New York Independent System Operator, Inc.; Supplemental Notice of Technical Conference, 10799 [2014-04042]
Download as PDF
Federal Register / Vol. 79, No. 38 / Wednesday, February 26, 2014 / Notices
and endangered species and species of
special concern. York Haven requests
that the Commission find that the
Settlement Agreement is in the public
interest, accept the Settlement
Agreement, and issue a new license for
the York Haven Project that incorporates
the license terms and conditions set
forth in Section 3.0 of the Settlement
Agreement without modification or
condition.
k. A copy of the settlement agreement
is available for review on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: February 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–04039 Filed 2–25–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD14–6–000]
tkelley on DSK3SPTVN1PROD with NOTICES
New York Independent System
Operator, Inc.; Supplemental Notice of
Technical Conference
As announced in the Notice issued on
January 28, 2014, the Federal Energy
Regulatory Commission (Commission)
staff will hold a technical conference on
February 26, 2014, from 9:00 a.m. to
approximately 1:00 p.m. (Eastern Time),
to discuss with interested parties
whether to model Load Zone K as an
export-constrained zone for future
Demand Curve reset proceedings.1
The conference will be held at the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. The technical conference will be
led by staff, and will be open for the
public to attend. The conference will
include a background presentation by
New York Independent System
Operator, Inc. as well as technical
questions from Commission Staff. There
1 New York Indep. Sys. Operator, Inc., 144 FERC
¶ 61,126 (2013).
VerDate Mar<15>2010
17:24 Feb 25, 2014
Jkt 232001
will also be opportunities for comments
and questions from other conference
attendees. The specific agenda and
procedures to be followed at the
conference will be announced by staff at
the opening of the conference.
Attendees should be prepared to discuss
the following:
1. Whether Zone K (Long Island) can
be modeled as export constrained Load
Zone.
2. Whether Zone K should be
included as a nested zone within the
current G–J Locality so that the larger
zone would become a G–K Locality. If
not, what rationale supports allowing
Zone K to be a nested zone within
NYCA, but not a nested zone within the
G–J Locality? Specifically, how can
generation capacity located in Zone K
be made available to serve the reliability
needs of Zones A–F but not the
reliability needs of Zones G–J?
3. Whether sufficient transmission
capability exists to allow at least some
capacity located in Zone K to reliably
serve the needs of loads in Zones G–J.
If so, what limits, if any, should be
placed on the amount of capacity in
Zone K that could be relied upon to
serve the needs of loads in Zones G–J?
How should those limits be determined?
The January 28, 2014 Notice of
Technical Conference stated that there
will be a free webcast of the conference
available. We will not be able to provide
webcasting for this event. However,
those wishing to receive
teleconferencing should inform us by
Monday, February 24, by sending an
email request to sarah.mckinley@
ferc.gov. Please put ‘‘teleconference
request’’ on the subject line, and include
your name, email and telephone
number. Teleconference information
will be emailed to you by February 25,
2014. The technical conference will be
transcribed.
Attendees may register in advance at
the following Web page: https://
www.ferc.gov/whats-new/registration/
zone-k-02–26–14-form.asp. Advance
registration is not required, but is
encouraged. Parties attending in person
should still allow time to pass through
building security procedures before the
9:00 am (Eastern Time) start time of the
conference.
Following the conference, the
Commission will consider posttechnical conference comments
submitted on or before March 26, 2014.
Answers to post-technical conference
comments are due by close of business
on or before April 16, 2014.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
10799
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–502–8659 (TTY), or send a FAX
to 202–208–2106 with the required
accommodations.
All interested persons are permitted
to attend. For more information about
the technical conference, please contact:
Adria M. Woods (Technical
Information), Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
8431, Adria.Woods@ferc.gov.
Sarah McKinley (Logistical
Information), Office of External
Affairs, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
8004, Sarah.McKinley@ferc.gov.
Dated: February 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–04042 Filed 2–25–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[Petition IV–2011–1; FRL–9907–12-Region 9]
Clean Air Act Operating Permit
Program; Petition for Objection to
State Operating Permit for Hu Honua
Bioenergy Facility, LLC; Pepeekeo,
Hawaii
Environmental Protection
Agency (EPA).
ACTION: Notice of final order on petition
to object to a state operating permit.
AGENCY:
Pursuant to Clean Air Act
(CAA) Section 505(b)(2) and 40 CFR
70.8(d), the EPA Administrator signed
an Order, dated February 7, 2014,
partially granting and partially denying
a petition to object to a CAA title V
operating permit proposed by the Clean
Air Branch, Environmental Management
Division, Hawaii Department of Health
(HDOH) for the Hu Honua Bioenergy
Facility, LLC (Hu Honua) in Pepeekeo,
Hawaii. For the Issues that EPA denied,
the Order constitutes a final action on
the petition submitted by the Law Office
of Marc Chytilo, on behalf of Preserve
Pepeekeo Health & Environment
(Petitioner), on August 26, 2011.
Pursuant to section 505(b)(2) of the
CAA, a petitioner may seek judicial
review in the United States Court of
Appeals for the appropriate circuit of
those portions of the petition which
EPA denied. Any petition for review
shall be filed within 60 days from the
date this notice appears in the Federal
SUMMARY:
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 79, Number 38 (Wednesday, February 26, 2014)]
[Notices]
[Page 10799]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-04042]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD14-6-000]
New York Independent System Operator, Inc.; Supplemental Notice
of Technical Conference
As announced in the Notice issued on January 28, 2014, the Federal
Energy Regulatory Commission (Commission) staff will hold a technical
conference on February 26, 2014, from 9:00 a.m. to approximately 1:00
p.m. (Eastern Time), to discuss with interested parties whether to
model Load Zone K as an export-constrained zone for future Demand Curve
reset proceedings.\1\
---------------------------------------------------------------------------
\1\ New York Indep. Sys. Operator, Inc., 144 FERC
61,126 (2013).
---------------------------------------------------------------------------
The conference will be held at the Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. The technical
conference will be led by staff, and will be open for the public to
attend. The conference will include a background presentation by New
York Independent System Operator, Inc. as well as technical questions
from Commission Staff. There will also be opportunities for comments
and questions from other conference attendees. The specific agenda and
procedures to be followed at the conference will be announced by staff
at the opening of the conference. Attendees should be prepared to
discuss the following:
1. Whether Zone K (Long Island) can be modeled as export
constrained Load Zone.
2. Whether Zone K should be included as a nested zone within the
current G-J Locality so that the larger zone would become a G-K
Locality. If not, what rationale supports allowing Zone K to be a
nested zone within NYCA, but not a nested zone within the G-J Locality?
Specifically, how can generation capacity located in Zone K be made
available to serve the reliability needs of Zones A-F but not the
reliability needs of Zones G-J?
3. Whether sufficient transmission capability exists to allow at
least some capacity located in Zone K to reliably serve the needs of
loads in Zones G-J. If so, what limits, if any, should be placed on the
amount of capacity in Zone K that could be relied upon to serve the
needs of loads in Zones G-J? How should those limits be determined?
The January 28, 2014 Notice of Technical Conference stated that
there will be a free webcast of the conference available. We will not
be able to provide webcasting for this event. However, those wishing to
receive teleconferencing should inform us by Monday, February 24, by
sending an email request to sarah.mckinley@ferc.gov. Please put
``teleconference request'' on the subject line, and include your name,
email and telephone number. Teleconference information will be emailed
to you by February 25, 2014. The technical conference will be
transcribed.
Attendees may register in advance at the following Web page:
https://www.ferc.gov/whats-new/registration/zone-k-02-26-14-form.asp.
Advance registration is not required, but is encouraged. Parties
attending in person should still allow time to pass through building
security procedures before the 9:00 am (Eastern Time) start time of the
conference.
Following the conference, the Commission will consider post-
technical conference comments submitted on or before March 26, 2014.
Answers to post-technical conference comments are due by close of
business on or before April 16, 2014.
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to accessibility@ferc.gov or call toll free 1-866-208-
3372 (voice) or 202-502-8659 (TTY), or send a FAX to 202-208-2106 with
the required accommodations.
All interested persons are permitted to attend. For more
information about the technical conference, please contact:
Adria M. Woods (Technical Information), Office of Energy Market
Regulation, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502-8431, Adria.Woods@ferc.gov.
Sarah McKinley (Logistical Information), Office of External Affairs,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, (202) 502-8004, Sarah.McKinley@ferc.gov.
Dated: February 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-04042 Filed 2-25-14; 8:45 am]