Biweekly Notice, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 9490-9501 [2014-03494]
Download as PDF
9490
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
public-involve/doc-comment/omb/. The
document will be available on the
NRC’s home page site for 60 days after
the signature date of this notice.
Comments submitted in writing or in
electronic form will be made available
for public inspection. Because your
comments will not be edited to remove
any identifying or contact information,
the NRC cautions you against including
any information in your submission that
you do not want to be publicly
disclosed. Comments submitted should
reference Docket No. NRC–2014–0024.
You may submit your comments by any
of the following methods: Electronic
comments go to https://
www.regulations.gov and search for
Docket No. NRC–2014–0024. Mail
comments to the Acting NRC Clearance
Officer, Kristen Benney (T–5 F50), U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001.
Questions about the information
collection requirements may be directed
to the Acting NRC Clearance Officer,
Kristen Benney (T–5 F50), U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, by telephone at 301–
415–6355, or by email to
INFOCOLLECTS.Resource@NRC.GOV.
Dated at Rockville, Maryland, this 12th day
of February 2014.
For the Nuclear Regulatory Commission.
Brenda Miles,
Acting NRC Clearance Officer, Office of
Information Services.
[FR Doc. 2014–03536 Filed 2–18–14; 8:45 am]
I. Accessing Information and
Submitting Comments
BILLING CODE 7590–01–P
A. Accessing Information
NUCLEAR REGULATORY
COMMISSION
[NRC–2014–0028]
Biweekly Notice, Applications and
Amendments to Facility Operating
Licenses and Combined Licenses
Involving No Significant Hazards
Considerations
EMCDONALD on DSK67QTVN1PROD with NOTICES
Background
Pursuant to Section 189a. (2) of the
Atomic Energy Act of 1954, as amended
(the Act), the U.S. Nuclear Regulatory
Commission (NRC) is publishing this
regular biweekly notice. The Act
requires the Commission to publish
notice of any amendments issued, or
proposed to be issued and grants the
Commission the authority to issue and
make immediately effective any
amendment to an operating license or
combined license, as applicable, upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
VerDate Mar<15>2010
16:15 Feb 18, 2014
the pendency before the Commission of
a request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued from January 22,
2014 to February 5, 2014. The last
biweekly notice was published on
January 21, 2014 (79 FR 3412).
ADDRESSES: You may submit comments
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0028. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: 3WFN–06–
44M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on accessing
information and submitting comments,
see ‘‘Accessing Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
SUPPLEMENTARY INFORMATION:
Jkt 232001
Please refer to Docket ID NRC–2014–
0028 when contacting the NRC about
the availability of information regarding
this document. You may access
publicly-available information related to
this document by any of the following
methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0028.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2014–
0028 in the subject line of your
comment submission, in order to ensure
that the NRC is able to make your
comment submission available to the
public in this docket.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in you comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
Notice of Consideration of Issuance of
Amendments to Facility Operating
Licenses and Combined Licenses,
Proposed No Significant Hazards
Consideration Determination, and
Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
§ 50.92 of Title 10 of the Code of Federal
Regulations (10 CFR), this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
E:\FR\FM\19FEN1.SGM
19FEN1
EMCDONALD on DSK67QTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license or
combined license. Requests for a
hearing and a petition for leave to
intervene shall be filed in accordance
with the Commission’s ‘‘Agency Rules
of Practice and Procedure’’ in 10 CFR
Part 2. Interested person(s) should
consult a current copy of 10 CFR 2.309,
which is available at the NRC’s PDR,
located at One White Flint North, Room
O1–F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. The
NRC’s regulations are accessible
electronically from the NRC Library on
the NRC’s Web site at https://
www.nrc.gov/reading-rmdoccollections/cfr/. If a request for a hearing
or petition for leave to intervene is filed
by the above date, the Commission or a
presiding officer designated by the
Commission or by the Chief
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the request and or petition; and
the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s petitioner’s interest. The
petition must also identify the specific
contentions which the requestor
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the requestor petitioner
intends to rely in proving the contention
at the hearing. The requestor petitioner
must also provide references to those
specific sources and documents of
which the petitioner is aware and on
which the requestor petitioner intends
to rely to establish those facts or expert
opinion. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the reques to
petitioner to relief. A request or
petitioner who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
9491
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC’s E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
E:\FR\FM\19FEN1.SGM
19FEN1
EMCDONALD on DSK67QTVN1PROD with NOTICES
9492
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with the NRC
guidance available on the NRC’s public
Web site at https://www.nrc.gov/sitehelp/e-submittals.html. A filing is
considered complete at the time the
documents are submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC’s Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email at
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866 672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, a request to
intervene will require including
information on local residence in order
to demonstrate a proximity assertion of
interest in the proceeding. With respect
to copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice.
Requests for hearing, petitions for leave
to intervene, and motions for leave to
file new or amended contentions that
are filed after the 60-day deadline will
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
not be entertained absent a
determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i)-(iii).
For further details with respect to this
license amendment application, see the
application for amendment which is
available for public inspection at the
NRC’s PDR, located at One White Flint
North, Room O1–F21, 11555 Rockville
Pike (first floor), Rockville, Maryland
20852. Publicly available documents
created or received at the NRC are
accessible electronically through
ADAMS in the NRC Library at https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC’s PDR
Reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov.
Duke Energy Carolinas, LLC, Docket
Nos. 50–369 and 50–370, McGuire
Nuclear Station (MNS) Units 1 and 2,
Mecklenburg County, North Carolina
Date of amendment request:
September 26, 2013.
Description of amendment request:
The amendments requests transition of
the fire protection licensing basis at
MNS, Units 1 and 2, from §§ 50.48(b)
and 50.48(c) of Title 10 of the Code of
Federal Regulations (10 CFR), National
Fire Protection Association (NFPA) 805.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
Criterion 1: Does the proposed amendment
involve a significant increase in the
probability or consequences of an accident
previously evaluated?
Response: No.
Operation of MNS in accordance with the
proposed amendment does not increase the
probability or consequences of accidents
previously evaluated. The Updated Final
Safety Analysis Report documents the
analyses of design basis accidents at MNS.
The proposed amendment does not adversely
affect accident initiators nor alter design
assumptions, conditions, or configurations of
the facility and does not adversely affect the
ability of structures, systems, and
components to perform their design function.
Structures, systems, and components
required to safely shut down the reactor and
to maintain it in a safe shutdown condition
will remain capable of performing their
design functions.
One purpose of this amendment is to
permit MNS to adopt a new fire protection
licensing basis which complies with the
requirements in 10 CFR 50.48(a) and (c) and
E:\FR\FM\19FEN1.SGM
19FEN1
EMCDONALD on DSK67QTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
the guidance in Regulatory Guide (RG) 1.205.
The NRC considers that NFPA 805 provides
an acceptable methodology and performance
criteria for licensees to identify Fire
Protection system and features that are an
acceptable alternative to the Appendix R fire
protection features (69 FR 33536; June 16,
2004). Engineering Analyses, in accordance
with NFPA 805, have been performed to
demonstrate that the risk-informed
performance-based requirements for NFPA
805 have been met.
The NFPA 805, taken as a whole, provides
an acceptable alternative to 10 CFR 50.48(b)
and satisfies 10 CFR 50.48(a) and General
Design Criterion 3 of Appendix A to 10 CFR
Part 50 and meets the underlying intent of
the NRC’s existing fire protection regulations
and guidance, and achieves defense-in-depth
and the goals, performance objectives, and
performance criteria specified in Chapter 1 of
the standard. The increases in core damage
frequency associated with the LAR submittal
are acceptable within the guidance of RG
1.174, therefore this allows self approval of
the fire protection program changes posttransition. If there are any increases posttransition in core damage frequency or risk,
the increase will be small and consistent
with the intent of the Commission’s Safety
Goal Policy.
Based on this, the implementation of this
proposed amendment does not significantly
increase the probability of any accident
previously evaluated. Equipment required to
mitigate an accident remains capable of
performing the assumed function.
Therefore, the consequences of any
accident previously evaluated are not
significantly increased with the
implementation of the amendment.
Criterion 2: Does the proposed amendment
create the possibility of a new or different
kind of accident from any accident
previously evaluated?
Response: No.
Operation of MNS in accordance with the
proposed amendment does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated. Any scenario or previously
analyzed accident with offsite dose was
included in the evaluation of design basis
accidents documented in the Updated Final
Safety Analysis Report. The proposed change
does not alter the requirements or function
for systems required during accident
conditions. Implementation of the new Fire
Protection licensing basis which complies
with the requirements in 10 CFR 50.48(a) and
(c) and the guidance in RG 1.205 will not
result in new or different accidents.
The proposed amendment does not
adversely affect accident initiators nor alter
design assumptions, conditions, or
configurations of the facility. The proposed
amendment does not adversely affect the
ability of structure, systems, and components
to perform their design function. Structure,
systems, and components required to safely
shut down the reactor and maintain it in a
safe shutdown condition remain capable of
performing their design functions.
The purpose of this amendment is to
permit MNS to adopt a new Fire Protection
licensing basis which complies with the
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
requirements in 10 CFR 50.48(a) and (c) and
the guidance in RG 1.205. The NRC considers
that NFPA 805 provides an acceptable
methodology and performance criteria for
licensees to identify Fire Protection systems
and features that are an acceptable alternative
to the Appendix R Fire Protection features
(69 FR 33536; June 16, 2004).
The requirements in NFPA 805 address
only Fire Protection and the impacts of fire
on the plant have already been evaluated.
Based on this, the implementation of this
proposed amendment does not create the
possibility of a new or different kind of
accident from any kind of accident
previously evaluated. The proposed changes
do not involve new failure mechanisms or
malfunctions that can initiate a new accident.
Therefore, the possibility of a new or
different kind of accident from any kind of
accident previously evaluated is not created
with the implementation of this amendment.
Criterion 3: Does the proposed amendment
involve a significant reduction in the margin
of safety?
Response: No.
Operation of MNS in accordance with the
proposed amendment does not involve a
significant reduction in the margin of safety.
The proposed amendment does not alter the
manner in which safety limits, limiting safety
system settings or limiting conditions for
operation are determined. The safety analysis
acceptance criteria are not affected by this
change. The proposed amendment does not
adversely affect existing plant safety margins
or the reliability of equipment assumed to
mitigate accidents in the Updated Final
Safety Analysis Report. The proposed
amendment does not adversely affect the
ability of Structure, Systems, and
Components to perform their design
function. Structure, Systems, and
Components required to safely shut down the
reactor and to maintain it in a safe shutdown
condition remain capable of performing their
design functions.
One purpose of this amendment is to
permit MNS to adopt a new fire protection
licensing basis which complies with the
requirements in 10 CFR 50.48(a) and (c) and
the guidance in RG 1.205. The NRC considers
that NFPA 805 provides an acceptable
methodology and performance criteria for
licensees to identify Fire Protection systems
and features that are an acceptable alternative
to the McGuire Nuclear Station’s existing fire
protection requirements. Engineering
analyses, which may include engineering
evaluations, probabilistic safety assessments,
and fire modeling calculations, have been
performed to demonstrate that the
performance-based methods do not result in
a significant reduction in the margin of
safety.
Based on this, the implementation of this
proposed amendment does not significantly
reduce the margin of safety. The proposed
changes are evaluated to ensure that risk and
safety margins are kept within acceptable
limits. Therefore, the transition does not
involve a significant reduction in the margin
of safety.
The NFPA 805 continues to protect public
health and safety because the overall
approach of NFPA 805 is consistent with the
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
9493
key principles for evaluating license basis
changes, as described in RG 1.174, is
consistent with the defense-in-depth
philosophy, and maintains sufficient safety
margins.
Margins previously established for the
MNS Fire Protection program in accordance
with existing fire protection requirements are
not significantly reduced.
Therefore, this proposed amendment does
not result in a reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lara S. Nichols,
Associate General Counsel, Duke Energy
Corporation, 526 South Church Street—
EC07H, Charlotte, NC 28202.
NRC Branch Chief: Robert J.
Pascarelli.
Duke Energy Carolinas, LLC, Docket
Nos. 50–269, 50–270, and 50–287,
Oconee Nuclear Station (ONS), Units 1,
2, and 3, Oconee County, South
Carolina
Date of amendment request: October
24, 2013.
Description of amendment request:
The proposed amendments would
revise Section 3.1.1.1 of the Updated
Final Safety Analysis Report (UFSAR)
for ONS Units 1, 2, and 3 to clarify
quality requirements of the Standby
Shutdown Facility (SSF) and
interconnected systems.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change involves no change
to the plant design and is intended to ensure
a consistent interpretation of wording
previously included in the UFSAR regarding
the QA classification of certain Structures,
Systems, and Components (SSCs) relied upon
to address a postulated Turbine Building
flood event. The proposed change will help
to ensure the design of the SSF is maintained
consistent with the licensed design. The
proposed UFSAR change does not involve
operating any installed equipment in a new
or different manner or a change to any set
points for parameters which initiate
protective or mitigation action. There is no
adverse impact on containment integrity,
radiological release pathways, fuel design,
filtration systems, main steam relief valve set
E:\FR\FM\19FEN1.SGM
19FEN1
9494
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
EMCDONALD on DSK67QTVN1PROD with NOTICES
points, or radwaste systems. No new
radiological release pathways are created.
Because this correction and clarification to
the UFSAR design description does not alter
the SSF design as licensed, the proposed
change does not involve a significant
increase in the probability or consequences
of any event requiring operation of the SSF.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change requests approval to
modify and clarify a UFSAR design
description to ensure the described design of
the ONS units and the SSF is maintained
consistent with the licensed design. In
accordance with this revision, replacement
equipment is functionally equivalent to the
existing and is designed to the appropriate
pressure, temperature, and environmental
parameters. The proposed change does not
change the design function or operation of
the SSF or of the interconnecting seismic
induced turbine building flood equipment.
Further, the proposed change does not create
a new or different kind of accident since the
proposed changes do not introduce credible
new failure mechanisms, malfunctions, or
accident initiators not considered in the
design and licensing bases.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed change requests approval to
modify and clarify a UFSAR design
description to ensure a consistent
understanding of the licensed design of the
plant, including the SSF. The proposed
change does not change the design function
or operation of the SSF. The proposed change
does not involve operating any installed
equipment in a new or different manner; a
change to any set points for parameters
which initiate protective or mitigation action;
or any impact on the fission product barriers
or safety limits.
Therefore, the proposed changes do not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lara S. Nichols,
Deputy General Counsel, Duke Energy
Corporation, 526 South Church Street—
EC07H, Charlotte, NC 28202–1802.
NRC Branch Chief: Robert J.
Pascarelli.
Entergy Nuclear Vermont Yankee, LLC
and Entergy Nuclear Operations, Inc.,
Docket No. 50–271, Vermont Yankee
Nuclear Power Station, Vernon,
Vermont
Date of amendment request: October
31, 2013.
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
Description of amendment request:
The licensee has indicated their intent
to submit certifications pursuant to Title
10 of the Code of Federal Regulations
(10 CFR) 50.82(a)(1)(i) and (ii) along
with 10 CFR 50.82(a)(2) committing to
the permanent cessation of operations
and the permanent removal of fuel from
the reactor vessel. Following these
certifications, the 10 CFR part 50
operating license will no longer permit
operation of the reactor or placement of
fuel in the reactor vessel. The proposed
amendment includes a number of
changes to revise or eliminate current
requirements found in Section 6.0,
Administrative Controls, of the Vermont
Yankee Technical Specifications to
support a defueled reactor, the new
organization, and the permanent
shutdown of the facility. Proposed
changes include (1) elimination of the
Mitigating Strategies License Condition
in the operating license, (2) revisions to
Section 6.1, Responsibility, regarding
control room command function and
delegation of authority, (3) revisions to
Section 6.2, Organization, to reflect
emphasis on the safe handling and
storage of spent nuclear fuel as opposed
to nuclear plant operations along with
the conversion of license reactor
operators to certified fuel handlers, (4)
elimination of Section 6.3, Actions to be
Taken if a Safety Limit is Exceeded, (5)
revision to Section 6.4, Procedures, to
reflect a permanently defueled reactor
vessel, (6) revision to Section 6.6,
Reporting Requirements, to eliminate
the Core Operating Limits Report, and
(7) revision to Section 6.7, Programs and
Manuals to eliminate the Integrity of
Systems Outside Containment program,
eliminate the Plant Offsite Review
Committee review of changes to the
Offsite Dose Calculation Manual, and
eliminate the Primary Containment
Leakage Rate Testing Program.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration which is presented below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
examined?
Response: No.
The proposed amendment would not take
effect until VY [Vermont Yankee Nuclear
Power Station] has permanently ceased
operation and entered a permanently
defueled condition. The proposed
amendment would modify the VY OL
[operating license] and TS [technical
specifications] by deleting the portions of the
OL and TS that are no longer applicable to
a permanently defueled facility, while
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
modifying the other sections to correspond to
the permanently defueled condition.
The deletion and modification of
provisions of the administrative controls do
not directly affect the design of structures,
systems, and components (SSCs) necessary
for safe storage of irradiated fuel or the
methods used for handling and storage of
such fuel in the fuel pool. The changes to the
administrative controls are administrative in
nature and do not affect any accidents
applicable to the safe management of
irradiated fuel or the permanently shutdown
and defueled condition of the reactor. The
deletion of the Mitigation Strategy License
Condition is also administrative in nature as
the sections of the Order requiring
implementation of the condition have been
rescinded and the controlling regulation in
which the mitigation strategies have been
codified, 10 CFR 50.54(hh), specifies that
these requirements are not applicable in the
permanently defueled condition.
In a permanently defueled condition, the
only credible accident is the fuel handling
accident.
The probability of occurrence of previously
evaluated accidents is not increased, since
extended operation in a defueled condition
will be the only operation allowed, and
therefore bounded by the existing analyses.
Additionally, the occurrence of postulated
accidents associated with reactor operation is
no longer credible in a permanently defueled
reactor. This significantly reduces the scope
of applicable accidents.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes have no impact on
facility SSCs affecting the safe storage of
irradiated fuel, or on the methods of
operation of such SSCs, or on the handling
and storage of irradiated fuel itself. The
administrative removal of an OL condition
[* * *] or modifications of the TS that are
related only to administration of facility
cannot result in different or more adverse
failure modes or accidents than previously
evaluated because the reactor will be
permanently shutdown and defueled and VY
will no longer [be] authorized to operate the
reactor.
The proposed deletion of requirements of
the VY OL and TS do not affect systems
credited in the accident analysis for the fuel
handling accident at VY. The proposed OL
and TS will continue to require proper
control and monitoring of safety significant
parameters and activities.
The proposed amendment does not result
in any new mechanisms that could initiate
damage to the remaining relevant safety
barriers for defueled plants (fuel cladding
and spent fuel cooling). Since extended
operation in a defueled condition will be the
only operation allowed, and therefore
bounded by the existing analyses, such a
condition does not create the possibility of a
new or different kind of accident.
E:\FR\FM\19FEN1.SGM
19FEN1
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
Because the 10 CFR Part 50 license for VY
will no longer authorize operation of the
reactor or emplacement or retention of fuel
into the reactor vessel once the certifications
required by 10 CFR 50.82(a)(1) are submitted,
as specified in 10 CFR 50.82(a)(2), the
occurrence of postulated accidents associated
with reactor operation is no longer credible.
The only remaining credible accident is a
fuel handling accident (FHA). The proposed
amendment does not adversely affect the
inputs or assumptions of any of the design
basis analyses that impact the FHA.
The proposed changes are limited to those
portions of the OL and TS that are not related
to the safe storage of irradiated fuel. The
requirements that are proposed to be revised
or deleted from the VY OL and TS are not
credited in the existing accident analysis for
the remaining applicable postulated accident;
and as such, do not contribute to the margin
of safety associated with the accident
analysis. Postulated DBAs involving the
reactor are no longer possible because the
reactor will be permanently shutdown and
defueled and VY will no longer be authorized
to operate the reactor.
Therefore, the proposed change does not
involve a significant reduction in the margin
of safety.
EMCDONALD on DSK67QTVN1PROD with NOTICES
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Mr. William C.
Dennis, Assistant General Counsel,
Entergy Nuclear Operations, Inc., 440
Hamilton Avenue, White Plains, New
York 10601.
NRC Branch Chief: Benjamin G.
Beasley.
Indiana Michigan Power Company
(IandM), Docket No. 50–315, Donald C.
Cook Nuclear Plant, Unit 1, Berrien
County, Michigan
Date of amendment request: October
8, 2013.
Description of amendment request:
The proposed amendment would
increase the normal reactor coolant
system (RCS) temperature and pressure
at the Donald C. Cook Nuclear Plant,
Unit 1, consistent with the previously
licensed conditions. The proposed
amendment would modify the Unit 1
technical specifications and license
basis associated with this change.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
• SR 3.4.14.1 RCS [Pressure Isolation
Valve (PIV)] Leakage—Surveillance
Requirements
The proposed change to the RCS PIV RCS
pressure range does not significantly increase
the probability or consequences of an
accident previously evaluated in the
[Updated Final Safety Analysis Report
(UFSAR)]. The analytical and evaluation
efforts performed for the [Normal Operating
Pressure/Normal Operating Temperature
(NOP/NOT)] conditions were shown to be
acceptable. The systems and components
(including interface systems and control
systems) will function as designed and all
performance requirements for these systems
remain acceptable. There are no physical
changes being made to the fuel cladding, the
RCS pressure boundary, or the containment.
No significant increase in the consequences
has been identified. The NOP/NOT
conditions do not introduce the possibility of
a change in the frequency of an accident
because the parameter changes are not an
initiator of any accident previously
considered and no new failure modes have
been introduced.
Therefore, neither the probability nor the
consequences of an accident previously
evaluated has been significantly increased.
• SR 3.5.5.1 Seal Injection Flow—
Surveillance Requirements
The proposed change to the pressurizer
pressure range and the elimination of the low
pressure operation does not significantly
increase the probability or consequences of
an accident previously evaluated in the
UFSAR. The analytical and evaluation efforts
performed for the NOP/NOT conditions were
shown to be acceptable. The systems and
components (including interface systems and
control systems) will function as designed
and all performance requirements for these
systems remain acceptable. There are no
physical changes being made to the fuel
cladding, the RCS pressure boundary, or the
containment. No significant increase in the
consequences has been identified. The NOP/
NOT conditions do not introduce the
possibility of a change in the frequency of an
accident because the parameter changes are
not an initiator of any accident previously
considered and no new failure modes have
been introduced.
Therefore, neither the probability nor the
consequences of an accident previously
evaluated has been significantly increased.
• SR 3.6.10.1 Containment Air
Recirculation/Hydrogen Skimmer (CEQ)
System—Surveillance Requirements
The proposed change to the containment
air recirculation fan delay/start times does
not significantly increase the probability or
consequences of an accident previously
evaluated in the UFSAR. The analytical and
evaluation efforts performed for the NOP/
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
9495
NOT conditions were shown to be
acceptable. The systems and components
(including interface systems and control
systems) will function as designed and all
performance requirements for these systems
remain acceptable. There are no physical
changes being made to the fuel cladding, the
RCS pressure boundary, or the containment.
No significant increase in the consequences
has been identified. The NOP/NOT
conditions do not introduce the possibility of
a change in the frequency of an accident
because the parameter changes are not an
initiator of any accident previously
considered and no new failure modes have
been introduced.
Therefore, neither the probability nor the
consequences of an accident previously
evaluated has been significantly increased.
• UFSAR Section 6.3.2, Containment
Spray Systems [CTSs], System Design
The proposed revision to UFSAR Section
6.3.2 specifically recognizes use of the CTS
pump time delay relay in mitigating the
consequences of postulated accidents.
Previously, the setting of this relay was
established to support proper [emergency
diesel generator] bus loading and it was
accounted for as an input to accident
analyses. Use of the time delay relay setting
to mitigate the consequences of an accident
does not significantly increase the probability
or consequences of an accident previously
evaluated in the UFSAR. The analytical and
evaluation efforts performed for the NOP/
NOT conditions were shown to be
acceptable. The systems and components
(including interface systems and control
systems) will function as designed and all
performance requirements for these systems
remain acceptable. There are no physical
changes being made to the fuel cladding, the
RCS pressure boundary, or the containment.
No significant increase in the consequences
has been identified. The NOP/NOT
conditions do not introduce the possibility of
a change in the frequency of an accident
because the parameter changes are not an
initiator of any accident previously
considered and no new failure modes have
been introduced.
Therefore, neither the probability nor the
consequences of an accident previously
evaluated has been significantly increased.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
• SR 3.4.14.1 RCS PIV Leakage—
Surveillance Requirements
The proposed change does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated in the UFSAR. No new accident
scenarios, failure mechanisms, or limiting
single failures are introduced as a result of
the proposed change. This proposed change
has no adverse effects on any safety related
system and does not challenge the
performance or integrity of any safety related
system. The specified RCS pressure functions
support meeting the accident analyses
criteria.
Therefore, the possibility of a new or
different kind of accident from any accident
previously evaluated is not created.
E:\FR\FM\19FEN1.SGM
19FEN1
EMCDONALD on DSK67QTVN1PROD with NOTICES
9496
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
• SR 3.5.5.1 Seal Injection Flow—
Surveillance Requirements
The proposed change does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated in the UFSAR. No new accident
scenarios, failure mechanisms, or limiting
single failures are introduced as a result of
the proposed changes. This proposed change
has no adverse effects on any safety related
system and does not challenge the
performance or integrity of any safety related
system. The specified pressurizer pressure
range supports meeting all of the accident
analyses criteria.
Therefore, the possibility of a new or
different kind of accident from any accident
previously evaluated is not created.
• SR 3.6.10.1 Containment Air
Recirculation/Hydrogen Skimmer (CEQ)
System—Surveillance Requirements
The proposed change does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated in the UFSAR. No new accident
scenarios, failure mechanisms, or limiting
single failures are introduced as a result of
the proposed change. This proposed change
has no adverse effects on any safety related
system and does not challenge the
performance or integrity of any safety related
system. The delay/start time functions
support meeting all of the accident analyses
criteria.
Therefore, the possibility of a new or
different kind of accident from any accident
previously evaluated is not created.
• UFSAR Section 6.3.2, Containment
Spray Systems, System Design
The proposed change does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated in the UFSAR because this change
simply recognizes potential use of the
existing CTS pump time delay relay setting
to mitigate the consequences of an accident.
No new accident scenarios, failure
mechanisms or limiting single failures are
introduced as a result of the proposed
change. This proposed change has no adverse
effects on any safety related system and does
not challenge the performance or integrity of
any safety related system. The delay/start
time functions support meeting all of the
accident analyses criteria.
Therefore, the possibility of a new or
different kind of accident from any accident
previously evaluated is not created.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
• SR 3.4.14.1 RCS PIV Leakage—
Surveillance Requirements
The proposed change does not involve a
significant reduction in a margin of safety.
Analyses and evaluations supporting the
Return to NOP/NOT Program conditions
demonstrate that all acceptance criteria
continue to be met. There are no changes to
the design, material, and construction
standards that are applicable to any System,
Structure, or Component (SSC). There are no
physical changes being made to the fuel
cladding, the RCS pressure boundary, or the
containment. Also, there is no change to a
Design Basis Limit for Fission Product
Barriers (DBLFPB).
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
Therefore, the proposed change does not
involve a significant reduction in margin of
safety.
• SR 3.5.5.1 Seal Injection Flow—
Surveillance Requirements
The proposed change does not involve a
significant reduction in a margin of safety.
Analyses and evaluations supporting the
Return to NOP/NOT Program demonstrate
that all acceptance criteria continue to be
met. There are no changes to the design,
material, and construction standards that are
applicable to any SSC. There are no physical
changes being made to the fuel cladding, the
RCS pressure boundary, or the containment.
Also, there is no change to a DBLFPB.
Therefore, the proposed change does not
involve a significant reduction in margin of
safety.
• SR 3.6.10.1 Containment Air
Recirculation/Hydrogen Skimmer (CEQ)
System—Surveillance Requirements
The proposed change does not involve a
significant reduction in a margin of safety.
Analyses and evaluations supporting the
Return to NOP/NOT Program conditions
demonstrate that all acceptance criteria
continue to be met. There are no changes to
the design, material, and construction
standards that are applicable to the CEQ
System. There are no physical changes being
made to the fuel cladding, the RCS pressure
boundary, or the containment. Also, there is
no change to a DBLFPB.
Therefore, the proposed changes do not
involve a significant reduction in margin of
safety.
• UFSAR Section 6.3.2, Containment
Spray Systems, System Design
The proposed change does not involve a
significant reduction in a margin of safety.
There are no changes to the design, material,
and construction standards that are
applicable to the Containment Spray System.
There are no physical changes being made to
the fuel cladding, the RCS pressure
boundary, or the containment. Also, there is
no change to a DBLFPB.
Therefore, the proposed changes do not
involve a significant reduction in margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Robert B.
Haemer, Senior Nuclear Counsel, One
Cook Place, Bridgman, MI 49106.
NRC Branch Chief: Robert D. Carlson.
Indiana Michigan Power Company
(IandM), Docket Nos. 50–315 and 50–
316, Donald C. Cook Nuclear Plant,
Units 1 and 2, Berrien County, Michigan
Date of amendment request:
November 6, 2013.
Description of amendment request:
The proposed amendment would revise
Technical Specification 3.6.13, Divider
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Barrier Integrity, concerning the divider
barrier seal inspection requirements for
the Donald C. Cook Nuclear Plant, Units
1 and 2.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes do not involve
changes to the installed structures, systems
or components of the facility. The affected
component (divider barrier seal) is not an
accident initiator and therefore, this change
does not involve a significant increase in the
probability of an accident. The proposed
change is considered adequate to ensure
continued operability of the divider barrier.
Since the divider barrier will continue to be
available to perform its accident mitigation
function, the consequences of accidents
previously evaluated are not increased.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change does not introduce a
new mode of plant operation and does not
involve physical modification to the plant.
The change does not introduce new accident
initiators or impact assumptions made in the
safety analysis. Testing requirements
continue to demonstrate that the Limiting
Conditions for Operation are met and the
system components are functional.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change does not exceed or
alter a design basis or safety limit, so there
is no significant reduction in the margin of
safety.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Robert B.
Haemer, Senior Nuclear Counsel, One
Cook Place, Bridgman, MI 49106.
NRC Branch Chief: Robert D. Carlson.
E:\FR\FM\19FEN1.SGM
19FEN1
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
Northern States Power Company—
Minnesota, Docket Nos. 50–282 and 50–
306, Prairie Island Nuclear Generating
Plant, Units 1 and 2, Goodhue County,
Minnesota
EMCDONALD on DSK67QTVN1PROD with NOTICES
Date of amendment request:
December 20, 2013.
Description of amendment request:
The proposed amendments would
revise the Prairie Island Nuclear
Generating Plant, Units 1 and 2,
Emergency Plan to increase the staff
augmentation times for certain
Emergency Response Organization
functions from 30 minutes and 60
minutes to 90 minutes.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed increase in staff
augmentation times has no effect on normal
plant operation or on any accident initiator
or precursors and does not impact the
function of plant structures, systems, or
components (SSCs). The proposed change
does not alter or prevent the ability of the
Emergency Response Organization to perform
their intended functions to mitigate the
consequences of an accident or event. The
ability of the emergency response
organization to respond adequately to
radiological emergencies has been
demonstrated as acceptable through a staffing
analysis as required by 10 CFR Part 50,
Appendix E.IV.A.9.
Therefore, the proposed Emergency Plan
changes do not involve a significant increase
in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change does not impact the
accident analysis. The change does not
involve a physical alteration of the plant (i.e.,
no new or different type of equipment will
be installed), a change in the method of plant
operation, or new operator actions. The
proposed change does not introduce failure
modes that could result in a new accident,
and the change does not alter assumptions
made in the safety analysis. This proposed
change increases the staff augmentation
response times in the Emergency Plan, which
are demonstrated as acceptable through a
staffing analysis as required by 10 CFR Part
50, Appendix E.IV.A.9. The proposed change
does not alter or prevent the ability of the
Emergency Response Organization to perform
their intended functions to mitigate the
consequences of an accident or event.
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
Margin of safety is associated with
confidence in the ability of the fission
product barriers (i.e., fuel cladding, reactor
coolant system pressure boundary, and
containment structure) to limit the level of
radiation dose to the public. The proposed
change is associated with the Emergency
Plan staffing and does not impact operation
of the plant or its response to transients or
accidents. The change does not affect the
Technical Specifications. The proposed
change does not involve a change in the
method of plant operation, and no accident
analyses will be affected by the proposed
change. Safety analysis acceptance criteria
are not affected by this proposed change. The
revised Emergency Plan will continue to
provide the necessary response staff with the
proposed change. A staffing analysis and a
functional analysis were performed for the
proposed change on the timeliness of
performing major tasks for the functional
areas of Emergency Plan. The analysis
concluded that an increase in staff
augmentation times, with the addition of two
on-shift positions, would not significantly
affect the ability to perform the required
Emergency Plan tasks. Therefore, the
proposed change is determined to not
adversely affect the ability to meet 10 CFR
50.54(q)(2), the requirements of 10 CFR Part
50, Appendix E, and the emergency planning
standards as described in 10 CFR 50.47 (b).
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment requests involve no
significant hazards consideration.
Attorney for licensee: Peter M. Glass,
Assistant General Counsel, Xcel Energy
Services, Inc., 414 Nicollet Mall,
Minneapolis, MN 55401
NRC Branch Chief: Robert D. Carlson.
South Carolina Electric and Gas Docket
Nos.: 52–027 and 52–028, Virgil C.
Summer Nuclear Station (VCSNS) Units
2 and 3, Fairfield County, South
Carolina
Date of amendment request:
November 26, 2013.
Description of amendment request:
The proposed change would amend
Combined License Nos. NPF–93 and
NPF–94 for VCSNS Units 2 and 3 by
departing from approved AP1000
Design Control Document (DCD) Tier 2
information as incorporated into the
Updated Final Safety Analysis Report
(UFSAR) to allow use of a new
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
9497
methodology to determine the effective
thermal conductivity resulting from
oxidation of the inorganic zinc (IOZ)
used in the containment vessel coating
system.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
Implementation of a methodology which
specifies an effective thermal conductivity
and oxidation progression for the inorganic
zinc coating of the containment vessel is
used to eliminate non-mechanistic modeling
of inorganic zinc thermal conductivity in the
containment integrity analyses to show that
the value for inorganic zinc thermal
conductivity used in the containment
integrity analyses is conservative, but is not
used to change any of the parameters used in
those analyses. There is no change to any
accident initiator or condition of the
containment that would affect the probability
of any accident. The containment peak
pressure analysis as reported in the UFSAR
is not affected; therefore, the previously
reported consequences are not affected.
Therefore, there is no significant increase
in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed amendment to implement a
methodology which specifies an effective
thermal conductivity and oxidation
progression and effects for the inorganic zinc
coating of the containment vessel is used to
eliminate non-mechanistic modeling of
inorganic zinc thermal conductivity in the
containment integrity analyses to show that
the value for inorganic zinc thermal
conductivity used in the containment
integrity analyses is conservative, but is not
used to change any of the parameters used in
the containment peak pressure analysis. The
change in methodology does not change the
condition of containment; therefore, no new
accident initiator is created. The containment
peak pressure analysis as currently evaluated
is not affected, and the consequences
previously reported are not changed. The
new methodology does not change the
containment; therefore, no new fault or
sequence of events that could lead to
containment failure or release of radioactive
material is created.
Therefore, this activity does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
E:\FR\FM\19FEN1.SGM
19FEN1
9498
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
The proposed implementation of a
methodology which specifies an effective
thermal conductivity and oxidation
progression and effects for the inorganic zinc
coating of the containment vessel is used to
eliminate non-mechanistic modeling of
inorganic zinc thermal conductivity in the
containment integrity analyses to show that
the value for inorganic zinc thermal
conductivity used in the containment
integrity analyses is conservative, but is not
used to change any of the parameters used in
the containment peak pressure analysis. The
change in methodology does not change the
condition of the containment and the
integrity of the containment vessel is not
affected. The containment peak pressure
analysis as currently evaluated is not
affected, and the consequences previously
reported are not changed. No safety analysis
or design basis acceptance limit/criterion is
changed by the proposed change, thus no
margin of safety is reduced.
Therefore, the changes do not involve a
significant reduction in a margin of safety.
EMCDONALD on DSK67QTVN1PROD with NOTICES
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Ms. Kathryn M.
Sutton, Morgan, Lewis & Bockius LLC,
1111 Pennsylvania Avenue NW.,
Washington, DC 20004–2514.
NRC Branch Chief: Lawrence
Burkhart.
South Carolina Electric and Gas Docket
Nos.: 52–027 and 52–028, Virgil C.
Summer Nuclear Station (VCSNS) Units
2 and 3, Fairfield County, South
Carolina
Date of amendment request:
December 17, 2013.
Description of amendment request:
The proposed amendment would revise
the VCSNS Units 2 and 3 Emergency
Plan to facilitate compliance with the
Final Rule for Emergency Planning and
Preparedness published on November
23, 2011. These proposed changes
include the addition of text that (1)
clarifies the distance of the Emergency
Operations Facility from the site, (2)
updates the content of exercise
scenarios to be performed at least once
each exercise cycle, and (3) requires the
Evacuation Time Estimate to be updated
annually between decennial censuses.
This amendment request also proposes
a new license condition to ensure the
completion of a staffing analysis of onshift personnel responsibilities no later
than 180 days before fuel load.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The VCSNS Units 2 and 3 Emergency Plan
provides assurance that the requirements of
emergency preparedness regulations are met.
The changes do not affect the design,
construction, or operation of the nuclear
plant, so there is no change to the probability
or consequences of an accident previously
evaluated.
Adding a license condition related to an
emergency preparedness staffing analysis and
changing the VCSNS Units 2 and 3
Emergency Plan does not affect prevention
and mitigation of abnormal events, e.g.,
accidents, anticipated operational
occurrences, earthquakes, floods and turbine
missiles, or their safety or design analyses as
the purpose of the plan is to implement
emergency preparedness regulations. No
safety-related structure, system, component
(SSC) or function is adversely affected. The
change does not involve nor interface with
any SSC accident initiator or initiating
sequence of events, and thus, the
probabilities of the accidents evaluated in the
UFSAR are not affected. Because the changes
do not involve any SSC or function used to
mitigate an accident, the consequences of the
accidents evaluated in the UFSAR are not
affected.
Therefore, the requested amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The VCSNS Units 2 and 3 Emergency Plan
provides assurance that the requirements of
emergency preparedness regulations are met.
The changes do not affect the design,
construction, or operation of the nuclear
plant, so there is no new or different kind of
accident from any accident previously
evaluated. The changes do not affect safetyrelated equipment, nor do they affect
equipment which, if it failed, could initiate
an accident or a failure of a fission product
barrier. In addition, the changes do not result
in a new failure mode, malfunction, or
sequence of events that could affect safety or
safety-related equipment.
Therefore, the requested amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The VCSNS Units 2 and 3 Emergency Plan
provides assurance that the requirements of
emergency preparedness regulations are met.
The changes do not affect the assessments or
the plant itself. The changes do not affect
safety-related equipment or equipment
whose failure could initiate an accident, nor
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
does it adversely interface with safety-related
equipment or fission product barriers. No
safety analysis or design basis acceptance
limit or criterion is challenged or exceeded
by the requested change.
Therefore, the requested amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Ms. Kathryn M.
Sutton, Morgan, Lewis & Bockius LLC,
1111 Pennsylvania Avenue NW.,
Washington, DC 20004–2514.
NRC Branch Chief: Lawrence
Burkhart.
Notice of Issuance of Amendments to
Facility Operating Licenses and
Combined Licenses
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR Chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or combined license, as
applicable, proposed no significant
hazards consideration determination,
and opportunity for a hearing in
connection with these actions, was
published in the Federal Register as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.22(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) the applications for
amendment, (2) the amendment, and (3)
the Commission’s related letter, Safety
Evaluation and/or Environmental
E:\FR\FM\19FEN1.SGM
19FEN1
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
Assessment as indicated. All of these
items are available for public inspection
at the NRC’s Public Document Room
(PDR), located at One White Flint North,
Room O1–F21, 11555 Rockville Pike
(first floor), Rockville, Maryland 20852.
Publicly available documents created or
received at the NRC are accessible
electronically through the Agencywide
Documents Access and Management
System (ADAMS) in the NRC Library at
https://www.nrc.gov/reading-rm/
adams.html. If you do not have access
to ADAMS or if there are problems in
accessing the documents located in
ADAMS, contact the PDR’s Reference
staff at 1–800–397–4209, 301–415–4737
or by email to pdr.resource@nrc.gov.
EMCDONALD on DSK67QTVN1PROD with NOTICES
Calvert Cliffs Nuclear Power Plant, LLC,
Docket Nos. 50–317 and 50–318, Calvert
Cliffs Nuclear Power Plant, Units 1 and
2, Calvert County, Maryland
Date of application for amendments:
January 28, 2013, as supplemented by
letter dated April 1, 2013.
Brief description of amendments: The
amendments revised Technical
Specification (TS) 1.3, ‘‘Completion
Times’’ Example 1.3–3, TS 3.6.6,
‘‘Containment Spray and Cooling
Systems,’’ TS 3.7.3, ‘‘Auxiliary
Feedwater (AFW) System,’’ TS 3.8.1,
‘‘AC [Alternating Current] SourcesOperating,’’ and TS 3.8.9, ‘‘Distribution
Systems-Operating’’ by eliminating the
second completion time in accordance
with TS Task Force (TSTF)–439–A,
Revision 2, ‘‘Eliminate Second
Completion Times Limiting Time from
Discovery of Failure to Meet an LCO
[limiting condition for operation].’’
Date of issuance: January 29, 2014.
Effective date: As of the date of
issuance to be implemented within 90
days.
Amendment Nos.: 304 and 282.
Renewed Facility Operating License
Nos. DPR–53 and DPR–69: Amendments
revised the License and Technical
Specifications.
Date of initial notice in Federal
Register: May 28, 2013 (78 FR 31981).
The Commission’s related evaluation
of these amendments is contained in a
Safety Evaluation dated January 29,
2014.
No significant hazards consideration
comments received: No.
Dominion Nuclear Connecticut, Inc.,
Docket No. 50–336, Millstone Power
Station, Unit 2 (MPS2), New London
County, Connecticut
Date of amendment request: March
21, 2013.
Description of amendment request:
The amendment would revise Technical
Specification (TS) 3.1.3.7—Control Rod
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
Drive Mechanisms to provide
consistency with the operability
requirements of TS Table 3.3–1, Reactor
Protective Instrumentation, when
control rod drive mechanisms are
energized and capable of withdrawal for
MPS2.
Date of issuance: January 30, 2014.
Effective date: As of the date of
issuance, and shall be implemented
within 60 days.
Amendment No.: 317.
Renewed Facility Operating License
No. DPR–65: Amendment revised the
License and Technical Specifications.
Date of initial notice in Federal
Register: June 11, 2013 (78 FR 35061).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 30,
2014.
No significant hazards consideration
comments received: No.
DTE Electric Company, Docket No. 50–
341, Fermi 2, Monroe County, Michigan
Date of application for amendment:
January 11, 2013.
Brief description of amendment: The
amendment revises the Fermi 2
Technical Specifications (TSs) to riskinform requirements regarding selected
Required Action end states.
Additionally, it would modify the TSs
Required Actions with a Note
prohibiting the use of limiting condition
for operation 3.0.4.a when entering the
preferred end state (Mode 3) on startup.
The changes are consistent with the
NRC’s Technical Specification Task
Force traveler TSTF–423, Revision 1,
‘‘Technical Specifications End States,
NEDC–32988–A,’’ dated December 22,
2009 (ADAMS Accession No.
ML093570241).
Date of issuance: January 17, 2014.
Effective date: As of the date of
issuance and shall be implemented
within 60 days.
Amendment No.: 194.
Facility Operating License No. NPF–
43: Amendment revised the Facility
Operating License and Technical
Specifications.
Date of initial notice in Federal
Register: April 16, 2013 (78 FR 22565).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 17,
2014.
No significant hazards consideration
comments received: No.
Energy Northwest, Docket No. 50–397,
Columbia Generating Station, Benton
County, Washington
Date of application for amendment:
January 31, 2012, as supplemented by
letters dated July 31, August 22, October
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
9499
5, and November 12, 2012, and January
7, April 11, May 9, and August 6, 2013.
Brief description of amendment: The
amendment allows the licensee to
expand the operating domain by the
implementation of Average Power
Range Monitor/Rod Block Monitor/
Technical Specifications/Power Range
Neutron Monitoring/Maximum
Extended Load Line Limit Analysis
(ARTS/PRNM/MELLLA). The Neutron
Monitoring System will be modified by
replacing the Average Power Range
Monitor (APRM) subsystem with the
Nuclear Measurement Analysis and
Control (NUMAC) Power Range Neutron
Monitoring (PRNM) System. The
modification of the PRNM system
replaces analog technology with digital
technology to improve the management
and maintenance of the system. The
licensee will expand the operating
domain to Maximum Extended Load
Line Limit Analysis (MELLLA) and
make changes to certain allowable
values and limits and to the Technical
Specifications (TSs). The changes to the
TSs include the adoption of Technical
Specifications Task Force (TSTF)
Change Traveler TSTF–493, ‘‘Clarify
Application of Setpoint Methodology
for LSSS [Limiting Safety System
Setting] Functions,’’ Option A
surveillance notes. Furthermore, the
amendment allows a change in the
licensing basis to support Anticipated
Transient without Scram accident
mitigation with one Standby Liquid
Control pump instead of two.
Date of Issuance: January 31, 2014.
Effective Date: The license
amendment is effective as of its date of
issuance and shall be implemented
within 60 days thereafter. The Technical
Specification revisions will be
applicable following completion of the
refueling outage (R22) scheduled to
begin May 8, 2015.
Amendment No.: 226.
Renewed Facility Operating License
No. NPF–21: The amendment revised
the Facility Operating License and
Technical Specifications.
Date of Initial Notice in Federal
Register: September 11, 2012 (77 FR
55867). The supplemental letters dated
July 31, August 22, October 5, and
November 12, 2012, and January 7,
April 11, May 9, and August 6, 2013,
provided additional information that
clarified the application, did not expand
the scope of the application as originally
noticed, and did not change the staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
E:\FR\FM\19FEN1.SGM
19FEN1
9500
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
Safety Evaluation dated January 31,
2014.
No significant hazards consideration
comments received: No.
EMCDONALD on DSK67QTVN1PROD with NOTICES
Northern States Power Company—
Minnesota (NSPM), Docket No. 50–263,
Monticello Nuclear Generating Plant
(MNGP), Wright County, Minnesota
Date of application for amendment:
September 18, 2012, as supplemented
on March 12, 2013, July 17, 2013, and
November 15, 2013.
Brief description of amendment: The
amendment revises the MNGP Renewed
Facility Operating License and
Technical Specification (TS) 3.8.3,
‘‘Diesel Fuel Oil, Lube Oil, and Starting
Air,’’ by removing the current stored
diesel fuel oil, and lube oil numerical
volume requirements from the TSs and
replacing them with duration-based
numerical requirements consistent with
TSTF–501, Revision 1.
Date of issuance: January 28, 2014.
Effective date: This license
amendment is effective as of the date of
issuance and shall be implemented
within 60 days from date of issuance.
Amendment No.: 178.
Renewed Facility Operating License
No. DPR–22: Amendment revises the
Renewed Facility Operating License and
Technical Specifications.
Date of initial notice in Federal
Register: December 11, 2012 (77 FR
73689). The licensee’s supplements
dated March 12, 2013, July 17, 2013,
and November 15, 2013, did not change
the scope of the original amendment
request, did not change the NRC staff’s
initial proposed finding of no significant
hazards consideration determination,
and did not expand the scope of the
original Federal Register notice.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 28,
2014.
No significant hazards consideration
comments received: No.
Northern States Power Company—
Minnesota, Docket Nos. 50–282 and 50–
306, Prairie Island Nuclear Generating
Plant, Units 1 and 2, Goodhue County,
Minnesota
Date of application for amendments:
December 13, 2012, as supplemented by
letters dated June 21, 2013, and July 23,
2013.
Brief description of amendments: The
amendments made changes to the
Prairie Island Nuclear Generating Plant
Emergency Plan emergency action level
initiating conditions for the
classification of liquid effluent releases
and for the determination of fuel clad
barrier loss.
VerDate Mar<15>2010
16:15 Feb 18, 2014
Jkt 232001
Date of issuance: January 25, 2014.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Unit 1—210; Unit
2—198.
Renewed Facility Operating License
Nos. DPR–42 and DPR–60: Amendments
revised the Prairie Island Nuclear
Generating Plant Emergency Plan.
Date of initial notice in Federal
Register: March 4, 2013 (78 FR 14134).
The supplemental letters dated June 21,
2013, and July 23, 2013, provided
additional information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the NRC staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 25,
2014.
No significant hazards consideration
comments received: No.
Northern States Power Company—
Minnesota, Docket Nos. 50–263,
Monticello Nuclear Generating Plant,
Wright County, Minnesota
Date of amendment request:
December 21, 2012, as supplemented by
letter dated May 16, 2013.
Brief description of amendments: The
amendment made changes to the
Monticello Nuclear Generating Plant
Emergency Plan by revising the
Emergency Action Level (EAL) setpoint
for the Turbine Building Normal Waste
Sump (TBNWS) Monitor. The change to
the EAL restores indication of an Alert
classification of a liquid effluent release
via the TBNWS pathway to within the
indication range of the applicable
instrumentation.
Date of issuance: January 28, 2014.
Effective date: As of the date of
issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 177.
Renewed Facility Operating License
No. DPR–22: Amendment revised the
Renewed Facility Operating License.
Date of initial notice in Federal
Register: March 4, 2013 (78 FR 14133).
The supplemental letter dated May 16,
2013, provided additional information
that clarified the application, did not
expand the scope of the application as
originally noticed, and did not change
the NRC staff’s original proposed no
significant hazards consideration
determination as published in the
Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Safety Evaluation dated January 28,
2014.
No significant hazards consideration
comments received: No.
Omaha Public Power District, Docket
No. 50–285, Fort Calhoun Station, Unit
1, Washington County, Nebraska
Date of amendment request: April 27,
2012, as supplemented by letter dated
June 27, 2013.
Brief description of amendment: The
amendment revised the Fort Calhoun
Station, Unit 1 (FCS) Technical
Specification (TS) Limiting Condition
for Operation 2.16, ‘‘River Level,’’ and
TS Surveillance Requirement 3.2,
‘‘Equipment and Sampling Tests,’’ and a
related change to the FCS Radiological
Emergency Response Plan to revise two
emergency action levels related to high
water level in the Missouri River.
Date of issuance: January 28, 2014.
Effective date: As of its date of
issuance and shall be implemented
within 120 days from the date of
issuance.
Amendment No.: 274.
Renewed Facility Operating License
No. DPR–40: The amendment revised
the Renewed Facility Operating License
and Technical Specifications.
Date of initial notice in Federal
Register: December 26, 2012 (77 FR
76082). The supplemental letter dated
June 27, 2013, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
safety evaluation dated January 28,
2014.
No significant hazards consideration
comments received: No.
South Carolina Electric & Gas Company,
South Carolina Public Service
Authority, Docket No. 50–395, Virgil C.
Summer Nuclear Station, Unit 1,
Fairfield County, South Carolina
Date of application for amendment:
April 3, 2013.
Brief description of amendment: This
amendment allows for the extension of
the 130-month frequency of the VCSNS
containment integrated leak rate test
(ILRT) or Type A test, that is required
by TS 6.8.4(g) to 15 years on a
permanent basis.
Date of issuance: February 5, 2014.
Effective date: This license
amendment is effective as of the date of
its issuance.
Amendment No.: 194.
E:\FR\FM\19FEN1.SGM
19FEN1
Federal Register / Vol. 79, No. 33 / Wednesday, February 19, 2014 / Notices
Renewed Facility Operating License
No. NPF–12: Amendment revises the
License.
Date of initial notice in Federal
Register: June 25, 2013 (78 FR 38084).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated February 5,
2014.
No significant hazards consideration
comments received: No.
Southern Nuclear Operating Company,
Inc. Docket Nos. 52–025 and 52–026,
Vogtle Electric Generating Plant (VEGP)
Units 3 and 4, Burke County, Georgia
Date of amendment request: July 15,
2013, as supplemented by a letter dated
November 15, 2013.
Brief description of amendment: The
proposed amendment modified design
details related to the construction of
Module CA03 which forms the west
wall of the in-containment refueling
water storage tank. The changes sought
to clarify the materials used in
fabrication of the module, as well as the
design details related to the horizontal
stiffeners used to support the incontainment refueling water storage
tank, and module legs used to anchor
the module in place.
Date of issuance: January 28, 2014.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment No.: Unit 3–17, and Unit
4–17.
Facility Combined Licenses No. NPF–
91 and NPF–92: Amendment revised the
Facility Combined Licenses.
Date of initial notice in Federal
Register: September 3, 2013 (78 FR
54288).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 28,
2014.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 10th day
of February 2014.
For the Nuclear Regulatory Commission.
Michele. G. Evans,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2014–03494 Filed 2–18–14; 8:45 am]
EMCDONALD on DSK67QTVN1PROD with NOTICES
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Sunshine Act Meetings
Weeks of February 17,
24, March 3, 10, 17, 24, 2014.
TIME AND DATE:
16:15 Feb 18, 2014
Week of February 17, 2014
Wednesday, February 19, 2014
9:30 a.m. Briefing on NRC
International Activities (Closed—
Ex. 1 & 9)
1:30 p.m. Briefing on Security Issues
(Closed—Ex. 3)
Thursday, February 20, 2014
9:30 a.m. Briefing on Threat
Environment Assessment (Closed—
Ex. 1)
Week of February 24, 2014—Tentative
There are no meetings scheduled for
the week of February 24, 2014.
Week of March 3, 2014—Tentative
Monday, March 3, 2014
1:30 p.m. Briefing on Human
Reliability Program Activities and
Analyses (Public Meeting)
(Contact: Sean Peters, 301–251–7582)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Tuesday, March 4, 2014
Jkt 232001
call (recording)—301–415–1292.
Contact person for more information:
Rochelle Bavol, 301–415–1651.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify
Kimberly Meyer, NRC Disability
Program Manager, at 301–287–0727, or
by email at Kimberly.Meyer-Chambers@
nrc.gov. Determinations on requests for
reasonable accommodation will be
made on a case-by-case basis.
*
*
*
*
*
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Office of
the Secretary, Washington, DC 20555
(301–415–1969), or send an email to
Darlene.Wright@nrc.gov.
9:00 a.m. Briefing on Security Issues
(Closed—Ex. 1)
1:30 p.m. Briefing on Security Issues
(Closed—Ex. 1)
Dated: February 12, 2014.
Rochelle Bavol,
Policy Coordinator, Office of the Secretary.
Friday, March 7, 2014
BILLING CODE 7590–01–P
10:00 a.m. Meeting with the Advisory
Committee on Reactor Safeguards
(ACRS) (Public Meeting)
(Contact: Ed Hackett, 301–415–7360)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
[FR Doc. 2014–03645 Filed 2–14–14; 4:15 pm]
OCCUPATIONAL SAFETY AND
HEALTH REVIEW COMMISSION
Senior Executive Service Performance
Review Board Membership
There are no meetings scheduled for
the week of March 10, 2014.
Occupational Safety and Health
Review Commission.
ACTION: Annual Notice.
Week of March 17, 2014—Tentative
SUMMARY:
Week of March 10, 2014—Tentative
Friday, March 21, 2014
1:00 p.m. Briefing on Waste
Confidence Rulemaking (Public
Meeting)
(Contact: Andrew Imboden, 301–287–
9220)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Week of March 24, 2014—Tentative
[NRC–2014–0001]
VerDate Mar<15>2010
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
PLACE:
9501
There are no meetings scheduled for
the week of March 24, 2014.
*
*
*
*
*
The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings,
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
AGENCY:
Notice is given under 5 U.S.C.
4314(c)(4) of the appointment of
members to the Performance Review
Board (PRB) of the Occupational Safety
and Health Review Commission.
DATES: Membership is effective on
February 19, 2014.
FOR FURTHER INFORMATION CONTACT:
Linda M. Beard, Human Resources
Specialist, U.S. Occupational Safety and
Health Review Commission, 1120 20th
Street NW., Washington, DC 20036,
(202) 606–5393.
SUPPLEMENTARY INFORMATION: The
Review Commission, as required by 5
U.S.C. 4314(c)(1) through (5), has
established a Senior Executive Service
PRB. The PRB reviews and evaluates the
E:\FR\FM\19FEN1.SGM
19FEN1
Agencies
[Federal Register Volume 79, Number 33 (Wednesday, February 19, 2014)]
[Notices]
[Pages 9490-9501]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-03494]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2014-0028]
Biweekly Notice, Applications and Amendments to Facility
Operating Licenses and Combined Licenses Involving No Significant
Hazards Considerations
Background
Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is
publishing this regular biweekly notice. The Act requires the
Commission to publish notice of any amendments issued, or proposed to
be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This biweekly notice includes all notices of amendments issued, or
proposed to be issued from January 22, 2014 to February 5, 2014. The
last biweekly notice was published on January 21, 2014 (79 FR 3412).
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2014-0028. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section
of this document.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: 3WFN-06-44M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on accessing information and submitting
comments, see ``Accessing Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
SUPPLEMENTARY INFORMATION:
I. Accessing Information and Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC-2014-0028 when contacting the NRC
about the availability of information regarding this document. You may
access publicly-available information related to this document by any
of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2014-0028.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number
for each document referenced in this document (if that document is
available in ADAMS) is provided the first time that a document is
referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2014-0028 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in you
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
Notice of Consideration of Issuance of Amendments to Facility Operating
Licenses and Combined Licenses, Proposed No Significant Hazards
Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Sec. 50.92 of Title 10 of the Code of
Federal Regulations (10 CFR), this means that operation of the facility
in accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received
[[Page 9491]]
within 30 days after the date of publication of this notice will be
considered in making any final determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license or
combined license. Requests for a hearing and a petition for leave to
intervene shall be filed in accordance with the Commission's ``Agency
Rules of Practice and Procedure'' in 10 CFR Part 2. Interested
person(s) should consult a current copy of 10 CFR 2.309, which is
available at the NRC's PDR, located at One White Flint North, Room O1-
F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. The
NRC's regulations are accessible electronically from the NRC Library on
the NRC's Web site at https://www.nrc.gov/reading-rmdoc-collections/cfr/
. If a request for a hearing or petition for leave to intervene is
filed by the above date, the Commission or a presiding officer
designated by the Commission or by the Chief Administrative Judge of
the Atomic Safety and Licensing Board Panel, will rule on the request
and or petition; and the Secretary or the Chief Administrative Judge of
the Atomic Safety and Licensing Board will issue a notice of a hearing
or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's petitioner's interest. The petition must
also identify the specific contentions which the requestor petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the requestor
petitioner shall provide a brief explanation of the bases for the
contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the requestor
petitioner intends to rely in proving the contention at the hearing.
The requestor petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
requestor petitioner intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the reques to petitioner to relief. A request or
petitioner who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, then any hearing
held would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the NRC's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support
[[Page 9492]]
unlisted software, and the NRC Meta System Help Desk will not be able
to offer assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with the NRC guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's Web site
at https://www.nrc.gov/site-help/e-submittals.html, by email at
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866 672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, a request to intervene will require including information on
local residence in order to demonstrate a proximity assertion of
interest in the proceeding. With respect to copyrighted works, except
for limited excerpts that serve the purpose of the adjudicatory filings
and would constitute a Fair Use application, participants are requested
not to include copyrighted materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Requests for hearing,
petitions for leave to intervene, and motions for leave to file new or
amended contentions that are filed after the 60-day deadline will not
be entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i)-(iii).
For further details with respect to this license amendment
application, see the application for amendment which is available for
public inspection at the NRC's PDR, located at One White Flint North,
Room O1-F21, 11555 Rockville Pike (first floor), Rockville, Maryland
20852. Publicly available documents created or received at the NRC are
accessible electronically through ADAMS in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to
ADAMS or who encounter problems in accessing the documents located in
ADAMS, should contact the NRC's PDR Reference staff at 1-800-397-4209,
301-415-4737, or by email to pdr.resource@nrc.gov.
Duke Energy Carolinas, LLC, Docket Nos. 50-369 and 50-370, McGuire
Nuclear Station (MNS) Units 1 and 2, Mecklenburg County, North Carolina
Date of amendment request: September 26, 2013.
Description of amendment request: The amendments requests
transition of the fire protection licensing basis at MNS, Units 1 and
2, from Sec. Sec. 50.48(b) and 50.48(c) of Title 10 of the Code of
Federal Regulations (10 CFR), National Fire Protection Association
(NFPA) 805.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
Criterion 1: Does the proposed amendment involve a significant
increase in the probability or consequences of an accident
previously evaluated?
Response: No.
Operation of MNS in accordance with the proposed amendment does
not increase the probability or consequences of accidents previously
evaluated. The Updated Final Safety Analysis Report documents the
analyses of design basis accidents at MNS. The proposed amendment
does not adversely affect accident initiators nor alter design
assumptions, conditions, or configurations of the facility and does
not adversely affect the ability of structures, systems, and
components to perform their design function. Structures, systems,
and components required to safely shut down the reactor and to
maintain it in a safe shutdown condition will remain capable of
performing their design functions.
One purpose of this amendment is to permit MNS to adopt a new
fire protection licensing basis which complies with the requirements
in 10 CFR 50.48(a) and (c) and
[[Page 9493]]
the guidance in Regulatory Guide (RG) 1.205. The NRC considers that
NFPA 805 provides an acceptable methodology and performance criteria
for licensees to identify Fire Protection system and features that
are an acceptable alternative to the Appendix R fire protection
features (69 FR 33536; June 16, 2004). Engineering Analyses, in
accordance with NFPA 805, have been performed to demonstrate that
the risk-informed performance-based requirements for NFPA 805 have
been met.
The NFPA 805, taken as a whole, provides an acceptable
alternative to 10 CFR 50.48(b) and satisfies 10 CFR 50.48(a) and
General Design Criterion 3 of Appendix A to 10 CFR Part 50 and meets
the underlying intent of the NRC's existing fire protection
regulations and guidance, and achieves defense-in-depth and the
goals, performance objectives, and performance criteria specified in
Chapter 1 of the standard. The increases in core damage frequency
associated with the LAR submittal are acceptable within the guidance
of RG 1.174, therefore this allows self approval of the fire
protection program changes post-transition. If there are any
increases post-transition in core damage frequency or risk, the
increase will be small and consistent with the intent of the
Commission's Safety Goal Policy.
Based on this, the implementation of this proposed amendment
does not significantly increase the probability of any accident
previously evaluated. Equipment required to mitigate an accident
remains capable of performing the assumed function.
Therefore, the consequences of any accident previously evaluated
are not significantly increased with the implementation of the
amendment.
Criterion 2: Does the proposed amendment create the possibility
of a new or different kind of accident from any accident previously
evaluated?
Response: No.
Operation of MNS in accordance with the proposed amendment does
not create the possibility of a new or different kind of accident
from any accident previously evaluated. Any scenario or previously
analyzed accident with offsite dose was included in the evaluation
of design basis accidents documented in the Updated Final Safety
Analysis Report. The proposed change does not alter the requirements
or function for systems required during accident conditions.
Implementation of the new Fire Protection licensing basis which
complies with the requirements in 10 CFR 50.48(a) and (c) and the
guidance in RG 1.205 will not result in new or different accidents.
The proposed amendment does not adversely affect accident
initiators nor alter design assumptions, conditions, or
configurations of the facility. The proposed amendment does not
adversely affect the ability of structure, systems, and components
to perform their design function. Structure, systems, and components
required to safely shut down the reactor and maintain it in a safe
shutdown condition remain capable of performing their design
functions.
The purpose of this amendment is to permit MNS to adopt a new
Fire Protection licensing basis which complies with the requirements
in 10 CFR 50.48(a) and (c) and the guidance in RG 1.205. The NRC
considers that NFPA 805 provides an acceptable methodology and
performance criteria for licensees to identify Fire Protection
systems and features that are an acceptable alternative to the
Appendix R Fire Protection features (69 FR 33536; June 16, 2004).
The requirements in NFPA 805 address only Fire Protection and
the impacts of fire on the plant have already been evaluated. Based
on this, the implementation of this proposed amendment does not
create the possibility of a new or different kind of accident from
any kind of accident previously evaluated. The proposed changes do
not involve new failure mechanisms or malfunctions that can initiate
a new accident.
Therefore, the possibility of a new or different kind of
accident from any kind of accident previously evaluated is not
created with the implementation of this amendment.
Criterion 3: Does the proposed amendment involve a significant
reduction in the margin of safety?
Response: No.
Operation of MNS in accordance with the proposed amendment does
not involve a significant reduction in the margin of safety. The
proposed amendment does not alter the manner in which safety limits,
limiting safety system settings or limiting conditions for operation
are determined. The safety analysis acceptance criteria are not
affected by this change. The proposed amendment does not adversely
affect existing plant safety margins or the reliability of equipment
assumed to mitigate accidents in the Updated Final Safety Analysis
Report. The proposed amendment does not adversely affect the ability
of Structure, Systems, and Components to perform their design
function. Structure, Systems, and Components required to safely shut
down the reactor and to maintain it in a safe shutdown condition
remain capable of performing their design functions.
One purpose of this amendment is to permit MNS to adopt a new
fire protection licensing basis which complies with the requirements
in 10 CFR 50.48(a) and (c) and the guidance in RG 1.205. The NRC
considers that NFPA 805 provides an acceptable methodology and
performance criteria for licensees to identify Fire Protection
systems and features that are an acceptable alternative to the
McGuire Nuclear Station's existing fire protection requirements.
Engineering analyses, which may include engineering evaluations,
probabilistic safety assessments, and fire modeling calculations,
have been performed to demonstrate that the performance-based
methods do not result in a significant reduction in the margin of
safety.
Based on this, the implementation of this proposed amendment
does not significantly reduce the margin of safety. The proposed
changes are evaluated to ensure that risk and safety margins are
kept within acceptable limits. Therefore, the transition does not
involve a significant reduction in the margin of safety.
The NFPA 805 continues to protect public health and safety
because the overall approach of NFPA 805 is consistent with the key
principles for evaluating license basis changes, as described in RG
1.174, is consistent with the defense-in-depth philosophy, and
maintains sufficient safety margins.
Margins previously established for the MNS Fire Protection
program in accordance with existing fire protection requirements are
not significantly reduced.
Therefore, this proposed amendment does not result in a
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lara S. Nichols, Associate General Counsel,
Duke Energy Corporation, 526 South Church Street--EC07H, Charlotte, NC
28202.
NRC Branch Chief: Robert J. Pascarelli.
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287,
Oconee Nuclear Station (ONS), Units 1, 2, and 3, Oconee County, South
Carolina
Date of amendment request: October 24, 2013.
Description of amendment request: The proposed amendments would
revise Section 3.1.1.1 of the Updated Final Safety Analysis Report
(UFSAR) for ONS Units 1, 2, and 3 to clarify quality requirements of
the Standby Shutdown Facility (SSF) and interconnected systems.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change involves no change to the plant design and
is intended to ensure a consistent interpretation of wording
previously included in the UFSAR regarding the QA classification of
certain Structures, Systems, and Components (SSCs) relied upon to
address a postulated Turbine Building flood event. The proposed
change will help to ensure the design of the SSF is maintained
consistent with the licensed design. The proposed UFSAR change does
not involve operating any installed equipment in a new or different
manner or a change to any set points for parameters which initiate
protective or mitigation action. There is no adverse impact on
containment integrity, radiological release pathways, fuel design,
filtration systems, main steam relief valve set
[[Page 9494]]
points, or radwaste systems. No new radiological release pathways
are created. Because this correction and clarification to the UFSAR
design description does not alter the SSF design as licensed, the
proposed change does not involve a significant increase in the
probability or consequences of any event requiring operation of the
SSF.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change requests approval to modify and clarify a
UFSAR design description to ensure the described design of the ONS
units and the SSF is maintained consistent with the licensed design.
In accordance with this revision, replacement equipment is
functionally equivalent to the existing and is designed to the
appropriate pressure, temperature, and environmental parameters. The
proposed change does not change the design function or operation of
the SSF or of the interconnecting seismic induced turbine building
flood equipment. Further, the proposed change does not create a new
or different kind of accident since the proposed changes do not
introduce credible new failure mechanisms, malfunctions, or accident
initiators not considered in the design and licensing bases.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed change requests approval to modify and clarify a
UFSAR design description to ensure a consistent understanding of the
licensed design of the plant, including the SSF. The proposed change
does not change the design function or operation of the SSF. The
proposed change does not involve operating any installed equipment
in a new or different manner; a change to any set points for
parameters which initiate protective or mitigation action; or any
impact on the fission product barriers or safety limits.
Therefore, the proposed changes do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lara S. Nichols, Deputy General Counsel,
Duke Energy Corporation, 526 South Church Street--EC07H, Charlotte, NC
28202-1802.
NRC Branch Chief: Robert J. Pascarelli.
Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations,
Inc., Docket No. 50-271, Vermont Yankee Nuclear Power Station, Vernon,
Vermont
Date of amendment request: October 31, 2013.
Description of amendment request: The licensee has indicated their
intent to submit certifications pursuant to Title 10 of the Code of
Federal Regulations (10 CFR) 50.82(a)(1)(i) and (ii) along with 10 CFR
50.82(a)(2) committing to the permanent cessation of operations and the
permanent removal of fuel from the reactor vessel. Following these
certifications, the 10 CFR part 50 operating license will no longer
permit operation of the reactor or placement of fuel in the reactor
vessel. The proposed amendment includes a number of changes to revise
or eliminate current requirements found in Section 6.0, Administrative
Controls, of the Vermont Yankee Technical Specifications to support a
defueled reactor, the new organization, and the permanent shutdown of
the facility. Proposed changes include (1) elimination of the
Mitigating Strategies License Condition in the operating license, (2)
revisions to Section 6.1, Responsibility, regarding control room
command function and delegation of authority, (3) revisions to Section
6.2, Organization, to reflect emphasis on the safe handling and storage
of spent nuclear fuel as opposed to nuclear plant operations along with
the conversion of license reactor operators to certified fuel handlers,
(4) elimination of Section 6.3, Actions to be Taken if a Safety Limit
is Exceeded, (5) revision to Section 6.4, Procedures, to reflect a
permanently defueled reactor vessel, (6) revision to Section 6.6,
Reporting Requirements, to eliminate the Core Operating Limits Report,
and (7) revision to Section 6.7, Programs and Manuals to eliminate the
Integrity of Systems Outside Containment program, eliminate the Plant
Offsite Review Committee review of changes to the Offsite Dose
Calculation Manual, and eliminate the Primary Containment Leakage Rate
Testing Program.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously examined?
Response: No.
The proposed amendment would not take effect until VY [Vermont
Yankee Nuclear Power Station] has permanently ceased operation and
entered a permanently defueled condition. The proposed amendment
would modify the VY OL [operating license] and TS [technical
specifications] by deleting the portions of the OL and TS that are
no longer applicable to a permanently defueled facility, while
modifying the other sections to correspond to the permanently
defueled condition.
The deletion and modification of provisions of the
administrative controls do not directly affect the design of
structures, systems, and components (SSCs) necessary for safe
storage of irradiated fuel or the methods used for handling and
storage of such fuel in the fuel pool. The changes to the
administrative controls are administrative in nature and do not
affect any accidents applicable to the safe management of irradiated
fuel or the permanently shutdown and defueled condition of the
reactor. The deletion of the Mitigation Strategy License Condition
is also administrative in nature as the sections of the Order
requiring implementation of the condition have been rescinded and
the controlling regulation in which the mitigation strategies have
been codified, 10 CFR 50.54(hh), specifies that these requirements
are not applicable in the permanently defueled condition.
In a permanently defueled condition, the only credible accident
is the fuel handling accident.
The probability of occurrence of previously evaluated accidents
is not increased, since extended operation in a defueled condition
will be the only operation allowed, and therefore bounded by the
existing analyses. Additionally, the occurrence of postulated
accidents associated with reactor operation is no longer credible in
a permanently defueled reactor. This significantly reduces the scope
of applicable accidents.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes have no impact on facility SSCs affecting
the safe storage of irradiated fuel, or on the methods of operation
of such SSCs, or on the handling and storage of irradiated fuel
itself. The administrative removal of an OL condition [* * *] or
modifications of the TS that are related only to administration of
facility cannot result in different or more adverse failure modes or
accidents than previously evaluated because the reactor will be
permanently shutdown and defueled and VY will no longer [be]
authorized to operate the reactor.
The proposed deletion of requirements of the VY OL and TS do not
affect systems credited in the accident analysis for the fuel
handling accident at VY. The proposed OL and TS will continue to
require proper control and monitoring of safety significant
parameters and activities.
The proposed amendment does not result in any new mechanisms
that could initiate damage to the remaining relevant safety barriers
for defueled plants (fuel cladding and spent fuel cooling). Since
extended operation in a defueled condition will be the only
operation allowed, and therefore bounded by the existing analyses,
such a condition does not create the possibility of a new or
different kind of accident.
[[Page 9495]]
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
Because the 10 CFR Part 50 license for VY will no longer
authorize operation of the reactor or emplacement or retention of
fuel into the reactor vessel once the certifications required by 10
CFR 50.82(a)(1) are submitted, as specified in 10 CFR 50.82(a)(2),
the occurrence of postulated accidents associated with reactor
operation is no longer credible. The only remaining credible
accident is a fuel handling accident (FHA). The proposed amendment
does not adversely affect the inputs or assumptions of any of the
design basis analyses that impact the FHA.
The proposed changes are limited to those portions of the OL and
TS that are not related to the safe storage of irradiated fuel. The
requirements that are proposed to be revised or deleted from the VY
OL and TS are not credited in the existing accident analysis for the
remaining applicable postulated accident; and as such, do not
contribute to the margin of safety associated with the accident
analysis. Postulated DBAs involving the reactor are no longer
possible because the reactor will be permanently shutdown and
defueled and VY will no longer be authorized to operate the reactor.
Therefore, the proposed change does not involve a significant
reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William C. Dennis, Assistant General
Counsel, Entergy Nuclear Operations, Inc., 440 Hamilton Avenue, White
Plains, New York 10601.
NRC Branch Chief: Benjamin G. Beasley.
Indiana Michigan Power Company (IandM), Docket No. 50-315, Donald C.
Cook Nuclear Plant, Unit 1, Berrien County, Michigan
Date of amendment request: October 8, 2013.
Description of amendment request: The proposed amendment would
increase the normal reactor coolant system (RCS) temperature and
pressure at the Donald C. Cook Nuclear Plant, Unit 1, consistent with
the previously licensed conditions. The proposed amendment would modify
the Unit 1 technical specifications and license basis associated with
this change.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
SR 3.4.14.1 RCS [Pressure Isolation Valve (PIV)]
Leakage--Surveillance Requirements
The proposed change to the RCS PIV RCS pressure range does not
significantly increase the probability or consequences of an
accident previously evaluated in the [Updated Final Safety Analysis
Report (UFSAR)]. The analytical and evaluation efforts performed for
the [Normal Operating Pressure/Normal Operating Temperature (NOP/
NOT)] conditions were shown to be acceptable. The systems and
components (including interface systems and control systems) will
function as designed and all performance requirements for these
systems remain acceptable. There are no physical changes being made
to the fuel cladding, the RCS pressure boundary, or the containment.
No significant increase in the consequences has been identified. The
NOP/NOT conditions do not introduce the possibility of a change in
the frequency of an accident because the parameter changes are not
an initiator of any accident previously considered and no new
failure modes have been introduced.
Therefore, neither the probability nor the consequences of an
accident previously evaluated has been significantly increased.
SR 3.5.5.1 Seal Injection Flow--Surveillance
Requirements
The proposed change to the pressurizer pressure range and the
elimination of the low pressure operation does not significantly
increase the probability or consequences of an accident previously
evaluated in the UFSAR. The analytical and evaluation efforts
performed for the NOP/NOT conditions were shown to be acceptable.
The systems and components (including interface systems and control
systems) will function as designed and all performance requirements
for these systems remain acceptable. There are no physical changes
being made to the fuel cladding, the RCS pressure boundary, or the
containment. No significant increase in the consequences has been
identified. The NOP/NOT conditions do not introduce the possibility
of a change in the frequency of an accident because the parameter
changes are not an initiator of any accident previously considered
and no new failure modes have been introduced.
Therefore, neither the probability nor the consequences of an
accident previously evaluated has been significantly increased.
SR 3.6.10.1 Containment Air Recirculation/Hydrogen
Skimmer (CEQ) System--Surveillance Requirements
The proposed change to the containment air recirculation fan
delay/start times does not significantly increase the probability or
consequences of an accident previously evaluated in the UFSAR. The
analytical and evaluation efforts performed for the NOP/NOT
conditions were shown to be acceptable. The systems and components
(including interface systems and control systems) will function as
designed and all performance requirements for these systems remain
acceptable. There are no physical changes being made to the fuel
cladding, the RCS pressure boundary, or the containment. No
significant increase in the consequences has been identified. The
NOP/NOT conditions do not introduce the possibility of a change in
the frequency of an accident because the parameter changes are not
an initiator of any accident previously considered and no new
failure modes have been introduced.
Therefore, neither the probability nor the consequences of an
accident previously evaluated has been significantly increased.
UFSAR Section 6.3.2, Containment Spray Systems [CTSs],
System Design
The proposed revision to UFSAR Section 6.3.2 specifically
recognizes use of the CTS pump time delay relay in mitigating the
consequences of postulated accidents. Previously, the setting of
this relay was established to support proper [emergency diesel
generator] bus loading and it was accounted for as an input to
accident analyses. Use of the time delay relay setting to mitigate
the consequences of an accident does not significantly increase the
probability or consequences of an accident previously evaluated in
the UFSAR. The analytical and evaluation efforts performed for the
NOP/NOT conditions were shown to be acceptable. The systems and
components (including interface systems and control systems) will
function as designed and all performance requirements for these
systems remain acceptable. There are no physical changes being made
to the fuel cladding, the RCS pressure boundary, or the containment.
No significant increase in the consequences has been identified. The
NOP/NOT conditions do not introduce the possibility of a change in
the frequency of an accident because the parameter changes are not
an initiator of any accident previously considered and no new
failure modes have been introduced.
Therefore, neither the probability nor the consequences of an
accident previously evaluated has been significantly increased.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
SR 3.4.14.1 RCS PIV Leakage--Surveillance Requirements
The proposed change does not create the possibility of a new or
different kind of accident from any accident previously evaluated in
the UFSAR. No new accident scenarios, failure mechanisms, or
limiting single failures are introduced as a result of the proposed
change. This proposed change has no adverse effects on any safety
related system and does not challenge the performance or integrity
of any safety related system. The specified RCS pressure functions
support meeting the accident analyses criteria.
Therefore, the possibility of a new or different kind of
accident from any accident previously evaluated is not created.
[[Page 9496]]
SR 3.5.5.1 Seal Injection Flow--Surveillance
Requirements
The proposed change does not create the possibility of a new or
different kind of accident from any accident previously evaluated in
the UFSAR. No new accident scenarios, failure mechanisms, or
limiting single failures are introduced as a result of the proposed
changes. This proposed change has no adverse effects on any safety
related system and does not challenge the performance or integrity
of any safety related system. The specified pressurizer pressure
range supports meeting all of the accident analyses criteria.
Therefore, the possibility of a new or different kind of
accident from any accident previously evaluated is not created.
SR 3.6.10.1 Containment Air Recirculation/Hydrogen
Skimmer (CEQ) System--Surveillance Requirements
The proposed change does not create the possibility of a new or
different kind of accident from any accident previously evaluated in
the UFSAR. No new accident scenarios, failure mechanisms, or
limiting single failures are introduced as a result of the proposed
change. This proposed change has no adverse effects on any safety
related system and does not challenge the performance or integrity
of any safety related system. The delay/start time functions support
meeting all of the accident analyses criteria.
Therefore, the possibility of a new or different kind of
accident from any accident previously evaluated is not created.
UFSAR Section 6.3.2, Containment Spray Systems, System
Design
The proposed change does not create the possibility of a new or
different kind of accident from any accident previously evaluated in
the UFSAR because this change simply recognizes potential use of the
existing CTS pump time delay relay setting to mitigate the
consequences of an accident. No new accident scenarios, failure
mechanisms or limiting single failures are introduced as a result of
the proposed change. This proposed change has no adverse effects on
any safety related system and does not challenge the performance or
integrity of any safety related system. The delay/start time
functions support meeting all of the accident analyses criteria.
Therefore, the possibility of a new or different kind of
accident from any accident previously evaluated is not created.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
SR 3.4.14.1 RCS PIV Leakage--Surveillance Requirements
The proposed change does not involve a significant reduction in
a margin of safety. Analyses and evaluations supporting the Return
to NOP/NOT Program conditions demonstrate that all acceptance
criteria continue to be met. There are no changes to the design,
material, and construction standards that are applicable to any
System, Structure, or Component (SSC). There are no physical changes
being made to the fuel cladding, the RCS pressure boundary, or the
containment. Also, there is no change to a Design Basis Limit for
Fission Product Barriers (DBLFPB).
Therefore, the proposed change does not involve a significant
reduction in margin of safety.
SR 3.5.5.1 Seal Injection Flow--Surveillance
Requirements
The proposed change does not involve a significant reduction in
a margin of safety. Analyses and evaluations supporting the Return
to NOP/NOT Program demonstrate that all acceptance criteria continue
to be met. There are no changes to the design, material, and
construction standards that are applicable to any SSC. There are no
physical changes being made to the fuel cladding, the RCS pressure
boundary, or the containment. Also, there is no change to a DBLFPB.
Therefore, the proposed change does not involve a significant
reduction in margin of safety.
SR 3.6.10.1 Containment Air Recirculation/Hydrogen
Skimmer (CEQ) System--Surveillance Requirements
The proposed change does not involve a significant reduction in
a margin of safety. Analyses and evaluations supporting the Return
to NOP/NOT Program conditions demonstrate that all acceptance
criteria continue to be met. There are no changes to the design,
material, and construction standards that are applicable to the CEQ
System. There are no physical changes being made to the fuel
cladding, the RCS pressure boundary, or the containment. Also, there
is no change to a DBLFPB.
Therefore, the proposed changes do not involve a significant
reduction in margin of safety.
UFSAR Section 6.3.2, Containment Spray Systems, System
Design
The proposed change does not involve a significant reduction in
a margin of safety. There are no changes to the design, material,
and construction standards that are applicable to the Containment
Spray System. There are no physical changes being made to the fuel
cladding, the RCS pressure boundary, or the containment. Also, there
is no change to a DBLFPB.
Therefore, the proposed changes do not involve a significant
reduction in margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Robert B. Haemer, Senior Nuclear Counsel,
One Cook Place, Bridgman, MI 49106.
NRC Branch Chief: Robert D. Carlson.
Indiana Michigan Power Company (IandM), Docket Nos. 50-315 and 50-316,
Donald C. Cook Nuclear Plant, Units 1 and 2, Berrien County, Michigan
Date of amendment request: November 6, 2013.
Description of amendment request: The proposed amendment would
revise Technical Specification 3.6.13, Divider Barrier Integrity,
concerning the divider barrier seal inspection requirements for the
Donald C. Cook Nuclear Plant, Units 1 and 2.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes do not involve changes to the installed
structures, systems or components of the facility. The affected
component (divider barrier seal) is not an accident initiator and
therefore, this change does not involve a significant increase in
the probability of an accident. The proposed change is considered
adequate to ensure continued operability of the divider barrier.
Since the divider barrier will continue to be available to perform
its accident mitigation function, the consequences of accidents
previously evaluated are not increased.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not introduce a new mode of plant
operation and does not involve physical modification to the plant.
The change does not introduce new accident initiators or impact
assumptions made in the safety analysis. Testing requirements
continue to demonstrate that the Limiting Conditions for Operation
are met and the system components are functional.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change does not exceed or alter a design basis or
safety limit, so there is no significant reduction in the margin of
safety.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Robert B. Haemer, Senior Nuclear Counsel,
One Cook Place, Bridgman, MI 49106.
NRC Branch Chief: Robert D. Carlson.
[[Page 9497]]
Northern States Power Company--Minnesota, Docket Nos. 50-282 and 50-
306, Prairie Island Nuclear Generating Plant, Units 1 and 2, Goodhue
County, Minnesota
Date of amendment request: December 20, 2013.
Description of amendment request: The proposed amendments would
revise the Prairie Island Nuclear Generating Plant, Units 1 and 2,
Emergency Plan to increase the staff augmentation times for certain
Emergency Response Organization functions from 30 minutes and 60
minutes to 90 minutes.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed increase in staff augmentation times has no effect
on normal plant operation or on any accident initiator or precursors
and does not impact the function of plant structures, systems, or
components (SSCs). The proposed change does not alter or prevent the
ability of the Emergency Response Organization to perform their
intended functions to mitigate the consequences of an accident or
event. The ability of the emergency response organization to respond
adequately to radiological emergencies has been demonstrated as
acceptable through a staffing analysis as required by 10 CFR Part
50, Appendix E.IV.A.9.
Therefore, the proposed Emergency Plan changes do not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change does not impact the accident analysis. The
change does not involve a physical alteration of the plant (i.e., no
new or different type of equipment will be installed), a change in
the method of plant operation, or new operator actions. The proposed
change does not introduce failure modes that could result in a new
accident, and the change does not alter assumptions made in the
safety analysis. This proposed change increases the staff
augmentation response times in the Emergency Plan, which are
demonstrated as acceptable through a staffing analysis as required
by 10 CFR Part 50, Appendix E.IV.A.9. The proposed change does not
alter or prevent the ability of the Emergency Response Organization
to perform their intended functions to mitigate the consequences of
an accident or event.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
Margin of safety is associated with confidence in the ability of
the fission product barriers (i.e., fuel cladding, reactor coolant
system pressure boundary, and containment structure) to limit the
level of radiation dose to the public. The proposed change is
associated with the Emergency Plan staffing and does not impact
operation of the plant or its response to transients or accidents.
The change does not affect the Technical Specifications. The
proposed change does not involve a change in the method of plant
operation, and no accident analyses will be affected by the proposed
change. Safety analysis acceptance criteria are not affected by this
proposed change. The revised Emergency Plan will continue to provide
the necessary response staff with the proposed change. A staffing
analysis and a functional analysis were performed for the proposed
change on the timeliness of performing major tasks for the
functional areas of Emergency Plan. The analysis concluded that an
increase in staff augmentation times, with the addition of two on-
shift positions, would not significantly affect the ability to
perform the required Emergency Plan tasks. Therefore, the proposed
change is determined to not adversely affect the ability to meet 10
CFR 50.54(q)(2), the requirements of 10 CFR Part 50, Appendix E, and
the emergency planning standards as described in 10 CFR 50.47 (b).
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment requests involve no significant hazards consideration.
Attorney for licensee: Peter M. Glass, Assistant General Counsel,
Xcel Energy Services, Inc., 414 Nicollet Mall, Minneapolis, MN 55401
NRC Branch Chief: Robert D. Carlson.
South Carolina Electric and Gas Docket Nos.: 52-027 and 52-028, Virgil
C. Summer Nuclear Station (VCSNS) Units 2 and 3, Fairfield County,
South Carolina
Date of amendment request: November 26, 2013.
Description of amendment request: The proposed change would amend
Combined License Nos. NPF-93 and NPF-94 for VCSNS Units 2 and 3 by
departing from approved AP1000 Design Control Document (DCD) Tier 2
information as incorporated into the Updated Final Safety Analysis
Report (UFSAR) to allow use of a new methodology to determine the
effective thermal conductivity resulting from oxidation of the
inorganic zinc (IOZ) used in the containment vessel coating system.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
Implementation of a methodology which specifies an effective
thermal conductivity and oxidation progression for the inorganic
zinc coating of the containment vessel is used to eliminate non-
mechanistic modeling of inorganic zinc thermal conductivity in the
containment integrity analyses to show that the value for inorganic
zinc thermal conductivity used in the containment integrity analyses
is conservative, but is not used to change any of the parameters
used in those analyses. There is no change to any accident initiator
or condition of the containment that would affect the probability of
any accident. The containment peak pressure analysis as reported in
the UFSAR is not affected; therefore, the previously reported
consequences are not affected.
Therefore, there is no significant increase in the probability
or consequences of an accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed amendment to implement a methodology which
specifies an effective thermal conductivity and oxidation
progression and effects for the inorganic zinc coating of the
containment vessel is used to eliminate non-mechanistic modeling of
inorganic zinc thermal conductivity in the containment integrity
analyses to show that the value for inorganic zinc thermal
conductivity used in the containment integrity analyses is
conservative, but is not used to change any of the parameters used
in the containment peak pressure analysis. The change in methodology
does not change the condition of containment; therefore, no new
accident initiator is created. The containment peak pressure
analysis as currently evaluated is not affected, and the
consequences previously reported are not changed. The new
methodology does not change the containment; therefore, no new fault
or sequence of events that could lead to containment failure or
release of radioactive material is created.
Therefore, this activity does not create the possibility of a
new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
[[Page 9498]]
The proposed implementation of a methodology which specifies an
effective thermal conductivity and oxidation progression and effects
for the inorganic zinc coating of the containment vessel is used to
eliminate non-mechanistic modeling of inorganic zinc thermal
conductivity in the containment integrity analyses to show that the
value for inorganic zinc thermal conductivity used in the
containment integrity analyses is conservative, but is not used to
change any of the parameters used in the containment peak pressure
analysis. The change in methodology does not change the condition of
the containment and the integrity of the containment vessel is not
affected. The containment peak pressure analysis as currently
evaluated is not affected, and the consequences previously reported
are not changed. No safety analysis or design basis acceptance
limit/criterion is changed by the proposed change, thus no margin of
safety is reduced.
Therefore, the changes do not involve a significant reduction in
a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis &
Bockius LLC, 1111 Pennsylvania Avenue NW., Washington, DC 20004-2514.
NRC Branch Chief: Lawrence Burkhart.
South Carolina Electric and Gas Docket Nos.: 52-027 and 52-028, Virgil
C. Summer Nuclear Station (VCSNS) Units 2 and 3, Fairfield County,
South Carolina
Date of amendment request: December 17, 2013.
Description of amendment request: The proposed amendment would
revise the VCSNS Units 2 and 3 Emergency Plan to facilitate compliance
with the Final Rule for Emergency Planning and Preparedness published
on November 23, 2011. These proposed changes include the addition of
text that (1) clarifies the distance of the Emergency Operations
Facility from the site, (2) updates the content of exercise scenarios
to be performed at least once each exercise cycle, and (3) requires the
Evacuation Time Estimate to be updated annually between decennial
censuses. This amendment request also proposes a new license condition
to ensure the completion of a staffing analysis of on-shift personnel
responsibilities no later than 180 days before fuel load.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The VCSNS Units 2 and 3 Emergency Plan provides assurance that
the requirements of emergency preparedness regulations are met. The
changes do not affect the design, construction, or operation of the
nuclear plant, so there is no change to the probability or
consequences of an accident previously evaluated.
Adding a license condition related to an emergency preparedness
staffing analysis and changing the VCSNS Units 2 and 3 Emergency
Plan does not affect prevention and mitigation of abnormal events,
e.g., accidents, anticipated operational occurrences, earthquakes,
floods and turbine missiles, or their safety or design analyses as
the purpose of the plan is to implement emergency preparedness
regulations. No safety-related structure, system, component (SSC) or
function is adversely affected. The change does not involve nor
interface with any SSC accident initiator or initiating sequence of
events, and thus, the probabilities of the accidents evaluated in
the UFSAR are not affected. Because the changes do not involve any
SSC or function used to mitigate an accident, the consequences of
the accidents evaluated in the UFSAR are not affected.
Therefore, the requested amendment does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The VCSNS Units 2 and 3 Emergency Plan provides assurance that
the requirements of emergency preparedness regulations are met. The
changes do not affect the design, construction, or operation of the
nuclear plant, so there is no new or different kind of accident from
any accident previously evaluated. The changes do not affect safety-
related equipment, nor do they affect equipment which, if it failed,
could initiate an accident or a failure of a fission product
barrier. In addition, the changes do not result in a new failure
mode, malfunction, or sequence of events that could affect safety or
safety-related equipment.
Therefore, the requested amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The VCSNS Units 2 and 3 Emergency Plan provides assurance that
the requirements of emergency preparedness regulations are met. The
changes do not affect the assessments or the plant itself. The
changes do not affect safety-related equipment or equipment whose
failure could initiate an accident, nor does it adversely interface
with safety-related equipment or fission product barriers. No safety
analysis or design basis acceptance limit or criterion is challenged
or exceeded by the requested change.
Therefore, the requested amendment does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis &
Bockius LLC, 1111 Pennsylvania Avenue NW., Washington, DC 20004-2514.
NRC Branch Chief: Lawrence Burkhart.
Notice of Issuance of Amendments to Facility Operating Licenses and
Combined Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR Chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed no
significant hazards consideration determination, and opportunity for a
hearing in connection with these actions, was published in the Federal
Register as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation and/or Environmental
[[Page 9499]]
Assessment as indicated. All of these items are available for public
inspection at the NRC's Public Document Room (PDR), located at One
White Flint North, Room O1-F21, 11555 Rockville Pike (first floor),
Rockville, Maryland 20852. Publicly available documents created or
received at the NRC are accessible electronically through the
Agencywide Documents Access and Management System (ADAMS) in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. If you do not have
access to ADAMS or if there are problems in accessing the documents
located in ADAMS, contact the PDR's Reference staff at 1-800-397-4209,
301-415-4737 or by email to pdr.resource@nrc.gov.
Calvert Cliffs Nuclear Power Plant, LLC, Docket Nos. 50-317 and 50-318,
Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Calvert County,
Maryland
Date of application for amendments: January 28, 2013, as
supplemented by letter dated April 1, 2013.
Brief description of amendments: The amendments revised Technical
Specification (TS) 1.3, ``Completion Times'' Example 1.3-3, TS 3.6.6,
``Containment Spray and Cooling Systems,'' TS 3.7.3, ``Auxiliary
Feedwater (AFW) System,'' TS 3.8.1, ``AC [Alternating Current] Sources-
Operating,'' and TS 3.8.9, ``Distribution Systems-Operating'' by
eliminating the second completion time in accordance with TS Task Force
(TSTF)-439-A, Revision 2, ``Eliminate Second Completion Times Limiting
Time from Discovery of Failure to Meet an LCO [limiting condition for
operation].''
Date of issuance: January 29, 2014.
Effective date: As of the date of issuance to be implemented within
90 days.
Amendment Nos.: 304 and 282.
Renewed Facility Operating License Nos. DPR-53 and DPR-69:
Amendments revised the License and Technical Specifications.
Date of initial notice in Federal Register: May 28, 2013 (78 FR
31981).
The Commission's related evaluation of these amendments is
contained in a Safety Evaluation dated January 29, 2014.
No significant hazards consideration comments received: No.
Dominion Nuclear Connecticut, Inc., Docket No. 50-336, Millstone Power
Station, Unit 2 (MPS2), New London County, Connecticut
Date of amendment request: March 21, 2013.
Description of amendment request: The amendment would revise
Technical Specification (TS) 3.1.3.7--Control Rod Drive Mechanisms to
provide consistency with the operability requirements of TS Table 3.3-
1, Reactor Protective Instrumentation, when control rod drive
mechanisms are energized and capable of withdrawal for MPS2.
Date of issuance: January 30, 2014.
Effective date: As of the date of issuance, and shall be
implemented within 60 days.
Amendment No.: 317.
Renewed Facility Operating License No. DPR-65: Amendment revised
the License and Technical Specifications.
Date of initial notice in Federal Register: June 11, 2013 (78 FR
35061).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 30, 2014.
No significant hazards consideration comments received: No.
DTE Electric Company, Docket No. 50-341, Fermi 2, Monroe County,
Michigan
Date of application for amendment: January 11, 2013.
Brief description of amendment: The amendment revises the Fermi 2
Technical Specifications (TSs) to risk-inform requirements regarding
selected Required Action end states. Additionally, it would modify the
TSs Required Actions with a Note prohibiting the use of limiting
condition for operation 3.0.4.a when entering the preferred end state
(Mode 3) on startup. The changes are consistent with the NRC's
Technical Specification Task Force traveler TSTF-423, Revision 1,
``Technical Specifications End States, NEDC-32988-A,'' dated December
22, 2009 (ADAMS Accession No. ML093570241).
Date of issuance: January 17, 2014.
Effective date: As of the date of issuance and shall be implemented
within 60 days.
Amendment No.: 194.
Facility Operating License No. NPF-43: Amendment revised the
Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: April 16, 2013 (78 FR
22565).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 17, 2014.
No significant hazards consideration comments received: No.
Energy Northwest, Docket No. 50-397, Columbia Generating Station,
Benton County, Washington
Date of application for amendment: January 31, 2012, as
supplemented by letters dated July 31, August 22, October 5, and
November 12, 2012, and January 7, April 11, May 9, and August 6, 2013.
Brief description of amendment: The amendment allows the licensee
to expand the operating domain by the implementation of Average Power
Range Monitor/Rod Block Monitor/Technical Specifications/Power Range
Neutron Monitoring/Maximum Extended Load Line Limit Analysis (ARTS/
PRNM/MELLLA). The Neutron Monitoring System will be modified by
replacing the Average Power Range Monitor (APRM) subsystem with the
Nuclear Measurement Analysis and Control (NUMAC) Power Range Neutron
Monitoring (PRNM) System. The modification of the PRNM system replaces
analog technology with digital technology to improve the management and
maintenance of the system. The licensee will expand the operating
domain to Maximum Extended Load Line Limit Analysis (MELLLA) and make
changes to certain allowable values and limits and to the Technical
Specifications (TSs). The changes to the TSs include the adoption of
Technical Specifications Task Force (TSTF) Change Traveler TSTF-493,
``Clarify Application of Setpoint Methodology for LSSS [Limiting Safety
System Setting] Functions,'' Option A surveillance notes. Furthermore,
the amendment allows a change in the licensing basis to support
Anticipated Transient without Scram accident mitigation with one
Standby Liquid Control pump instead of two.
Date of Issuance: January 31, 2014.
Effective Date: The license amendment is effective as of its date
of issuance and shall be implemented within 60 days thereafter. The
Technical Specification revisions will be applicable following
completion of the refueling outage (R22) scheduled to begin May 8,
2015.
Amendment No.: 226.
Renewed Facility Operating License No. NPF-21: The amendment
revised the Facility Operating License and Technical Specifications.
Date of Initial Notice in Federal Register: September 11, 2012 (77
FR 55867). The supplemental letters dated July 31, August 22, October
5, and November 12, 2012, and January 7, April 11, May 9, and August 6,
2013, provided additional information that clarified the application,
did not expand the scope of the application as originally noticed, and
did not change the staff's original proposed no significant hazards
consideration determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a
[[Page 9500]]
Safety Evaluation dated January 31, 2014.
No significant hazards consideration comments received: No.
Northern States Power Company--Minnesota (NSPM), Docket No. 50-263,
Monticello Nuclear Generating Plant (MNGP), Wright County, Minnesota
Date of application for amendment: September 18, 2012, as
supplemented on March 12, 2013, July 17, 2013, and November 15, 2013.
Brief description of amendment: The amendment revises the MNGP
Renewed Facility Operating License and Technical Specification (TS)
3.8.3, ``Diesel Fuel Oil, Lube Oil, and Starting Air,'' by removing the
current stored diesel fuel oil, and lube oil numerical volume
requirements from the TSs and replacing them with duration-based
numerical requirements consistent with TSTF-501, Revision 1.
Date of issuance: January 28, 2014.
Effective date: This license amendment is effective as of the date
of issuance and shall be implemented within 60 days from date of
issuance.
Amendment No.: 178.
Renewed Facility Operating License No. DPR-22: Amendment revises
the Renewed Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: December 11, 2012 (77
FR 73689). The licensee's supplements dated March 12, 2013, July 17,
2013, and November 15, 2013, did not change the scope of the original
amendment request, did not change the NRC staff's initial proposed
finding of no significant hazards consideration determination, and did
not expand the scope of the original Federal Register notice.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 28, 2014.
No significant hazards consideration comments received: No.
Northern States Power Company--Minnesota, Docket Nos. 50-282 and 50-
306, Prairie Island Nuclear Generating Plant, Units 1 and 2, Goodhue
County, Minnesota
Date of application for amendments: December 13, 2012, as
supplemented by letters dated June 21, 2013, and July 23, 2013.
Brief description of amendments: The amendments made changes to the
Prairie Island Nuclear Generating Plant Emergency Plan emergency action
level initiating conditions for the classification of liquid effluent
releases and for the determination of fuel clad barrier loss.
Date of issuance: January 25, 2014.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Unit 1--210; Unit 2--198.
Renewed Facility Operating License Nos. DPR-42 and DPR-60:
Amendments revised the Prairie Island Nuclear Generating Plant
Emergency Plan.
Date of initial notice in Federal Register: March 4, 2013 (78 FR
14134). The supplemental letters dated June 21, 2013, and July 23,
2013, provided additional information that clarified the application,
did not expand the scope of the application as originally noticed, and
did not change the NRC staff's original proposed no significant hazards
consideration determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 25, 2014.
No significant hazards consideration comments received: No.
Northern States Power Company--Minnesota, Docket Nos. 50-263,
Monticello Nuclear Generating Plant, Wright County, Minnesota
Date of amendment request: December 21, 2012, as supplemented by
letter dated May 16, 2013.
Brief description of amendments: The amendment made changes to the
Monticello Nuclear Generating Plant Emergency Plan by revising the
Emergency Action Level (EAL) setpoint for the Turbine Building Normal
Waste Sump (TBNWS) Monitor. The change to the EAL restores indication
of an Alert classification of a liquid effluent release via the TBNWS
pathway to within the indication range of the applicable
instrumentation.
Date of issuance: January 28, 2014.
Effective date: As of the date of issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 177.
Renewed Facility Operating License No. DPR-22: Amendment revised
the Renewed Facility Operating License.
Date of initial notice in Federal Register: March 4, 2013 (78 FR
14133). The supplemental letter dated May 16, 2013, provided additional
information that clarified the application, did not expand the scope of
the application as originally noticed, and did not change the NRC
staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 28, 2014.
No significant hazards consideration comments received: No.
Omaha Public Power District, Docket No. 50-285, Fort Calhoun Station,
Unit 1, Washington County, Nebraska
Date of amendment request: April 27, 2012, as supplemented by
letter dated June 27, 2013.
Brief description of amendment: The amendment revised the Fort
Calhoun Station, Unit 1 (FCS) Technical Specification (TS) Limiting
Condition for Operation 2.16, ``River Level,'' and TS Surveillance
Requirement 3.2, ``Equipment and Sampling Tests,'' and a related change
to the FCS Radiological Emergency Response Plan to revise two emergency
action levels related to high water level in the Missouri River.
Date of issuance: January 28, 2014.
Effective date: As of its date of issuance and shall be implemented
within 120 days from the date of issuance.
Amendment No.: 274.
Renewed Facility Operating License No. DPR-40: The amendment
revised the Renewed Facility Operating License and Technical
Specifications.
Date of initial notice in Federal Register: December 26, 2012 (77
FR 76082). The supplemental letter dated June 27, 2013, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a safety evaluation dated January 28, 2014.
No significant hazards consideration comments received: No.
South Carolina Electric & Gas Company, South Carolina Public Service
Authority, Docket No. 50-395, Virgil C. Summer Nuclear Station, Unit 1,
Fairfield County, South Carolina
Date of application for amendment: April 3, 2013.
Brief description of amendment: This amendment allows for the
extension of the 130-month frequency of the VCSNS containment
integrated leak rate test (ILRT) or Type A test, that is required by TS
6.8.4(g) to 15 years on a permanent basis.
Date of issuance: February 5, 2014.
Effective date: This license amendment is effective as of the date
of its issuance.
Amendment No.: 194.
[[Page 9501]]
Renewed Facility Operating License No. NPF-12: Amendment revises
the License.
Date of initial notice in Federal Register: June 25, 2013 (78 FR
38084).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated February 5, 2014.
No significant hazards consideration comments received: No.
Southern Nuclear Operating Company, Inc. Docket Nos. 52-025 and 52-026,
Vogtle Electric Generating Plant (VEGP) Units 3 and 4, Burke County,
Georgia
Date of amendment request: July 15, 2013, as supplemented by a
letter dated November 15, 2013.
Brief description of amendment: The proposed amendment modified
design details related to the construction of Module CA03 which forms
the west wall of the in-containment refueling water storage tank. The
changes sought to clarify the materials used in fabrication of the
module, as well as the design details related to the horizontal
stiffeners used to support the in-containment refueling water storage
tank, and module legs used to anchor the module in place.
Date of issuance: January 28, 2014.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment No.: Unit 3-17, and Unit 4-17.
Facility Combined Licenses No. NPF-91 and NPF-92: Amendment revised
the Facility Combined Licenses.
Date of initial notice in Federal Register: September 3, 2013 (78
FR 54288).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 28, 2014.
No significant hazards consideration comments received: No.
Dated at Rockville, Maryland, this 10th day of February 2014.
For the Nuclear Regulatory Commission.
Michele. G. Evans,
Director, Division of Operating Reactor Licensing, Office of Nuclear
Reactor Regulation.
[FR Doc. 2014-03494 Filed 2-18-14; 8:45 am]
BILLING CODE 7590-01-P