New Hampshire Wood Products Company Bath Electric Power Company LLC; Notice of Transfer of Exemption, 7661-7662 [2014-02741]
Download as PDF
Federal Register / Vol. 79, No. 27 / Monday, February 10, 2014 / Notices
elibrary.asp. Enter the docket number
(P–14568–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: February 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02743 Filed 2–7–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7684–001]
mstockstill on DSK4VPTVN1PROD with NOTICES
Sharon and Marcia Leishman; Notice
of Termination of Exemption by
Implied Surrender and Soliciting
Comments and Protests
Take notice that the following
hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of
exemption by implied surrender
b. Project No.: 7684–001
c. Date Initiated: February 3, 2014
d. Exemptee: Sharon and Marcia
Leishman
e. Name and Location of Project: The
Leishman Irrigation System Project is
located on the irrigation tailwater
collection system on the Leishman’s
property in Kittitas County,
Washington.
f. Filed Pursuant to: 18 CFR 4.106
g. Exemptee Contact Information:
Sharon Leishman (425) 235–8118
h. FERC Contact: Krista Sakallaris,
(202) 502–6302, Krista.Sakallaris@
ferc.gov.
i. Deadline for filing comments and
protests is 30 days from the issuance of
this notice by the Commission. Please
file your submittal electronically via the
Internet (eFiling) in lieu of paper. Please
refer to the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp and
filing instructions in the Commission’s
Regulations at 18 CFR section
385.2001(a)(1)(iii). To assist you with
eFilings you should refer to the
submission guidelines document at
https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition,
certain filing requirements have
statutory or regulatory formatting and
other instructions. You should refer to
a list of these ‘‘qualified documents’’ at
https://www.ferc.gov/docs-filing/efiling/
filing.pdf. You must include your name
and contact information at the end of
your comments. Please include the
project number (P–7684–001) on any
VerDate Mar<15>2010
19:25 Feb 07, 2014
Jkt 232001
documents or motions filed. The
Commission strongly encourages
electronic filings; otherwise, you should
submit an original and seven copies of
any submittal to the following address:
The Secretary, Federal Energy
Regulatory Commission, Mail Code:
DHAC, PJ–12, 888 First Street NE.,
Washington, DC 20426.
j. Description of Project Facilities: (1)
A 1,100-foot-long, 12-inch-diameter
PVC pipeline; (2) a powerhouse
containing two generating units with
rated capacities of 25 kW and 7.5 kW
and a combined annual energy
production of 60 MWh; and (3) a
discharge conduit.
k. Description of Proceeding: The
exemptee is in violation of Standard
Article 1 of its exemption, which was
granted April 6, 1984 (27 FERC
¶61,074). The Commission’s regulation,
18 CFR 4.106, provides, among other
things, that the Commission reserves the
right to revoke an exemption if any term
or condition of the exemption is
violated.
Commission records indicate that the
project stopped operating sometime
between 1996 and 1999. After several
years of correspondence regarding
restoring operation to the project or
surrounding the exemption, the
exemptee has become non-responsive.
On December 16, 2013, the Commission
sent a letter indicating that the
exemptee must file a plan and schedule
to restore operation or surrender the
project, failure to do so would result in
an implied surrender. To date, the
exemptee has not filed a response and
the project remains inoperable.
l. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–7684–001)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments and Protests—Anyone
may submit comments or protests in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210 and 385.211. In determining the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
7661
appropriate action to take, the
Commission will consider all protests
filed. Any protests must be received on
or before the specified deadline date for
the particular proceeding.
o. Filing and Service of Responsive
Documents—Any filing must (1) bear in
all capital letters the title ‘‘COMMENTS
or ‘‘PROTEST,’’ as applicable; (2) set
forth in the heading the project number
of the proceeding to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting or protesting; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments or protests must set forth
their evidentiary basis and otherwise
comply with the requirements of 18 CFR
4.34(b). All comments or protests
should relate to project works which are
the subject of the termination of
exemption. A copy of any protest must
be served upon each representative of
the exemptee specified in item g above.
A copy of all other filings in reference
to this notice must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: February 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02742 Filed 2–7–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4609–007]
New Hampshire Wood Products
Company Bath Electric Power
Company LLC; Notice of Transfer of
Exemption
1. By letter filed November 26, 2013,
Bath Electric Power Company LLC
parent company of New Hampshire
Wood Products Company informed the
Commission that the exemption from
licensing for the Ammonoosuc River
Dam Project, FERC No. 4609, originally
issued January 11, 1982,1 has been
1 18 FERC ¶ 62,026, Notice of Approval by
Operation of Law.
E:\FR\FM\10FEN1.SGM
10FEN1
7662
Federal Register / Vol. 79, No. 27 / Monday, February 10, 2014 / Notices
transferred to Bath Electric Power
Company LLC. The project is located on
the Ammonoosuc River in Grafton
County, New Hampshire. The transfer of
an exemption does not require
Commission approval.
2. Bath Electric Power Company LLC
is now the exemptee of the
Ammonoosuc River Dam Project, FERC
No. 4609. All correspondence should be
forwarded to: Bath Electric Power
Company LLC, 112 Terrace Drive, North
Haverhill, NH 03774.
Dated: Issued February 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02741 Filed 2–7–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4542–014]
Bacon Felt Company, Inc., Salmon
Falls Power & Light Company, LLC;
Notice of Transfer of Exemption
1. By letter filed August 12, 2013,
Bacon Felt Company, Inc. informed the
Commission that the exemption from
licensing for the Boston Felt Project,
FERC No. 4542, originally issued
August 29, 1983,1 has been transferred
to Salmon Falls Power & Light
Company, LLC. The project is located
on the Salmon Falls River in Strafford
County, New Hampshire. The transfer of
an exemption does not require
Commission approval.
2. Salmon Falls Power & Light
Company, LLC, located at P.O. Box 9,
South Casco, ME 04077, is now the
exemptee of the Boston Felt Project,
FERC No. 4542.
Dated: Issued February 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02740 Filed 2–7–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
mstockstill on DSK4VPTVN1PROD with NOTICES
Inquiry To Learn Whether Businesses
Assert Business
Confidentiality Claims Regarding
Waste Import and Export
1 24 FERC ¶ 62,240, Order Granting Exemption
From Licensing of A Small Project of 5 Megawatts
or Less.
19:25 Feb 07, 2014
Jkt 232001
ACTION:
Notice; request for comment.
The Environmental Protection
Agency (EPA) receives from time to time
Freedom of Information Act (FOIA)
requests for documentation received or
issued by EPA or data contained in EPA
database systems pertaining to the
export and import of Resource
Conservation and Recovery Act (RCRA)
hazardous waste from/to the United
States, the export of cathode ray tubes
(CRTs) and spent lead acid batteries
(SLABs) from the United States, and the
export and import of RCRA universal
waste from/to the United States. These
documents and data may identify or
reference multiple parties, and describe
transactions involving the movement of
specified materials in which the parties
propose to participate or have
participated. The purpose of this notice
is to inform ‘‘affected businesses’’ about
the documents or data sought by these
types of FOIA requests in order to
provide the businesses with the
opportunity to assert claims that any of
the information sought that pertains to
them is entitled to treatment as
confidential business information (CBI),
and to send comments to EPA
supporting their claims for such
treatment. Certain businesses, however,
do not meet the definition of ‘‘affected
business,’’ and are not covered by
today’s notice. They consist of any
business that actually submitted to EPA
any document at issue pursuant to
applicable RCRA regulatory
requirements and did not assert a CBI
claim as to information that pertains to
that business in connection with the
document at the time of its submission;
they have waived their right to do so at
a later time. Nevertheless, other
businesses identified or referenced in
the documents that were submitted to
EPA by the submitting business may
have a right to assert a CBI claim
concerning information that pertains to
them and may do so in response to this
notice.
SUMMARY:
Comments must be received on
or before March 12, 2014. The period for
submission of comments may be
extended if, before the comments are
due, you make a request for an
extension of the comment period and it
is approved by the EPA legal office.
Except in extraordinary circumstances,
the EPA legal office will not approve
such an extension without the consent
of any person whose request for release
of the information under the FOIA is
pending.
DATES:
[EPA–HQ–OECA–2014–0021; FRL–9906–
39–OECA]
VerDate Mar<15>2010
Environmental Protection
Agency (EPA).
AGENCY:
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Submit your comments,
identified by Docket ID No. EPA–HQ–
OECA–2014–0021, by one of the
following methods:
• https://www.regulations.gov: Follow
the on-line instructions for submitting
comments.
• Email: kreisler.eva@epa.gov.
• Address: Eva Kreisler, International
Compliance Assurance Division, Office
of Federal Activities, Office of
Enforcement and Compliance
Assurance, Environmental Protection
Agency, Mailcode: 2254A, 1200
Pennsylvania Ave. NW., Washington,
DC 20460.
Instructions: Direct your comments to
Docket ID No. EPA–HQ–OECA–2014–
0021. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through https://
www.regulations.gov or email.
Instructions about how to submit
comments claimed as CBI are given later
in this notice.
The https://www.regulations.gov Web
site is an ‘‘anonymous access’’ system,
which means EPA will not know your
identity or contact information unless
you provide it in the body of your
comment. If you send an email
comment directly to EPA without going
through https://www.regulations.gov,
your email address will be
automatically captured and included as
part of the comment that is placed in the
public docket and made available on the
Internet. If you submit an electronic
comment, EPA recommends that you
include your name and other contact
information in the body of your
comment. Please include your name and
other contact information with any disk
or CD–ROM you submit by mail. If EPA
cannot read your comment due to
technical difficulties and cannot contact
you for clarification, EPA may not be
able to consider your comment.
Electronic files should avoid the use of
special characters, any form of
encryption, and be free of any defects or
viruses. For additional information
about EPA’s public docket visit the EPA
Docket Center homepage at https://
www.epa.gov/epahome/dockets.htm.
Docket: All documents in the docket
are listed in the https://
www.regulations.gov index. Although
listed in the index, some information is
ADDRESSES:
E:\FR\FM\10FEN1.SGM
10FEN1
Agencies
[Federal Register Volume 79, Number 27 (Monday, February 10, 2014)]
[Notices]
[Pages 7661-7662]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-02741]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4609-007]
New Hampshire Wood Products Company Bath Electric Power Company
LLC; Notice of Transfer of Exemption
1. By letter filed November 26, 2013, Bath Electric Power Company
LLC parent company of New Hampshire Wood Products Company informed the
Commission that the exemption from licensing for the Ammonoosuc River
Dam Project, FERC No. 4609, originally issued January 11, 1982,\1\ has
been
[[Page 7662]]
transferred to Bath Electric Power Company LLC. The project is located
on the Ammonoosuc River in Grafton County, New Hampshire. The transfer
of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 18 FERC ] 62,026, Notice of Approval by Operation of Law.
---------------------------------------------------------------------------
2. Bath Electric Power Company LLC is now the exemptee of the
Ammonoosuc River Dam Project, FERC No. 4609. All correspondence should
be forwarded to: Bath Electric Power Company LLC, 112 Terrace Drive,
North Haverhill, NH 03774.
Dated: Issued February 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-02741 Filed 2-7-14; 8:45 am]
BILLING CODE 6717-01-P