORMATION CONTACT: Scott Seritt, Atlanta Airports
District Office, (404) 305-7150.
PUBLIC AGENCY: Broward County Aviation Department, Dania Beach,
Florida.
APPLICATION NUMBER: 13-13-C-00-FLL.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $50,899,175.
EARLIEST CHARGE EFFECTIVE DATE: February 1, 2031.
ESTIMATED CHARGE EXPIRATION DATE: February 1, 2032.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Non-scheduled/
on-demand air carriers.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the approved
class accounts for less than 1 percent of the total annual enplanements
at Fort Lauderdale/Hollywood International Airport.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE AT A
$3.00 PFC LEVEL:
Loading bridges, phase II.
Rehabilitation of runway 9L/27R (design only).
Aircraft rescue and firefighting truck 210 replacement.
Disabled passenger lift replacement.
BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND
USE AT A $4.50 PFC LEVEL: In-line explosives detection system baggage
system.
DETERMINATION: Partially approved for collection and use. In
accordance with Sec. 158.15(b)(6), the duty free concession storage
area in Terminal 2 is not PFC eligible. Further, in accordance with
Sec. 158.15(b)(2), the air carrier operations space is not PFC
eligible. However, according to the PFC application, the costs of these
relocations are not included in the PFC amount requested for this
project so the PFC amount of the project is not being reduced as a
result of the ineligible areas. In addition, the FAA found a
mathematical error in the estimate for the baggage system in Terminal 4
and is reducing the approved PFC amount accordingly.
BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND
USE AT A $3.00 PFC LEVEL: Hardstand operation equipment.
DETERMINATION: Partially approved for collection and use. In
accordance with Sec. 158.15(b)(2), the air stair component is not PFC
eligible.
BRIEF DESCRIPTION OF WITHDRAWN PROJECT: Noise monitors.
DATE OF WITHDRAWAL: August 16, 2013.
DECISION DATE: August 26, 2013.
FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District
Office, (407) 812-6331
PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
APPLICATION NUMBER: 13-05-C-00-HNL.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $301,094,938.
EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HONOLULU
INTERNATIONAL AIRPORT (HNL) AND USE AT HNL AT A $4.50 PFC LEVEL: Runway
08R/26L pavement rehabilitation.
Runway 04R/22L pavement rehabilitation.
Install runway 04L/22R lighting system.
Loading bridge replacement--Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron--Mauka concourse.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND
USE AT HNL AT A $3.00 PFC LEVEL:
Second level roadway improvements--Overseas Terminal.
Shuttle bus stations between gates 6 and 62--terminal improvements.
Roof canopy replacement--Overseas Terminal.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND
USE AT HILO INTERNATIONAL AIRPORT (ITO) AT A $4.50 PFC LEVEL: Construct
aircraft rescue and firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT HNL AND
USE AT KONA INTERNATIONAL AT KEAHOLE AIRPORT (KOA) AT A $4.50 PFC
LEVEL: Construct aircraft rescue and firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT HNL FOR
FUTURE USE AT KAHULUI AIRPORT (OGG) AT A $3.00 PFC LEVEL: Land
acquisition.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT HNL AND USE
AT HNL, ITO, KOA, OGG, AND LIHUE AIRPORT (LIH) AT A $3.00 PFC LEVEL:
PFC administrative costs.
BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural
improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19, 2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District
Office, (808) 541-1225.
PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
APPLICATION NUMBER: 13-05-C-00-OGG.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $85,385,132.
EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement rehabilitation.
Install runway 04L/22R lighting system.
Loading bridge replacement--Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron--Mauka concourse.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
Shuttle bus stations between gates 6 and 62--terminal improvements.
Roof canopy replacement--Overseas Terminal.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
[[Page 14103]]
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT OGG AND
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT OGG FOR
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT OGG AND USE
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative
costs.
BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural
improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19, 2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District
Office, (808) 541-1225.
PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
APPLICATION NUMBER: 13-05-C-00-KOA.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $26,963,726.
EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement rehabilitation.
Install runway 04L/22R lighting system.
Loading bridge replacement--Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron--Mauka concourse.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
Shuttle bus stations between gates 6 and 62--terminal improvements.
Roof canopy replacement--Overseas Terminal.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT KOA AND
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT KOA FOR
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT KOA AND USE
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative
costs.
BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural
improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19, 2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District
Office, (808) 541-1225.
PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
APPLICATION NUMBER: 13-05-C-00-LIH.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $17,975,817.
EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement rehabilitation.
Install runway 04L/22R lighting system.
Loading bridge replacement--Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron--Mauka concourse.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
Shuttle bus stations between gates 6 and 62--terminal improvements.
Roof canopy replacement--Overseas Terminal.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT LIH AND
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT LIH FOR
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT LIH AND USE
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative
costs.
BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural
improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19, 2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District
Office, (808) 541-1225.
PUBLIC AGENCY: State of Hawaii, Honolulu, Hawaii.
APPLICATION NUMBER: 13-03-C-00-ITO.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $17,975,817.
EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: July 1, 2026.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND
USE AT HNL AT A $4.50 PFC LEVEL: Runway 08R/26L pavement
rehabilitation.
Runway 04R/22L pavement rehabilitation.
Install runway 04L/22R lighting system.
Loading bridge replacement--Overseas Terminal.
Construct new Mauka concourse.
Aircraft parking apron--Mauka concourse.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND
USE AT HNL AT A $3.00 PFC LEVEL: Second level roadway improvements--
Overseas Terminal.
Shuttle bus stations between gates 6 and 62--terminal improvements.
[[Page 14104]]
Roof canopy replacement--Overseas Terminal.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND
USE AT ITO AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT ITO AND
USE AT KOA AT A $4.50 PFC LEVEL: Construct aircraft rescue and
firefighting facility.
Install access control and closed circuit television.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT ITO FOR
FUTURE USE AT OGG AT A $3.00 PFC LEVEL: Land acquisition.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT ITO AND USE
AT HNL, ITO, KOA, OGG, AND LIH AT A $3.00 PFC LEVEL: PFC administrative
costs.
BRIEF DESCRIPTION OF WITHDRAWN PROJECTS: Taxiway Z structural
improvements at HNL.
Runway 08L/26R widening at HNL.
DATE OF WITHDRAWAL: July 19, 2013/
DECISION DATE: November 22, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Wong, Honolulu Airports District
Office, (808) 541-1225.
PUBLIC AGENCY: Monterey Peninsula Airport District, Monterey,
California.
APPLICATION NUMBER: 14-19-C-00-MRY.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $925,000.
EARLIEST CHARGE EFFECTIVE DATE: February 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: May 1, 2015.
CLASSES OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S:
(1) Non-scheduled/on-demand air carriers filing FAA Form 1800-31;
and (2) commuters or small certificated air carriers filing Department
of Transportation (DOT) Form T-100.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that each of the
approved classes accounts for less than 1 percent of the total annual
enplanements at Monterey Peninsula Airport.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
Acquire one standard police vehicle--security improvement.
Improve runway safety area, runway 10R/28L--phase 4.
DECISION DATE: December 3, 2013.
FOR FURTHER INFORMATION CONTACT: Neil Kumar, San Francisco Airports
District Office, (650) 827-7627.
PUBLIC AGENCY: Jackson County Airport Authority, Medford, Oregon.
APPLICATION NUMBER: 14-11-C-00-MFR.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $1,082,418.
EARLIEST CHARGE EFFECTIVE DATE: September 1, 2025.
ESTIMATED CHARGE EXPIRATION DATE: August 1, 2026.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi/
commercial operators when enplaning revenue passengers in limited,
irregular, special service air taxi/commercial operations such as air
ambulance services, student instruction, and non-stop sightseeing
flights, that begin and end at the airport and are concluded within a
25-mile radius of the airport.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the approved
class accounts for less than 1 percent of the total annual enplanements
at Rogue Valley International--Medford Airport.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
Rehabilitate taxiway C design.
Rehabilitate taxiway B/C construction.
Snow removal equipment (rotary plow).
Rehabilitate taxilanes.
Rehabilitate runway 14/32.
Relocate perimeter fencing.
PFC administration.
DECISION DATE: December 10, 2013.
FOR FURTHER INFORMATION CONTACT: Trang Tran, Seattle Airports District
Office, (425) 227-1662.
PUBLIC AGENCY: County of Delta, Escanaba, Michigan.
APPLICATION NUMBER: 14-09-C-00-ESC.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $134,671.
EARLIEST CHARGE EFFECTIVE DATE: April 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: November 1, 2016.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
Airport layout plan update.
Runway 9/27 rehabilitation.
Environmental study.
Westland mitigation.
Acquire easements.
Obstruction removal.
Construct taxiway lighting.
Install supplemental wind cone.
Design and construct snow removal equipment building.
Design and construct perimeter fence.
Rehabilitate taxiways.
Rehabilitate runway 18/36.
Runway safety improvements, runway 18/36.
Apron rehabilitation.
Taxiway B widening and taxiway C rehabilitation.
DECISION DATE: December 19, 2013.
FOR FURTHER INFORMATION CONTACT: Irene Porter, Detroit Airports
District Office, (734) 229-2915.
Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
Original Amended
Amendment Original Amended estimated estimated
Amendment No. city, state approved date approved net approved net charge exp. charge exp.
PFC revenue PFC revenue date date
----------------------------------------------------------------------------------------------------------------
10-08-C-02-GCC Gillette, WY..... 12/3/13 $813,164 $793,843 11/01/14 01/01/14
10-04-C-01-CEC Crescent City, CA 12/4/13 $96,221 $75,221 07/01/18 10/01/14
07-04-C-01-RAP Rapid City, SD... 12/4/13 $1,401,088 $728,665 09/01/08 02/01/08
07-05-C-01-LAWTON, OK........... 12/17/13 $357,888 $566,166 04/01/09 04/01/09
----------------------------------------------------------------------------------------------------------------
[[Page 14105]]
Issued in Washington, DC, on March 6, 2014.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 2014-05350 Filed 3-11-14; 8:45 am]
BILLING CODE 4910-13-P