Combined Notice of Filings #1, 9734-9735 [2014-03636]

Download as PDF 9734 Federal Register / Vol. 79, No. 34 / Thursday, February 20, 2014 / Notices be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: February 12, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–03649 Filed 2–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–1843–000; ER13–1844–000; ER10–2337–002; ER10–2338–002; ER10–2339–002; ER10–2340–002; ER10–2341–002; ER10–2342–002; ER10–2344–002; ER10–2355–002. Applicants: Inland Empire Energy Center, LLC. VerDate Mar<15>2010 18:08 Feb 19, 2014 Jkt 232001 Description: Additional applicants to June 28, 2013 Triennial Market Power Analysis for the Southwest Region of the Edison Mission Energy subsidiaries. Filed Date: 10/9/13. Accession Number: 20131009–5164. Comments Due: 5 p.m. ET 2/25/14. Docket Numbers: ER10–3140–013. Applicants: Inland Empire Energy Center, LLC. Description: Supplement to June 13, 2013 Triennial Market Power Analysis of Inland Empire Energy Center, LLC. Filed Date: 2/10/14. Accession Number: 20140210–5172. Comments Due: 5 p.m. ET 2/20/14. Docket Numbers: ER14–41–001; ER14–42–001; ER12–1911–002; ER12– 1912–002; ER12–1913–002; ER12–1915– 002; ER12–1916–002; ER12–1917–002. Applicants: RE Rosamond One LLC, RE Rosamond Two LLC, RE McKenzie 1 LLC, RE McKenzie 2 LLC, RE McKenzie 3 LLC, RE McKenzie 4 LLC, RE McKenzie 5 LLC, RE McKenzie 6 LLC. Description: Supplement to January 13, 2014 Notice of Non-Material Change in Status of KKR MBR Sellers. Filed Date: 2/11/14. Accession Number: 20140211–5028. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–661–002. Applicants: SG2 Imperial Valley LLC. Description: Amendment to MBR Tariff Application to be effective 2/1/ 2014. Filed Date: 2/11/14. Accession Number: 20140211–5061. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–1301–000. Applicants: Florida Power & Light Company. Description: FPL and LCEC Rate Schedule FERC No. 326 to be effective 4/11/2014. Filed Date: 2/10/14. Accession Number: 20140210–5170. Comments Due: 5 p.m. ET 3/3/14. Docket Numbers: ER14–1302–000. Applicants: Seminole Retail Energy Services, L.L.C. Description: Initial Filing to be effective 3/10/2014. Filed Date: 2/11/14. Accession Number: 20140211–5032. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–1303–000. Applicants: Southwest Power Pool, Inc. Description: 2797 Prairie Wind Transmission & Westar Interconnection Agreement to be effective 12/31/9998. Filed Date: 2/11/14. Accession Number: 20140211–5034. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–1304–000. PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 Applicants: Southwest Power Pool, Inc. Description: 2795 Prairie Wind Transmission & ITC Great Plains Inter. Agreement to be effective 12/31/9998. Filed Date: 2/11/14. Accession Number: 20140211–5037. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–1305–000. Applicants: Southwest Power Pool, Inc. Description: 2698 Exelon Generation Company Market Participant Agreement to be effective 3/1/2014. Filed Date: 2/11/14. Accession Number: 20140211–5062. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–1306–000. Applicants: Northeast Utilities Service Company, The Connecticut Light and Power Company. Description: Northeast Utilities Service Company submits Cancellation of Black Pond Junction Coke Works Agreement on behalf of its subsidiary. Filed Date: 2/11/14. Accession Number: 20140211–5064. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–1307–000. Applicants: Southwestern Electric Power Company. Description: SWEPCO-Minden PSA Amendment SPP Integrated Market to be effective 3/1/2014. Filed Date: 2/11/14. Accession Number: 20140211–5073. Comments Due: 5 p.m. ET 3/4/14. Docket Numbers: ER14–1308–000. Applicants: Inland Empire Energy Center, LLC. Description: Order No. 784 Compliance Filing to be effective 2/12/ 2014. Filed Date: 2/11/14. Accession Number: 20140211–5074. Comments Due: 5 p.m. ET 3/4/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\20FEN1.SGM 20FEN1 Federal Register / Vol. 79, No. 34 / Thursday, February 20, 2014 / Notices Dated: February 11, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–03636 Filed 2–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–499–000; Docket No. CP13–502–000] Constitution Pipeline Company, LLC, Iroquois Gas Transmission System, LP; Notice of Availability of the Draft Environmental Impact Statement and Public Comment Meetings for the Proposed Constitution Pipeline and Wright Interconnect Projects The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Constitution Pipeline and Wright Interconnect Projects (projects), proposed by Constitution Pipeline Company, LLC (Constitution) and Iroquois Gas Transmission System, L.P. (Iroquois), respectively, in the abovereferenced dockets. Constitution and Iroquois request authorization to construct and operate certain interstate natural gas pipeline facilities in Pennsylvania and New York to deliver up to 650,000 dekatherms per day of natural gas supply to markets in New York and New England. The draft EIS assesses the potential environmental effects of the construction and operation of the projects in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the projects would have some adverse environmental impacts; however, these impacts would be reduced to less-thansignificant levels with the implementation of Constitution’s and Iroquois’ proposed mitigation and the additional measures recommended by staff in the draft EIS. The U.S. Environmental Protection Agency, the U.S. Army Corps of Engineers, the Federal Highway Administration, and the New York State Department of Agriculture and Markets participated as cooperating agencies in the preparation of the EIS. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis. The U.S. Army Corps of Engineers would adopt the final EIS if, after an independent review of the document, it concludes that its comments and suggestions have been satisfied. The draft EIS addresses the potential environmental effects of the construction and operation of the facilities in Susquehanna County, Pennsylvania and Broome, Chenango, Otsego, Delaware, and Schoharie Counties, New York. Constitution’s project would include 124.4 miles of new 30-inch-diameter natural gas pipeline and appurtenant facilities that include two new meter stations, two pipe interconnections, eleven mainline valves, and one pig launcher and receiver.1 Iroquois’ project facilities would include the addition of 22,000 horsepower of incremental compression and other miscellaneous modifications its existing Wright Compressor Station with. The FERC staff mailed copies of the draft EIS and this Notice to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; newspapers and libraries in the area of the projects; and parties to this proceeding. Paper copy versions of this EIS were mailed to those specifically requesting them; all others received a CD version. In addition, the draft EIS is available for public viewing on the FERC’s Web site (www.ferc.gov) using the eLibrary link. A limited number of copies are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502–8371. Any person wishing to comment on the draft EIS may do so. To ensure 9735 consideration of your comments on the proposal in the final EIS, it is important that the Commission receive your comments before April 7, 2014. For your convenience, there are four methods you can use to submit your comments to the Commission. In all instances, please reference the project docket numbers (CP13–499–000 and CP13–502–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’ as the filing type; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. (4) In lieu of sending written or electronic comments, the Commission invites you to attend one of the public comment meetings its staff will conduct in the project area to receive comments on the draft EIS. We encourage interested groups and individuals to attend these meetings and present oral comments on the draft EIS. Transcripts of the meetings will be available for review in eLibrary under the project docket numbers. All meetings will begin at 7:00 p.m. and are scheduled as follows: mstockstill on DSK4VPTVN1PROD with NOTICES Date Location Monday, March 31, 2014 ................................................... Cobleskill-Richmondville High School, 1353 State Route 7, Richmondville, NY 12149, 518–234–3565. Oneonta High School, 130 East Street, Oneonta, NY 13820 , 607–433–8243. Afton High School, 29 Academy Street, Afton, New York 13730, 607–639–8200. Tuesday, April 1, 2014 ....................................................... Wednesday, April 2, 2014 .................................................. 1 A pig is an internal tool that can be used to clean and dry a pipeline and/or to inspect it for damage or corrosion. VerDate Mar<15>2010 18:08 Feb 19, 2014 Jkt 232001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\20FEN1.SGM 20FEN1

Agencies

[Federal Register Volume 79, Number 34 (Thursday, February 20, 2014)]
[Notices]
[Pages 9734-9735]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-03636]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER13-1843-000; ER13-1844-000; ER10-2337-002; ER10-
2338-002; ER10-2339-002; ER10-2340-002; ER10-2341-002; ER10-2342-002; 
ER10-2344-002; ER10-2355-002.
    Applicants: Inland Empire Energy Center, LLC.
    Description: Additional applicants to June 28, 2013 Triennial 
Market Power Analysis for the Southwest Region of the Edison Mission 
Energy subsidiaries.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5164.
    Comments Due: 5 p.m. ET 2/25/14.

    Docket Numbers: ER10-3140-013.
    Applicants: Inland Empire Energy Center, LLC.
    Description: Supplement to June 13, 2013 Triennial Market Power 
Analysis of Inland Empire Energy Center, LLC.
    Filed Date: 2/10/14.
    Accession Number: 20140210-5172.
    Comments Due: 5 p.m. ET 2/20/14.

    Docket Numbers: ER14-41-001; ER14-42-001; ER12-1911-002; ER12-1912-
002; ER12-1913-002; ER12-1915-002; ER12-1916-002; ER12-1917-002.
    Applicants: RE Rosamond One LLC, RE Rosamond Two LLC, RE McKenzie 1 
LLC, RE McKenzie 2 LLC, RE McKenzie 3 LLC, RE McKenzie 4 LLC, RE 
McKenzie 5 LLC, RE McKenzie 6 LLC.
    Description: Supplement to January 13, 2014 Notice of Non-Material 
Change in Status of KKR MBR Sellers.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5028.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-661-002.
    Applicants: SG2 Imperial Valley LLC.
    Description: Amendment to MBR Tariff Application to be effective 2/
1/2014.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5061.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-1301-000.
    Applicants: Florida Power & Light Company.
    Description: FPL and LCEC Rate Schedule FERC No. 326 to be 
effective 4/11/2014.
    Filed Date: 2/10/14.
    Accession Number: 20140210-5170.
    Comments Due: 5 p.m. ET 3/3/14.

    Docket Numbers: ER14-1302-000.
    Applicants: Seminole Retail Energy Services, L.L.C.
    Description: Initial Filing to be effective 3/10/2014.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5032.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-1303-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 2797 Prairie Wind Transmission & Westar 
Interconnection Agreement to be effective 12/31/9998.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5034.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-1304-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 2795 Prairie Wind Transmission & ITC Great Plains 
Inter. Agreement to be effective 12/31/9998.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5037.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-1305-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 2698 Exelon Generation Company Market Participant 
Agreement to be effective 3/1/2014.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5062.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-1306-000.
    Applicants: Northeast Utilities Service Company, The Connecticut 
Light and Power Company.
    Description: Northeast Utilities Service Company submits 
Cancellation of Black Pond Junction Coke Works Agreement on behalf of 
its subsidiary.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5064.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-1307-000.
    Applicants: Southwestern Electric Power Company.
    Description: SWEPCO-Minden PSA Amendment SPP Integrated Market to 
be effective 3/1/2014.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5073.
    Comments Due: 5 p.m. ET 3/4/14.

    Docket Numbers: ER14-1308-000.
    Applicants: Inland Empire Energy Center, LLC.
    Description: Order No. 784 Compliance Filing to be effective 2/12/
2014.
    Filed Date: 2/11/14.
    Accession Number: 20140211-5074.
    Comments Due: 5 p.m. ET 3/4/14.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.


[[Page 9735]]


    Dated: February 11, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-03636 Filed 2-19-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.