Combined Notice of Filings #1, 9734-9735 [2014-03636]
Download as PDF
9734
Federal Register / Vol. 79, No. 34 / Thursday, February 20, 2014 / Notices
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: February 12, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–03649 Filed 2–19–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1843–000;
ER13–1844–000; ER10–2337–002;
ER10–2338–002; ER10–2339–002;
ER10–2340–002; ER10–2341–002;
ER10–2342–002; ER10–2344–002;
ER10–2355–002.
Applicants: Inland Empire Energy
Center, LLC.
VerDate Mar<15>2010
18:08 Feb 19, 2014
Jkt 232001
Description: Additional applicants to
June 28, 2013 Triennial Market Power
Analysis for the Southwest Region of
the Edison Mission Energy subsidiaries.
Filed Date: 10/9/13.
Accession Number: 20131009–5164.
Comments Due: 5 p.m. ET 2/25/14.
Docket Numbers: ER10–3140–013.
Applicants: Inland Empire Energy
Center, LLC.
Description: Supplement to June 13,
2013 Triennial Market Power Analysis
of Inland Empire Energy Center, LLC.
Filed Date: 2/10/14.
Accession Number: 20140210–5172.
Comments Due: 5 p.m. ET 2/20/14.
Docket Numbers: ER14–41–001;
ER14–42–001; ER12–1911–002; ER12–
1912–002; ER12–1913–002; ER12–1915–
002; ER12–1916–002; ER12–1917–002.
Applicants: RE Rosamond One LLC,
RE Rosamond Two LLC, RE McKenzie
1 LLC, RE McKenzie 2 LLC, RE
McKenzie 3 LLC, RE McKenzie 4 LLC,
RE McKenzie 5 LLC, RE McKenzie 6
LLC.
Description: Supplement to January
13, 2014 Notice of Non-Material Change
in Status of KKR MBR Sellers.
Filed Date: 2/11/14.
Accession Number: 20140211–5028.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–661–002.
Applicants: SG2 Imperial Valley LLC.
Description: Amendment to MBR
Tariff Application to be effective 2/1/
2014.
Filed Date: 2/11/14.
Accession Number: 20140211–5061.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–1301–000.
Applicants: Florida Power & Light
Company.
Description: FPL and LCEC Rate
Schedule FERC No. 326 to be effective
4/11/2014.
Filed Date: 2/10/14.
Accession Number: 20140210–5170.
Comments Due: 5 p.m. ET 3/3/14.
Docket Numbers: ER14–1302–000.
Applicants: Seminole Retail Energy
Services, L.L.C.
Description: Initial Filing to be
effective 3/10/2014.
Filed Date: 2/11/14.
Accession Number: 20140211–5032.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–1303–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2797 Prairie Wind
Transmission & Westar Interconnection
Agreement to be effective 12/31/9998.
Filed Date: 2/11/14.
Accession Number: 20140211–5034.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–1304–000.
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
Applicants: Southwest Power Pool,
Inc.
Description: 2795 Prairie Wind
Transmission & ITC Great Plains Inter.
Agreement to be effective 12/31/9998.
Filed Date: 2/11/14.
Accession Number: 20140211–5037.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–1305–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2698 Exelon Generation
Company Market Participant Agreement
to be effective 3/1/2014.
Filed Date: 2/11/14.
Accession Number: 20140211–5062.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–1306–000.
Applicants: Northeast Utilities
Service Company, The Connecticut
Light and Power Company.
Description: Northeast Utilities
Service Company submits Cancellation
of Black Pond Junction Coke Works
Agreement on behalf of its subsidiary.
Filed Date: 2/11/14.
Accession Number: 20140211–5064.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–1307–000.
Applicants: Southwestern Electric
Power Company.
Description: SWEPCO-Minden PSA
Amendment SPP Integrated Market to
be effective 3/1/2014.
Filed Date: 2/11/14.
Accession Number: 20140211–5073.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14–1308–000.
Applicants: Inland Empire Energy
Center, LLC.
Description: Order No. 784
Compliance Filing to be effective 2/12/
2014.
Filed Date: 2/11/14.
Accession Number: 20140211–5074.
Comments Due: 5 p.m. ET 3/4/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\20FEN1.SGM
20FEN1
Federal Register / Vol. 79, No. 34 / Thursday, February 20, 2014 / Notices
Dated: February 11, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–03636 Filed 2–19–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–499–000; Docket No.
CP13–502–000]
Constitution Pipeline Company, LLC,
Iroquois Gas Transmission System,
LP; Notice of Availability of the Draft
Environmental Impact Statement and
Public Comment Meetings for the
Proposed Constitution Pipeline and
Wright Interconnect Projects
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Constitution Pipeline and Wright
Interconnect Projects (projects),
proposed by Constitution Pipeline
Company, LLC (Constitution) and
Iroquois Gas Transmission System, L.P.
(Iroquois), respectively, in the abovereferenced dockets. Constitution and
Iroquois request authorization to
construct and operate certain interstate
natural gas pipeline facilities in
Pennsylvania and New York to deliver
up to 650,000 dekatherms per day of
natural gas supply to markets in New
York and New England.
The draft EIS assesses the potential
environmental effects of the
construction and operation of the
projects in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the projects would have some adverse
environmental impacts; however, these
impacts would be reduced to less-thansignificant levels with the
implementation of Constitution’s and
Iroquois’ proposed mitigation and the
additional measures recommended by
staff in the draft EIS.
The U.S. Environmental Protection
Agency, the U.S. Army Corps of
Engineers, the Federal Highway
Administration, and the New York State
Department of Agriculture and Markets
participated as cooperating agencies in
the preparation of the EIS. Cooperating
agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
proposal and participate in the NEPA
analysis. The U.S. Army Corps of
Engineers would adopt the final EIS if,
after an independent review of the
document, it concludes that its
comments and suggestions have been
satisfied.
The draft EIS addresses the potential
environmental effects of the
construction and operation of the
facilities in Susquehanna County,
Pennsylvania and Broome, Chenango,
Otsego, Delaware, and Schoharie
Counties, New York. Constitution’s
project would include 124.4 miles of
new 30-inch-diameter natural gas
pipeline and appurtenant facilities that
include two new meter stations, two
pipe interconnections, eleven mainline
valves, and one pig launcher and
receiver.1 Iroquois’ project facilities
would include the addition of 22,000
horsepower of incremental compression
and other miscellaneous modifications
its existing Wright Compressor Station
with.
The FERC staff mailed copies of the
draft EIS and this Notice to federal,
state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the area of
the projects; and parties to this
proceeding. Paper copy versions of this
EIS were mailed to those specifically
requesting them; all others received a
CD version. In addition, the draft EIS is
available for public viewing on the
FERC’s Web site (www.ferc.gov) using
the eLibrary link. A limited number of
copies are available for distribution and
public inspection at: Federal Energy
Regulatory Commission, Public
Reference Room, 888 First Street NE.,
Room 2A, Washington, DC 20426, (202)
502–8371.
Any person wishing to comment on
the draft EIS may do so. To ensure
9735
consideration of your comments on the
proposal in the final EIS, it is important
that the Commission receive your
comments before April 7, 2014.
For your convenience, there are four
methods you can use to submit your
comments to the Commission. In all
instances, please reference the project
docket numbers (CP13–499–000 and
CP13–502–000) with your submission.
The Commission encourages electronic
filing of comments and has expert staff
available to assist you at (202) 502–8258
or efiling@ferc.gov. Please carefully
follow these instructions so that your
comments are properly recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’ as
the filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
(4) In lieu of sending written or
electronic comments, the Commission
invites you to attend one of the public
comment meetings its staff will conduct
in the project area to receive comments
on the draft EIS. We encourage
interested groups and individuals to
attend these meetings and present oral
comments on the draft EIS. Transcripts
of the meetings will be available for
review in eLibrary under the project
docket numbers. All meetings will begin
at 7:00 p.m. and are scheduled as
follows:
mstockstill on DSK4VPTVN1PROD with NOTICES
Date
Location
Monday, March 31, 2014 ...................................................
Cobleskill-Richmondville High School, 1353 State Route 7, Richmondville, NY 12149,
518–234–3565.
Oneonta High School, 130 East Street, Oneonta, NY 13820 , 607–433–8243.
Afton High School, 29 Academy Street, Afton, New York 13730, 607–639–8200.
Tuesday, April 1, 2014 .......................................................
Wednesday, April 2, 2014 ..................................................
1 A pig is an internal tool that can be used to
clean and dry a pipeline and/or to inspect it for
damage or corrosion.
VerDate Mar<15>2010
18:08 Feb 19, 2014
Jkt 232001
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
E:\FR\FM\20FEN1.SGM
20FEN1
Agencies
[Federal Register Volume 79, Number 34 (Thursday, February 20, 2014)]
[Notices]
[Pages 9734-9735]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-03636]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-1843-000; ER13-1844-000; ER10-2337-002; ER10-
2338-002; ER10-2339-002; ER10-2340-002; ER10-2341-002; ER10-2342-002;
ER10-2344-002; ER10-2355-002.
Applicants: Inland Empire Energy Center, LLC.
Description: Additional applicants to June 28, 2013 Triennial
Market Power Analysis for the Southwest Region of the Edison Mission
Energy subsidiaries.
Filed Date: 10/9/13.
Accession Number: 20131009-5164.
Comments Due: 5 p.m. ET 2/25/14.
Docket Numbers: ER10-3140-013.
Applicants: Inland Empire Energy Center, LLC.
Description: Supplement to June 13, 2013 Triennial Market Power
Analysis of Inland Empire Energy Center, LLC.
Filed Date: 2/10/14.
Accession Number: 20140210-5172.
Comments Due: 5 p.m. ET 2/20/14.
Docket Numbers: ER14-41-001; ER14-42-001; ER12-1911-002; ER12-1912-
002; ER12-1913-002; ER12-1915-002; ER12-1916-002; ER12-1917-002.
Applicants: RE Rosamond One LLC, RE Rosamond Two LLC, RE McKenzie 1
LLC, RE McKenzie 2 LLC, RE McKenzie 3 LLC, RE McKenzie 4 LLC, RE
McKenzie 5 LLC, RE McKenzie 6 LLC.
Description: Supplement to January 13, 2014 Notice of Non-Material
Change in Status of KKR MBR Sellers.
Filed Date: 2/11/14.
Accession Number: 20140211-5028.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-661-002.
Applicants: SG2 Imperial Valley LLC.
Description: Amendment to MBR Tariff Application to be effective 2/
1/2014.
Filed Date: 2/11/14.
Accession Number: 20140211-5061.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-1301-000.
Applicants: Florida Power & Light Company.
Description: FPL and LCEC Rate Schedule FERC No. 326 to be
effective 4/11/2014.
Filed Date: 2/10/14.
Accession Number: 20140210-5170.
Comments Due: 5 p.m. ET 3/3/14.
Docket Numbers: ER14-1302-000.
Applicants: Seminole Retail Energy Services, L.L.C.
Description: Initial Filing to be effective 3/10/2014.
Filed Date: 2/11/14.
Accession Number: 20140211-5032.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-1303-000.
Applicants: Southwest Power Pool, Inc.
Description: 2797 Prairie Wind Transmission & Westar
Interconnection Agreement to be effective 12/31/9998.
Filed Date: 2/11/14.
Accession Number: 20140211-5034.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-1304-000.
Applicants: Southwest Power Pool, Inc.
Description: 2795 Prairie Wind Transmission & ITC Great Plains
Inter. Agreement to be effective 12/31/9998.
Filed Date: 2/11/14.
Accession Number: 20140211-5037.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-1305-000.
Applicants: Southwest Power Pool, Inc.
Description: 2698 Exelon Generation Company Market Participant
Agreement to be effective 3/1/2014.
Filed Date: 2/11/14.
Accession Number: 20140211-5062.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-1306-000.
Applicants: Northeast Utilities Service Company, The Connecticut
Light and Power Company.
Description: Northeast Utilities Service Company submits
Cancellation of Black Pond Junction Coke Works Agreement on behalf of
its subsidiary.
Filed Date: 2/11/14.
Accession Number: 20140211-5064.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-1307-000.
Applicants: Southwestern Electric Power Company.
Description: SWEPCO-Minden PSA Amendment SPP Integrated Market to
be effective 3/1/2014.
Filed Date: 2/11/14.
Accession Number: 20140211-5073.
Comments Due: 5 p.m. ET 3/4/14.
Docket Numbers: ER14-1308-000.
Applicants: Inland Empire Energy Center, LLC.
Description: Order No. 784 Compliance Filing to be effective 2/12/
2014.
Filed Date: 2/11/14.
Accession Number: 20140211-5074.
Comments Due: 5 p.m. ET 3/4/14.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 9735]]
Dated: February 11, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-03636 Filed 2-19-14; 8:45 am]