Combined Notice of Filings, 13294-13295 [2014-05048]
Download as PDF
13294
Federal Register / Vol. 79, No. 46 / Monday, March 10, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
emcdonald on DSK67QTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: PR14–25–000.
Applicants: Moss Bluff Hub, LLC.
Description: Tariff filing per
284.123(e)/.224: No-notice Service to be
effective 3/1/2014; TOFC 770.
Filed Date: 2/25/14.
Accession Number: 20140225–5029.
Comments Due: 5 p.m. ET 3/18/14.
Docket Numbers: PR14–26–000.
Applicants: Bay Gas Storage, LLC.
Description: Tariff filing per
284.123(e)/.224; Annual Company Use
Percentage 2014 to be effective 3/1/
2012; TOFC: 770.
Filed Date: 2/27/14.
Accession Number: 20140227–5124.
Comments Due: 5 p.m. ET 3/20/14.
Docket Numbers: RP14–524–000.
Applicants: Viking Gas Transmission
Company.
Description: LMCRA—Spring 2014 to
be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5047.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–525–000.
Applicants: Ruby Pipeline, L.L.C.
Description: FL&U and EPC effective
April 1, 2014 to be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5057.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–526–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: Annual Electric Power
Tracker Filing effective April 1, 2014 to
be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5063.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–527–000.
Applicants: Northwest Pipeline LLC.
Description: South Seattle
Incremental Rate Update to be effective
4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5082.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–528–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: Remove x–274 & X–275
References to be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5090.
VerDate Mar<15>2010
18:00 Mar 07, 2014
Jkt 232001
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–529–000.
Applicants: High Island Offshore
System, L.L.C.
Description: High Island Offshore
System, L.L.C. submits 2014 Annual
Fuel Filing for calendar year 2013
activity.
Filed Date: 2/27/14.
Accession Number: 20140227–5096.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–530–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Removing Expired/
Expiring Agreements to be effective 4/1/
2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5098.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–531–000.
Applicants: Northwest Pipeline LLC.
Description: 2014 Summer Fuel Filing
to be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5108.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–532–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Tenaska LPS–RO142972
to be effective 3/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5118.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–533–000.
Applicants: Noble Energy, Inc.,
Foundation Energy Management, LLC.
Description: Joint Petition for
Temporary Waiver of Commission
Policies, Capacity Release Regulations
and Related Tariff Provisions of Noble
Energy, Inc and Foundation Energy
Management, LLC.
Filed Date: 2/27/14.
Accession Number: 20140227–5122.
Comments Due: 5 p.m. ET 3/6/14.
Docket Numbers: RP14–534–000.
Applicants: LA Storage, LLC.
Description: LA Storage Annual
Adjustment of Fuel Retainage
Percentage 2014 to be effective 10/1/
2013.
Filed Date: 2/27/14.
Accession Number: 20140227–5125.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–535–000.
Applicants: High Point Gas
Transmission, LLC.
Description: Annual Unaccounted for
Gas Retention Percentage Filing of High
Point Gas Transmission, LLC.
Filed Date: 2/27/14.
Accession Number: 20140227–5126.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–536–000.
Applicants: Rockies Express Pipeline
LLC.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Description: 2014 Annual FL&U
Percentage Adjustment to be effective 4/
1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5136.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–537–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: Negotiated Rates—
Cherokee AGL—Replacement
Shippers—Mar 2014 to be effective 3/1/
2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5224.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–538–000.
Applicants: Midwestern Gas
Transmission Company.
Description: PAL Negotiated Rate
Agreement—NJR Energy Services to be
effective 2/27/2014.
Filed Date: 2/27/14.
Accession Number: 20140227–5227.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14–539–000.
Applicants: Kern River Gas
Transmission Company.
Description: 2014 Daggett Surcharge
to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5001.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–540–000.
Applicants: Paiute Pipeline Company.
Description: 2014 Rate Case to be
effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5002.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–541–000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine’s Annual LUAF
and Fuel Filing to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5003.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–542–000.
Applicants: Cheyenne Plains Gas
Pipeline Company, L.
Description: CPG Non-Conforming
Negotiated Rate Update Filing to be
effective 3/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5005.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–543–000.
Applicants: Equitrans, L.P.
Description: Non-conforming &
Negotiated Rate Service Agreements—
PNG, PTWP & Antero to be effective
4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5006.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–544–000.
Applicants: Panhandle Eastern Pipe
Line Company, LP.
E:\FR\FM\10MRN1.SGM
10MRN1
emcdonald on DSK67QTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 46 / Monday, March 10, 2014 / Notices
Description: Fuel Filing on 2–28–2014
to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5023.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–545–000.
Applicants: Trunkline Gas Company,
LLC.
Description: Fuel Filing on 2–28–2014
to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5024.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–546–000.
Applicants: Southwest Gas Storage
Company.
Description: Fuel Filing on 2–28–2014
to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5025.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–547–000.
Applicants: Northern Border Pipeline
Company.
Description: BP Canada Energy Mktg
Agmt to be effective 3/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5026.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–548–000.
Applicants: Elba Express Company,
L.L.C.
Description: Cost and Revenue Study.
Filed Date: 2/28/14.
Accession Number: 20140228–5028.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–549–000.
Applicants: ANR Pipeline Company.
Description: Fuel Filing 2014 to be
effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5039.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14–550–000.
Applicants: Columbia Gulf
Transmission, LLC.
Description: TRA 2014 to be effective
4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228–5040.
Comments Due: 5 p.m. ET 3/12/14.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR § 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP14–499–001.
Applicants: Northwest Pipeline LLC.
Description: Conditional Service
Agreement Extensions Ammendment to
be effective 4/1/2014.
VerDate Mar<15>2010
18:00 Mar 07, 2014
Jkt 232001
Filed Date: 2/26/14.
Accession Number: 20140226–5159.
Comments Due: 5 p.m. ET 3/10/14.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
§ 385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated February 28, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–05048 Filed 3–7–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP13–36–000, CP13–132–000]
Transcontinental Gas Pipe Line
Company; Notice of Availability of the
Final Environmental Impact Statement
for the Proposed Rockaway Delivery
Lateral and Northeast Connector
Projects
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared this final
environmental impact statement (EIS)
for the Rockaway Delivery Lateral
Project and Northeast Connector Project
(collectively referred to as the Projects)
as proposed by Transcontinental Gas
Pipe Line Company (Transco) in the
above-referenced dockets. For the
Rockaway Delivery Lateral Project,
Transco requests authorization to
expand its natural gas pipeline system
in New York to provide firm delivery
lateral service of 647 thousand
dekatherms per day (Mdth/d) of natural
gas to National Grid’s distribution
system in New York City. For the
Northeast Connector Project, Transco
proposes to modify existing compressor
station facilities along its existing
pipeline system in Pennsylvania and
New Jersey to provide 100 Mdth/d of
new incremental natural gas supply to
National Grid, as part of the 647 Mdth/
d to be provided by the Rockaway
Delivery Lateral Project. The Northeast
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
13295
Connector Project would be
operationally dependent on the
Rockaway Delivery Lateral Project with
similar construction and in-service
schedules.
The final EIS assesses the potential
environmental effects of construction
and operation of the Projects in
accordance with the requirements of the
National Environmental Policy Act
(NEPA). The FERC staff concludes that
approval of the Projects would have
some adverse environmental impacts,
but these impacts would be reduced to
less-than-significant levels with the
implementation of Transco’s proposed
mitigation and the additional measures
recommended in the final EIS.
The National Park Service; U.S.
Environmental Protection Agency; U.S.
Army Corps of Engineers, New York
District; National Oceanic and
Atmospheric Administration, National
Marine Fisheries Service; and City of
New York participated as cooperating
agencies in the preparation of the final
EIS. Cooperating agencies have
jurisdiction by law or special expertise
with respect to resources potentially
affected by a proposal and participate in
the NEPA analysis. While the
conclusions and recommendations
presented in the final EIS were
developed with input from the
cooperating agencies, the federal
cooperating agencies will present their
own conclusions and recommendations
in their respective Records of Decision
for the Projects.
The final EIS addresses the potential
environmental effects of construction
and operation of the facilities proposed
by Transco for the Projects. For the
Rockaway Delivery Lateral Project, these
facilities include:
• Approximately 3.2 miles of new 26inch-diameter pipeline to deliver
natural gas from Transco’s existing
Lower New York Bay Lateral (LNYBL)
in the Atlantic Ocean to an onshore tiein with the National Grid system on the
Rockaway Peninsula in the Borough of
Queens, Queens County, New York; and
• an onshore meter and regulating
(M&R) facility to be built in the Borough
of Brooklyn, Kings County, New York.
Approximately 2.6 miles of the
proposed pipeline would be constructed
offshore on submerged lands owned by
New York State. About 0.6 mile of the
pipeline would be built on federal
lands, both onshore and offshore, within
the Gateway National Recreation Area,
which is administered by the National
Park Service. Less than 0.1 mile of the
pipeline would be built on land owned
by the Triborough Bridge and Tunnel
Authority.
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 79, Number 46 (Monday, March 10, 2014)]
[Notices]
[Pages 13294-13295]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-05048]
[[Page 13294]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR14-25-000.
Applicants: Moss Bluff Hub, LLC.
Description: Tariff filing per 284.123(e)/.224: No-notice Service
to be effective 3/1/2014; TOFC 770.
Filed Date: 2/25/14.
Accession Number: 20140225-5029.
Comments Due: 5 p.m. ET 3/18/14.
Docket Numbers: PR14-26-000.
Applicants: Bay Gas Storage, LLC.
Description: Tariff filing per 284.123(e)/.224; Annual Company Use
Percentage 2014 to be effective 3/1/2012; TOFC: 770.
Filed Date: 2/27/14.
Accession Number: 20140227-5124.
Comments Due: 5 p.m. ET 3/20/14.
Docket Numbers: RP14-524-000.
Applicants: Viking Gas Transmission Company.
Description: LMCRA--Spring 2014 to be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5047.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-525-000.
Applicants: Ruby Pipeline, L.L.C.
Description: FL&U and EPC effective April 1, 2014 to be effective
4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5057.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-526-000.
Applicants: Transcontinental Gas Pipe Line Company.
Description: Annual Electric Power Tracker Filing effective April
1, 2014 to be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5063.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-527-000.
Applicants: Northwest Pipeline LLC.
Description: South Seattle Incremental Rate Update to be effective
4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5082.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-528-000.
Applicants: Transcontinental Gas Pipe Line Company.
Description: Remove x-274 & X-275 References to be effective 4/1/
2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5090.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-529-000.
Applicants: High Island Offshore System, L.L.C.
Description: High Island Offshore System, L.L.C. submits 2014
Annual Fuel Filing for calendar year 2013 activity.
Filed Date: 2/27/14.
Accession Number: 20140227-5096.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-530-000.
Applicants: Natural Gas Pipeline Company of America.
Description: Removing Expired/Expiring Agreements to be effective
4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5098.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-531-000.
Applicants: Northwest Pipeline LLC.
Description: 2014 Summer Fuel Filing to be effective 4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5108.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-532-000.
Applicants: Natural Gas Pipeline Company of America.
Description: Tenaska LPS-RO142972 to be effective 3/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5118.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-533-000.
Applicants: Noble Energy, Inc., Foundation Energy Management, LLC.
Description: Joint Petition for Temporary Waiver of Commission
Policies, Capacity Release Regulations and Related Tariff Provisions of
Noble Energy, Inc and Foundation Energy Management, LLC.
Filed Date: 2/27/14.
Accession Number: 20140227-5122.
Comments Due: 5 p.m. ET 3/6/14.
Docket Numbers: RP14-534-000.
Applicants: LA Storage, LLC.
Description: LA Storage Annual Adjustment of Fuel Retainage
Percentage 2014 to be effective 10/1/2013.
Filed Date: 2/27/14.
Accession Number: 20140227-5125.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-535-000.
Applicants: High Point Gas Transmission, LLC.
Description: Annual Unaccounted for Gas Retention Percentage Filing
of High Point Gas Transmission, LLC.
Filed Date: 2/27/14.
Accession Number: 20140227-5126.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-536-000.
Applicants: Rockies Express Pipeline LLC.
Description: 2014 Annual FL&U Percentage Adjustment to be effective
4/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5136.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-537-000.
Applicants: Transcontinental Gas Pipe Line Company.
Description: Negotiated Rates--Cherokee AGL--Replacement Shippers--
Mar 2014 to be effective 3/1/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5224.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-538-000.
Applicants: Midwestern Gas Transmission Company.
Description: PAL Negotiated Rate Agreement--NJR Energy Services to
be effective 2/27/2014.
Filed Date: 2/27/14.
Accession Number: 20140227-5227.
Comments Due: 5 p.m. ET 3/11/14.
Docket Numbers: RP14-539-000.
Applicants: Kern River Gas Transmission Company.
Description: 2014 Daggett Surcharge to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5001.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-540-000.
Applicants: Paiute Pipeline Company.
Description: 2014 Rate Case to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5002.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-541-000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine's Annual LUAF and Fuel Filing to be effective
4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5003.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-542-000.
Applicants: Cheyenne Plains Gas Pipeline Company, L.
Description: CPG Non-Conforming Negotiated Rate Update Filing to be
effective 3/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5005.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-543-000.
Applicants: Equitrans, L.P.
Description: Non-conforming & Negotiated Rate Service Agreements--
PNG, PTWP & Antero to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5006.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-544-000.
Applicants: Panhandle Eastern Pipe Line Company, LP.
[[Page 13295]]
Description: Fuel Filing on 2-28-2014 to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5023.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-545-000.
Applicants: Trunkline Gas Company, LLC.
Description: Fuel Filing on 2-28-2014 to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5024.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-546-000.
Applicants: Southwest Gas Storage Company.
Description: Fuel Filing on 2-28-2014 to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5025.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-547-000.
Applicants: Northern Border Pipeline Company.
Description: BP Canada Energy Mktg Agmt to be effective 3/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5026.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-548-000.
Applicants: Elba Express Company, L.L.C.
Description: Cost and Revenue Study.
Filed Date: 2/28/14.
Accession Number: 20140228-5028.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-549-000.
Applicants: ANR Pipeline Company.
Description: Fuel Filing 2014 to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5039.
Comments Due: 5 p.m. ET 3/12/14.
Docket Numbers: RP14-550-000.
Applicants: Columbia Gulf Transmission, LLC.
Description: TRA 2014 to be effective 4/1/2014.
Filed Date: 2/28/14.
Accession Number: 20140228-5040.
Comments Due: 5 p.m. ET 3/12/14.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR Sec. 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified date(s). Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP14-499-001.
Applicants: Northwest Pipeline LLC.
Description: Conditional Service Agreement Extensions Ammendment to
be effective 4/1/2014.
Filed Date: 2/26/14.
Accession Number: 20140226-5159.
Comments Due: 5 p.m. ET 3/10/14.
Any person desiring to protest in any of the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR Sec. 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated February 28, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-05048 Filed 3-7-14; 8:45 am]
BILLING CODE 6717-01-P