The M&R facility would be
constructed within a historic airplane
hangar complex on Floyd Bennett Field,
which is part of the Gateway National
Recreation Area. Floyd Bennett Field is
listed in the National Register of
Historic Places as a historic district, and
the hangar complex is considered a
contributing element to the significance
of the site. Transco is proposing to
adaptively reuse and restore the hangar
complex to an exterior appearance that
would enhance the visual
characteristics of Floyd Bennett Field
Historic District.
For the Northeast Connector Project,
Transco proposes to:
• Add an incremental 6,540
horsepower (hp) of compression at its
existing Compressor Station 195 in York
County, Pennsylvania by replacing three
existing natural gas-fired reciprocating
engines and appurtenant facilities with
two new electric motor drives;
• add an incremental 5,000 hp of
compression at its existing Compressor
Station 205 in Mercer County, New
Jersey by uprating two existing electric
motor drives; and
• add an incremental 5,400 hp of
compression at its existing Compressor
Station 207 in Middlesex County, New
Jersey by uprating two existing electric
motor drives.
These modifications would occur on
lands owned by Transco within the
existing compressor station sites.
The FERC staff mailed copies of the
final EIS to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners; other
interested individuals and nongovernmental organizations;
newspapers and libraries in the project
area; and parties to this proceeding.
Paper copy versions of this EIS were
mailed to those specifically requesting
them; all others received a compact disk
version. In addition, the final EIS is
available for public viewing on the
FERC’s Web site (www.ferc.gov). A
limited number of hardcopies are
available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Additional information about the
Projects is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
number excluding the last three digits
(i.e., CP13–36). Be sure you have
VerDate Mar<15>2010
18:00 Mar 07, 2014
Jkt 232001
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676; for TTY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Dated: February 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05119 Filed 3–7–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14582–000]
Mid-Atlantic Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 31, 2014, Mid-Atlantic
Hydro, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project to be located at the
U.S. Army Corps of Engineers’ (Corps)
George W. Andrews Lock and Dam on
the Chattahoochee River near the town
of Columbia in Houston County,
Alabama. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 100-foot-long, 150foot-wide intake channel; (2) a 70-footlong, 150-foot-wide, 40-foot-high
powerhouse containing three generation
units with a total capacity of 12
megawatts; (3) a 100-foot-long, 150-footwide tailrace; and (4) a 10-mile-long,
115kV transmission line to an existing
PO 00000
Frm 00025
Fmt 4703
Sfmt 9990
transmission facility. The proposed
project would have an average annual
generation of 60,000 megawatt-hours,
and operate as directed by the Corps.
Applicant Contact: Ms. Jennifer
Mesirow, Mid-Atlantic Hydro, LLC,
5425 Wisconsin Avenue, Suite 600,
Chevy Chase, MD 20815; Phone: (301)
718–4826.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14582) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: February 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05124 Filed 3–7–14; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 79, Number 46 (Monday, March 10, 2014)]
[Notices]
[Page 13296]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05124]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14582-000]
Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On January 31, 2014, Mid-Atlantic Hydro, LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of a hydropower project
to be located at the U.S. Army Corps of Engineers' (Corps) George W.
Andrews Lock and Dam on the Chattahoochee River near the town of
Columbia in Houston County, Alabama. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of the following: (1) A 100-
foot-long, 150-foot-wide intake channel; (2) a 70-foot-long, 150-foot-
wide, 40-foot-high powerhouse containing three generation units with a
total capacity of 12 megawatts; (3) a 100-foot-long, 150-foot-wide
tailrace; and (4) a 10-mile-long, 115kV transmission line to an
existing transmission facility. The proposed project would have an
average annual generation of 60,000 megawatt-hours, and operate as
directed by the Corps.
Applicant Contact: Ms. Jennifer Mesirow, Mid-Atlantic Hydro, LLC,
5425 Wisconsin Avenue, Suite 600, Chevy Chase, MD 20815; Phone: (301)
718-4826.
FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202)
502-8577.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14582) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: February 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-05124 Filed 3-7-14; 8:45 am]