Equitrans, L.P.; Notice of Request Under Blanket Authorization, 13297 [2014-05121]
Download as PDF
13297
Federal Register / Vol. 79, No. 46 / Monday, March 10, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–90–000]
emcdonald on DSK67QTVN1PROD with NOTICES
Equitrans, L.P.; Notice of Request
Under Blanket Authorization
Take notice that on February 24, 2014,
Equitrans, L.P. (Equitrans), 625 Liberty
Avenue, Suite 1700, Pittsburgh,
Pennsylvania 15222–3111, filed in
Docket No. CP14–90–000, a prior notice
request pursuant to sections 157.205,
157.208 and 157.210 of the
Commission’s Regulations under the
Natural Gas Act (NGA) as amended,
requesting authorization to construct
1,600 feet of 12-inch-diameter pipeline,
above ground pig receiving and
launching facilities at the existing
Callisto Compressor Station and
appurtenances, referred to as the H–164
Pipeline Project (Project) in Greene
County, Pennsylvania. Equitrans states
that the Project would increase the
capacity of its Mainline System by
475,000 Dth per day enabling it to
receive expanding natural gas
production in the area and to provide
incremental transportation service to an
existing interconnection with Texas
Eastern Transmission, L.P. at its Castillo
Compressor Station. Equitrans estimates
the costs of the proposed project to be
approximately $11.1 million, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Paul W.
Diehl, Senior Counsel, EQT
Corporation, 625 Liberty Avenue Suite
1700, Pittsburgh, Pennsylvania 15222–
3111, by telephone at (412) 395–5540 or
by facsimile at (412) 553–7781 or by
email at pdiehl@eqt.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: March 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05121 Filed 3–7–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Concerning Submittals Made
During Adverse Weather-Related
Government Closures
Take notice that the Commission is
adopting the following procedural
practice with respect to acceptance of
submittals when, due to adverse
weather that has resulted in the Office
of Personnel Management closing
Federal government offices in
Washington, DC., the Commission is
closed.
Effective March 7, 2014, when the
Commission is closed due to adverse
weather that has resulted in the Office
of Personnel Management closing
Federal government offices in
Washington, DC, the Commission will
not accept submittals—either in
hardcopy format or in electronic format
through ‘‘FERC Online’’ (including
through eFiling and eTariff).
At such time as the Commission
reopens, it will again accept submittals
both in hardcopy format and in
electronic format through ‘‘FERC
Online’’ (including through eFiling and
eTariff).
Dated: March 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–05123 Filed 3–7–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Technical Conference
Filing Requirements for El. Utility S.A ...............................................................................................................
Electricity Market Transparency Provisions of Section 220 of the Federal Power Act ...................................
Revisions to Electric Quarterly Report Filing Process .......................................................................................
Revised Public Utility Filing Requirements for Electric Quarterly Reports .....................................................
VerDate Mar<15>2010
18:00 Mar 07, 2014
Jkt 232001
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
E:\FR\FM\10MRN1.SGM
Docket
Docket
Docket
Docket
10MRN1
Nos.
Nos.
Nos.
Nos.
RM01–8–000
RM10–12–000
RM12–3–000
ER02–2001–000
Agencies
[Federal Register Volume 79, Number 46 (Monday, March 10, 2014)]
[Notices]
[Page 13297]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05121]
[[Page 13297]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-90-000]
Equitrans, L.P.; Notice of Request Under Blanket Authorization
Take notice that on February 24, 2014, Equitrans, L.P. (Equitrans),
625 Liberty Avenue, Suite 1700, Pittsburgh, Pennsylvania 15222-3111,
filed in Docket No. CP14-90-000, a prior notice request pursuant to
sections 157.205, 157.208 and 157.210 of the Commission's Regulations
under the Natural Gas Act (NGA) as amended, requesting authorization to
construct 1,600 feet of 12-inch-diameter pipeline, above ground pig
receiving and launching facilities at the existing Callisto Compressor
Station and appurtenances, referred to as the H-164 Pipeline Project
(Project) in Greene County, Pennsylvania. Equitrans states that the
Project would increase the capacity of its Mainline System by 475,000
Dth per day enabling it to receive expanding natural gas production in
the area and to provide incremental transportation service to an
existing interconnection with Texas Eastern Transmission, L.P. at its
Castillo Compressor Station. Equitrans estimates the costs of the
proposed project to be approximately $11.1 million, all as more fully
set forth in the application which is on file with the Commission and
open to public inspection. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Paul
W. Diehl, Senior Counsel, EQT Corporation, 625 Liberty Avenue Suite
1700, Pittsburgh, Pennsylvania 15222-3111, by telephone at (412) 395-
5540 or by facsimile at (412) 553-7781 or by email at pdiehl@eqt.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: March 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-05121 Filed 3-7-14; 8:45 am]