Application To Export Electric Energy; Emera Energy U.S. Subsidiary No. 1, Inc., 12500 [2014-04840]
Download as PDF
12500
Federal Register / Vol. 79, No. 43 / Wednesday, March 5, 2014 / Notices
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments on the Applicant
application to export electric energy to
Canada should be clearly marked with
OE Docket No. EA–349–A. An
additional copy is to be provided
directly to Richard Horrobin, Bruce
Power L.P., 177 Tie Road, R.R. #2, P.O.
Box 1540, Building B10, Tiverton, ON
N0G 2T0 and Vincenzo Franco, Van
Ness Feldman, LLP, 1050 Thomas
Jefferson Street NW., Washington, DC
20007. A final decision will be made on
this application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after a determination is
made by DOE that the proposed action
will not have an adverse impact on the
sufficiency of supply or reliability of the
U.S. electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 27,
2014.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2014–04839 Filed 3–4–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–287–B]
Application To Export Electric Energy;
Emera Energy U.S. Subsidiary No. 1,
Inc.
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Application.
AGENCY:
Emera Energy U.S. Subsidiary
No. 1, Inc. (EE US No. 1) has applied to
renew its authority to transmit electric
energy from the United States to Canada
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before April 4, 2014.
ADDRESSES: Comments, protests, or
motions to intervene should be
addressed to: Lamont Jackson, Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585–0350. Because
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:13 Mar 04, 2014
Jkt 232001
of delays in handling conventional mail,
it is recommended that documents be
transmitted by overnight mail, by
electronic mail to Lamont.Jackson@
hq.doe.gov, or by facsimile to 202–586–
8008.
FOR FURTHER INFORMATION CONTACT:
Lamont Jackson (Program Office) at
202–586–0808, or by email to
Lamont.Jackson@hq.doe.gov.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the Federal Power Act (16 U.S.C.
824a(e)).
On March 26, 2009, DOE issued Order
No. EA–287–A, which authorized EE US
No. 1 to transmit electric energy from
the United States to Canada as a power
marketer for a five-year term using
existing international transmission
facilities. That authority expires on
April 19, 2014. On February 25, 2014,
EE US No. 1 filed an application with
DOE for renewal of the export authority
contained in Order No. EA–287–A for
an additional five-year term. EE US No.
1 is requesting that the notice of this
filing be published in the Federal
Register as soon as possible; that the
period for the submission of comments
be shortened; and that the Department
issue an order in an expedited manner.
Further, EE US No. 1 requests that the
existing Export Authorization be
extended beyond the expiration date, to
remain in effect until the date DOE acts
on this application.
In its application, EE US No. 1 states
that it does not own any electric
generating or transmission facilities, and
it does not have a franchised service
area. The electric energy that EE US No.
1 proposes to export to Canada would
be surplus energy purchased from
electric utilities, Federal power
marketing agencies, and other entities
within the United States and/or Canada.
The existing international transmission
facilities to be utilized by EE US No. 1
have previously been authorized by
Presidential permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedures (18
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
CFR 385.211). Any person desiring to
become a party to these proceedings
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments on the EE US No. 1
application to export electric energy to
Canada should be clearly marked with
OE Docket No. EA–287–B. An
additional copy is to be provided
directly to Will Szubielski, c/o Emera
Energy Inc., 1223 Lower Water Street,
Halifax, Nova Scotia B3J 3S8 and
Bonnie A. Suchman, Troutman Sanders
LLP, 401 9th Street NW., Suite 1000,
Washington, DC 20004. A final decision
will be made on this application after
the environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
a determination is made by DOE that the
proposed action will not have an
adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 27,
2014.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2014–04840 Filed 3–4–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Secretary of Energy Advisory Board
Department of Energy.
Notice of open meeting.
AGENCY:
ACTION:
This notice announces an
open meeting of the Secretary of Energy
Advisory Board (SEAB). SEAB was
reestablished pursuant to the Federal
Advisory Committee Act (Pub. L. 92–
463, 86 Stat. 770) (the Act). This notice
is provided in accordance with the Act.
DATES: Friday, March 28, 2014, 9:00
a.m.–12:00 p.m.
ADDRESSES: Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Karen Gibson, U.S. Department of
Energy, 1000 Independence Avenue
SUMMARY:
E:\FR\FM\05MRN1.SGM
05MRN1
Agencies
[Federal Register Volume 79, Number 43 (Wednesday, March 5, 2014)]
[Notices]
[Page 12500]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-04840]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-287-B]
Application To Export Electric Energy; Emera Energy U.S.
Subsidiary No. 1, Inc.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Application.
-----------------------------------------------------------------------
SUMMARY: Emera Energy U.S. Subsidiary No. 1, Inc. (EE US No. 1) has
applied to renew its authority to transmit electric energy from the
United States to Canada pursuant to section 202(e) of the Federal Power
Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before April 4, 2014.
ADDRESSES: Comments, protests, or motions to intervene should be
addressed to: Lamont Jackson, Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue SW., Washington, DC 20585-0350. Because of delays
in handling conventional mail, it is recommended that documents be
transmitted by overnight mail, by electronic mail to
Lamont.Jackson@hq.doe.gov, or by facsimile to 202-586-8008.
FOR FURTHER INFORMATION CONTACT: Lamont Jackson (Program Office) at
202-586-0808, or by email to Lamont.Jackson@hq.doe.gov.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the Federal Power Act (16 U.S.C.
824a(e)).
On March 26, 2009, DOE issued Order No. EA-287-A, which authorized
EE US No. 1 to transmit electric energy from the United States to
Canada as a power marketer for a five-year term using existing
international transmission facilities. That authority expires on April
19, 2014. On February 25, 2014, EE US No. 1 filed an application with
DOE for renewal of the export authority contained in Order No. EA-287-A
for an additional five-year term. EE US No. 1 is requesting that the
notice of this filing be published in the Federal Register as soon as
possible; that the period for the submission of comments be shortened;
and that the Department issue an order in an expedited manner. Further,
EE US No. 1 requests that the existing Export Authorization be extended
beyond the expiration date, to remain in effect until the date DOE acts
on this application.
In its application, EE US No. 1 states that it does not own any
electric generating or transmission facilities, and it does not have a
franchised service area. The electric energy that EE US No. 1 proposes
to export to Canada would be surplus energy purchased from electric
utilities, Federal power marketing agencies, and other entities within
the United States and/or Canada. The existing international
transmission facilities to be utilized by EE US No. 1 have previously
been authorized by Presidential permits issued pursuant to Executive
Order 10485, as amended, and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the application at the
address provided above. Protests should be filed in accordance with
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of
Practice and Procedures (18 CFR 385.211). Any person desiring to become
a party to these proceedings should file a motion to intervene at the
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five
copies of such comments, protests, or motions to intervene should be
sent to the address provided above on or before the date listed above.
Comments on the EE US No. 1 application to export electric energy
to Canada should be clearly marked with OE Docket No. EA-287-B. An
additional copy is to be provided directly to Will Szubielski, c/o
Emera Energy Inc., 1223 Lower Water Street, Halifax, Nova Scotia B3J
3S8 and Bonnie A. Suchman, Troutman Sanders LLP, 401 9th Street NW.,
Suite 1000, Washington, DC 20004. A final decision will be made on this
application after the environmental impacts have been evaluated
pursuant to DOE's National Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after a determination is made by DOE
that the proposed action will not have an adverse impact on the
sufficiency of supply or reliability of the U.S. electric power supply
system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://energy.gov/node/11845, or by
emailing Angela Troy at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 27, 2014.
Brian Mills,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.