Notice of Availability of the Record of Decision for the Stateline Solar Farm Project and California Desert Conservation Area Plan Amendment, San Bernardino County, California, 9922 [2014-03678]
Download as PDF
9922
Federal Register / Vol. 79, No. 35 / Friday, February 21, 2014 / Notices
Authority: 40 CFR 1506.6, 40 CFR
1506.10, 43 CFR 1610.2; 43 CFR 1610.5.
Neil Kornze,
Principal Deputy Director, Bureau of Land
Management, U.S. Department of the Interior.
[FR Doc. 2014–03685 Filed 2–20–14; 8:45 am]
BILLING CODE 4310–HC–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA–048669, LLCAD09000,
L51010000.LVRWB09B2380.ER0000]
Notice of Availability of the Record of
Decision for the Stateline Solar Farm
Project and California Desert
Conservation Area Plan Amendment,
San Bernardino County, California
Bureau of Land Management,
Interior.
ACTION: Notice of availability.
AGENCY:
The Bureau of Land
Management (BLM) announces the
availability of the Record of Decision
(ROD)/Approved Amendment to the
California Desert Conservation Area
Plan (CDCA Plan) for the Stateline Solar
Farm Project (SSFP). The Principal
Deputy Assistant Secretary, Land and
Minerals Management, approved the
ROD on February 14, 2014, which
constitutes the final decision of the
Department.
ADDRESSES: Copies of the ROD/
Approved Amendment to the CDCA
Plan are available upon request from the
BLM Field Manager, Needles Field
Office, 1303 S. Highway 95, Needles,
CA 92363, and at the California Desert
District Office, 22835 Calle San Juan de
Los Lagos, Moreno Valley, CA 92553, or
via the Internet at the following Web
site: https://www.blm.gov/ca/st/en/fo/
needles/stateline_solar_farm.html.
FOR FURTHER INFORMATION CONTACT:
Jeffery Childers, BLM Project Manager,
telephone, 951–697–5308; mail, BLM
California Desert District Office, 22835
Calle San Juan de Los Lagos, Moreno
Valley, CA 92553–9046; or email
jchilders@blm.gov.
Persons who use a
telecommunications device for the deaf
(TDD) may call the Federal Information
Relay Service (FIRS) at 1–800–877–8339
to contact Mr. Childers during normal
business hours. The FIRS is available 24
hours a day, 7 days a week, to leave a
message or question for Mr. Childers.
You will receive a reply during normal
business hours.
SUPPLEMENTARY INFORMATION: The
applicant, First Solar Development,
LLC, filed an application for a right-of-
rmajette on DSK2TPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
14:09 Feb 20, 2014
Jkt 232001
way (ROW) grant authorization to
construct, operate, maintain and
decommission the 300-Megawatt (MW)
photovoltaic Stateline Solar Farm
Project (SSFP). The proposed project
includes access roads, photovoltaic
arrays, an electrical substation,
meteorological station, monitoring and
maintenance facility, water wells, and a
2.3 mile generation tie-line on up to
2,143 acres. The project location is in
San Bernardino County approximately 2
miles south of the Nevada-California
border and 0.5 miles west of Interstate
15.
The Agency-Selected Alternative
consists of a 300–MW solar PV facility
encompassing 1,685 acres on a single,
contiguous footprint, which was
described in the Final EIS as the
Revised Alternative 3: 1,685 Acre
Alternative.
The project site is located in the
California Desert District within the
planning boundary of the CDCA Plan,
which is the applicable resource
management plan for the project site
and surrounding areas. The CDCA Plan,
while recognizing the potential
compatibility of solar energy generation
facilities with other uses on public
lands, requires that all sites associated
with power generation or transmission
not already identified in the Plan be
considered through the BLM’s land use
plan amendment process. As a result,
prior to approval of a ROW grant for the
SSFP, the BLM must amend the CDCA
Plan to allow the solar energy generating
project on that site. The approved
Amendment to the CDCA Plan
specifically revises the CDCA Plan to
allow for the development of the SSFP
and ancillary facilities on land managed
by the BLM.
A Notice of Availability of the
proposed plan amendment/final EIS for
the SSFP was published in the Federal
Register on November 15, 2013 (78 FR
68860). Publication of the Notice of
Availability for the plan amendment/
final EIS initiated a 30-day protest
period for the proposed amendment to
the CDCA Plan. At the close of the 30day period, seven timely and complete
written protests were received and
thereafter resolved. Their resolution is
summarized in the Director’s Protest
Summary Report attached to the ROD.
While the Director’s resolution of
protests did not identify any issues to be
remanded, the BLM made minor
corrections and clarifying statements as
a result of protests.
Simultaneously with the protest
period, the Governor of California
conducted a 30-day consistency review
of the proposed plan amendment to
identify any inconsistencies with State
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
or local plan, policies or programs; no
inconsistencies were identified.
Because this decision is approved by
the Secretary of the Interior, it is not
subject to administrative appeal (43 CFR
4.410(a)(3)).
Authority: 40 CFR 1506.6.
Neil Kornze,
Principal Deputy Director.
[FR Doc. 2014–03678 Filed 2–20–14; 8:45 am]
BILLING CODE 4310–40–P
INTERNATIONAL TRADE
COMMISSION
[Investigation No. 337–TA–881]
Certain Windshield Wiper Devices and
Components Thereof; Notice of
Commission Determination Not To
Review an Initial Determination
Granting Complainants’ Motion To
Amend the Complaint and Notice of
Investigation
U.S. International Trade
Commission.
ACTION: Notice.
AGENCY:
Notice is hereby given that
the U.S. International Trade
Commission has determined not to
review the presiding administrative law
judge’s (‘‘ALJ’’) initial determination
(‘‘ID’’) (Order No. 27) granting the
motion of complainants Federal-Mogul
Corporation of Southfield, Michigan and
Federal-Mogul S.A. of Aubange,
Belgium (collectively ‘‘Federal-Mogul’’)
to amend the complaint to correct
respondent Trico Corporation’s
corporate name and to identify
additional accused products.
FOR FURTHER INFORMATION CONTACT:
Megan M. Valentine, Office of the
General Counsel, U.S. International
Trade Commission, 500 E Street SW.,
Washington, DC 20436, telephone (202)
708–2301. Copies of non-confidential
documents filed in connection with this
investigation are or will be available for
inspection during official business
hours (8:45 a.m. to 5:15 p.m.) in the
Office of the Secretary, U.S.
International Trade Commission, 500 E
Street SW., Washington, DC 20436,
telephone (202) 205–2000. General
information concerning the Commission
may also be obtained by accessing its
Internet server at https://www.usitc.gov.
The public record for this investigation
may be viewed on the Commission’s
electronic docket (EDIS) at https://
edis.usitc.gov. Hearing-impaired
persons are advised that information on
this matter can be obtained by
contacting the Commission’s TDD
terminal on (202) 205–1810.
SUMMARY:
E:\FR\FM\21FEN1.SGM
21FEN1
Agencies
[Federal Register Volume 79, Number 35 (Friday, February 21, 2014)]
[Notices]
[Page 9922]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-03678]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA-048669, LLCAD09000, L51010000.LVRWB09B2380.ER0000]
Notice of Availability of the Record of Decision for the
Stateline Solar Farm Project and California Desert Conservation Area
Plan Amendment, San Bernardino County, California
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) announces the availability
of the Record of Decision (ROD)/Approved Amendment to the California
Desert Conservation Area Plan (CDCA Plan) for the Stateline Solar Farm
Project (SSFP). The Principal Deputy Assistant Secretary, Land and
Minerals Management, approved the ROD on February 14, 2014, which
constitutes the final decision of the Department.
ADDRESSES: Copies of the ROD/Approved Amendment to the CDCA Plan are
available upon request from the BLM Field Manager, Needles Field
Office, 1303 S. Highway 95, Needles, CA 92363, and at the California
Desert District Office, 22835 Calle San Juan de Los Lagos, Moreno
Valley, CA 92553, or via the Internet at the following Web site: https://www.blm.gov/ca/st/en/fo/needles/stateline_solar_farm.html.
FOR FURTHER INFORMATION CONTACT: Jeffery Childers, BLM Project Manager,
telephone, 951-697-5308; mail, BLM California Desert District Office,
22835 Calle San Juan de Los Lagos, Moreno Valley, CA 92553-9046; or
email jchilders@blm.gov.
Persons who use a telecommunications device for the deaf (TDD) may
call the Federal Information Relay Service (FIRS) at 1-800-877-8339 to
contact Mr. Childers during normal business hours. The FIRS is
available 24 hours a day, 7 days a week, to leave a message or question
for Mr. Childers. You will receive a reply during normal business
hours.
SUPPLEMENTARY INFORMATION: The applicant, First Solar Development, LLC,
filed an application for a right-of-way (ROW) grant authorization to
construct, operate, maintain and decommission the 300-Megawatt (MW)
photovoltaic Stateline Solar Farm Project (SSFP). The proposed project
includes access roads, photovoltaic arrays, an electrical substation,
meteorological station, monitoring and maintenance facility, water
wells, and a 2.3 mile generation tie-line on up to 2,143 acres. The
project location is in San Bernardino County approximately 2 miles
south of the Nevada-California border and 0.5 miles west of Interstate
15.
The Agency-Selected Alternative consists of a 300-MW solar PV
facility encompassing 1,685 acres on a single, contiguous footprint,
which was described in the Final EIS as the Revised Alternative 3:
1,685 Acre Alternative.
The project site is located in the California Desert District
within the planning boundary of the CDCA Plan, which is the applicable
resource management plan for the project site and surrounding areas.
The CDCA Plan, while recognizing the potential compatibility of solar
energy generation facilities with other uses on public lands, requires
that all sites associated with power generation or transmission not
already identified in the Plan be considered through the BLM's land use
plan amendment process. As a result, prior to approval of a ROW grant
for the SSFP, the BLM must amend the CDCA Plan to allow the solar
energy generating project on that site. The approved Amendment to the
CDCA Plan specifically revises the CDCA Plan to allow for the
development of the SSFP and ancillary facilities on land managed by the
BLM.
A Notice of Availability of the proposed plan amendment/final EIS
for the SSFP was published in the Federal Register on November 15, 2013
(78 FR 68860). Publication of the Notice of Availability for the plan
amendment/final EIS initiated a 30-day protest period for the proposed
amendment to the CDCA Plan. At the close of the 30-day period, seven
timely and complete written protests were received and thereafter
resolved. Their resolution is summarized in the Director's Protest
Summary Report attached to the ROD. While the Director's resolution of
protests did not identify any issues to be remanded, the BLM made minor
corrections and clarifying statements as a result of protests.
Simultaneously with the protest period, the Governor of California
conducted a 30-day consistency review of the proposed plan amendment to
identify any inconsistencies with State or local plan, policies or
programs; no inconsistencies were identified.
Because this decision is approved by the Secretary of the Interior,
it is not subject to administrative appeal (43 CFR 4.410(a)(3)).
Authority: 40 CFR 1506.6.
Neil Kornze,
Principal Deputy Director.
[FR Doc. 2014-03678 Filed 2-20-14; 8:45 am]