Download as PDF Federal Register / Vol. 79, No. 31 / Friday, February 14, 2014 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–66–000] mstockstill on DSK4VPTVN1PROD with NOTICES Columbia Gas Transmission, LLC; Prior Notice of Activity Under Blanket Certificate On January 31, 2014, Columbia Gas Transmission, LLC (Columbia) filed with the Federal Energy Regulatory Commission (Commission) an application under section 7 of the Natural Gas Act and Sections 157.205 and 157.210 of the Commission’s regulations and Columbia’s blanket authorization in CP83–76–000, 22 FERC 62,029 (1983). Columbia seeks authorization to increase the horsepower of two existing compressor units at its Lost River Compressor Station located in Hardy County, West Virginia by 520 HP per unit. The facility changes are needed to maintain reliability levels for all current Station operating levels. Questions regarding this application may be directed to Fredric J. George, Senior Counsel, Columbia Gas Transmission, LLC, P.O. Box 1273, Charleston, West Virginia 25325–1273 by calling (304) 357–2359 or via fax at 304 357–3206. Pursuant to Section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review (NSER). If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a NSER will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the VerDate Mar<15>2010 17:47 Feb 13, 2014 Jkt 232001 request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such motions or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant, on or before the comment date. It is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 7, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–03196 Filed 2–13–14; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 8949 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC14–8–000] Commission Information Collection Activities (FERC–521); Comment Request; Extension Federal Energy Regulatory Commission, Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC–521 (Payments for Benefits from Headwater Benefits). DATES: Comments on the collection of information are due April 15, 2014. ADDRESSES: You may submit comments (identified by Docket No. IC14–8–000) by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: Payments for Benefits From Headwater Benefits. OMB Control No.: 1902–0087. Type of Request: Three-year extension of the FERC–521 information collection requirements with no changes to the current reporting requirements. Abstract: The information collected under the requirements of FERC–521 is used by the Commission to implement the statutory provisions of Section 10(f) SUMMARY: E:\FR\FM\14FEN1.SGM 14FEN1

Agencies

[Federal Register Volume 79, Number 31 (Friday, February 14, 2014)]
[Notices]
[Page 8949]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-03196]



[[Page 8949]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-66-000]


Columbia Gas Transmission, LLC; Prior Notice of Activity Under 
Blanket Certificate

    On January 31, 2014, Columbia Gas Transmission, LLC (Columbia) 
filed with the Federal Energy Regulatory Commission (Commission) an 
application under section 7 of the Natural Gas Act and Sections 157.205 
and 157.210 of the Commission's regulations and Columbia's blanket 
authorization in CP83-76-000, 22 FERC 62,029 (1983). Columbia seeks 
authorization to increase the horsepower of two existing compressor 
units at its Lost River Compressor Station located in Hardy County, 
West Virginia by 520 HP per unit. The facility changes are needed to 
maintain reliability levels for all current Station operating levels.
    Questions regarding this application may be directed to Fredric J. 
George, Senior Counsel, Columbia Gas Transmission, LLC, P.O. Box 1273, 
Charleston, West Virginia 25325-1273 by calling (304) 357-2359 or via 
fax at 304 357-3206.
    Pursuant to Section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review (NSER). If a Notice of 
Schedule for Environmental Review is issued, it will indicate, among 
other milestones, the anticipated date for the Commission staff's 
issuance of the final environmental impact statement (FEIS) or EA for 
this proposal. The filing of the EA in the Commission's public record 
for this proceeding or the issuance of a NSER will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the NGA.
    Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a notice of intervention or motion to intervene, as appropriate. 
Such motions or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant, on or before the comment date. It is 
not necessary to serve motions to intervene or protests on persons 
other than the Applicant.
    The Commission encourages electronic submission of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: February 7, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-03196 Filed 2-13-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.