Notice of Availability of the Draft Environmental Impact Statement for the Proposed Right-of-Way Amendment for the Blythe Solar Power Project, California, 7474-7475 [2014-02545]
Download as PDF
7474
Federal Register / Vol. 79, No. 26 / Friday, February 7, 2014 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
Environmental review of the EIS will
be conducted in accordance with the
requirements of NEPA, its implementing
regulations (40 CFR 1500–1508), other
applicable regulations, and our
procedures for compliance with those
regulations. We furnish this notice in
accordance with 40 CFR 1501.7 and
1508.22 to obtain suggestions and
information from other agencies and the
public on the scope of issues and
alternatives they believe need to be
addressed in the EIS. We invite
comments from interested parties to
ensure that the full range of issues
related to the proposed permit
application is identified.
information in your comment, you
should be aware that the entire
comment—including your personal
identifying information—may be made
publicly available at any time. While
you can ask us in your comment to
withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so. We will not consider anonymous
comments. All submissions from
organizations or businesses, and from
individuals identifying themselves as
representatives or officials of
organizations or businesses, will be
made available for public disclosure in
their entirety.
Public Comments
We are requesting information from
other interested government agencies,
Native American Tribes, the scientific
community, industry, or other
interested parties concerning the
following areas of analysis: Vegetation,
Wildlife and Aquatic Resources, Special
Status Species, U.S. Wetlands and
Waters, Archeology, Architectural
History, Sites of Religious and Cultural
Significance to Tribes, Noise and
Vibration, Visual Resources and
Aesthetics, Economics and
Socioeconomics, Environmental Justice,
Air Quality (including greenhouse gas
emissions and climate change), Geology
and Soil, Land Use, Transportation,
Infrastructure and Utilities, Hazardous
Materials and Solid Waste Management,
and Human Health and Safety.
Please note that submissions merely
stating support for, or opposition to, the
action under consideration without
providing supporting information,
although noted, will not provide
information useful in determining the
issues and the impacts to the human
environment in the draft EIS. The public
will also have a chance to review and
comment on the draft EIS when it is
available (a notice of availability will be
published in the Federal Register).
You may submit your comments and
materials by one of the methods
described above under the ADDRESSES
section at the beginning of this notice.
Written comments will also be accepted
at the public meetings, although these
public meetings are primarily intended
to provide additional information and
provide a chance for the public to ask
specific questions concerning the
proposed HCP and EIS.
Authority
We provide this notice under section
10(c) of the ESA (16 U.S.C. 1531 et seq.)
and its implementing regulations (50
CFR 17.22) and the National
Environmental Policy Act (42 U.S.C.
4721 et seq.) and its implementing
regulations (40 CFR 1506.6).
Public Availability of Comments
Written comments we receive become
part of the public record associated with
this action. Before including your
address, phone number, email address,
or other personal identifying
VerDate Mar<15>2010
17:17 Feb 06, 2014
Jkt 232001
review and approval. The Amendment
includes all lands contiguous to the
Crow Reservation and extends the term
for 15 years from the date the
Amendment becomes effective. The
Tribe is authorized to operate 925
gaming devices, increase the prize
value, and wager limits. As required by
25 CFR 293.4, all compacts and
amendments are subject to review and
approval by the Secretary, and pursuant
to 25 U.S.C. 2710(d)(3)(B), an approved
compact or amendment takes effect
when notice of its approval is published
in the Federal Register.
Dated: January 30, 2014.
Kevin K. Washburn,
Assistant Secretary—Indian Affairs.
[FR Doc. 2014–02594 Filed 2–6–14; 8:45 am]
BILLING CODE 4310–4N–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
Joy E. Nicholopoulos,
Acting Regional Director, Southwest Region,
Albuquerque, New Mexico.
[CACA 048811, LLCAD01500,
L51010000.LVRWB13B5340.ER0000]
[FR Doc. 2014–02637 Filed 2–6–14; 8:45 am]
DEPARTMENT OF THE INTERIOR
Notice of Availability of the Draft
Environmental Impact Statement for
the Proposed Right-of-Way
Amendment for the Blythe Solar Power
Project, California
Bureau of Indian Affairs
AGENCY:
BILLING CODE 4310–55–P
Bureau of Land Management,
Interior.
ACTION: Notice of availability.
[DR.5B711.IA000814]
Indian Gaming
AGENCY:
Interior.
Notice of approved Tribal-State
Class III Gaming Compact.
ACTION:
This notice publishes the
approval of an amendment to the Class
III Tribal-State Gaming Compact
(Amendment), between the Crow Tribe
of Montana (Tribe), and the State of
Montana (State).
DATES: Effective Date: February 7, 2014.
FOR FURTHER INFORMATION CONTACT:
Paula L. Hart, Director, Office of Indian
Gaming, Office of the Deputy Assistant
Secretary—Policy and Economic
Development, Washington, DC 20240,
(202) 219–4066.
SUPPLEMENTARY INFORMATION: Under
section 11 of the Indian Gaming
Regulatory Act (IGRA) Public Law 100–
497, 25 U.S.C. 2701 et seq., the
Secretary of the Interior shall publish in
the Federal Register notice of approved
Tribal-State compacts for the purpose of
engaging in Class III gaming activities
on Indian lands. On December 18, 2013,
the Amendment was submitted for
SUMMARY:
PO 00000
Frm 00053
Fmt 4703
In accordance with the
National Environmental Policy Act of
1969, as amended, and the Federal Land
Policy and Management Act of 1976, as
amended, the Bureau of Land
Management (BLM) Palm Springs—
South Coast Field Office, Palm Springs,
California, has prepared a Draft
Environmental Impact Statement (EIS)
for the proposed right-of-way (ROW)
grant amendment for the Blythe Solar
Power Project (BSPP), Riverside County,
California, and by this notice is
announcing a 45-day public comment
period on the EIS.
DATES: To ensure that comments will be
considered, the BLM must receive
written comments on the Draft EIS
within 45 days following the date the
Environmental Protection Agency
publishes its Notice of Availability in
the Federal Register. The BLM will
announce future meetings or hearings
and any other public involvement
activities at least 15 days in advance
through public notices, media releases,
and/or mailings.
ADDRESSES: You may submit comments
related to the proposed ROW
SUMMARY:
Bureau of Indian Affairs,
Sfmt 4703
E:\FR\FM\07FEN1.SGM
07FEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 26 / Friday, February 7, 2014 / Notices
amendment for the BSPP by any of the
following methods:
• Web site: https://www.blm.gov/ca/st/
en/fo/palmsprings/solar_projects/
Blythe_Solar_Power_Project.html
• Email: capssolarblythe@blm.gov.
• Fax: 760–833–7199, Attn: Frank
McMenimen.
• Mail: Frank McMenimen, Project
Manager, BLM Palm Springs—South
Coast Field Office, 1201 Bird Center
Drive, Palm Springs, CA 92262.
Copies of the Draft EIS are available
from the Palm Springs—South Coast
Field Office at the above address and
online at the project Web site.
FOR FURTHER INFORMATION CONTACT:
Frank McMenimen, BLM Project
Manager, telephone 760–833–7150;
address 1201 Bird Center Drive, Palm
Springs, CA 92262; email
capssolarblythe@blm.gov. Persons who
use a telecommunications device for the
deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1–
800–877–8339 to contact the above
individual during normal business
hours. The FIRS is available 24 hours a
day, 7 days a week, to leave a message
or question with the above individual.
You will receive a reply during normal
business hours.
SUPPLEMENTARY INFORMATION: The
project area is located 8 miles west of
Blythe and 3 miles north of Interstate 10
(I–10). The BSPP was permitted and
approved by the BLM as a 1,000megawatt (MW) solar thermal generating
plant in 2010. NextEra Blythe Solar
Energy Center, LLC (Grant Holder)
purchased via bankruptcy the (un-built)
project assets of the prior BSPP grant
holder in 2012. In connection with that
purchase, on August 22, 2012, the BLM
approved the assignment of the BSPP
ROW grant from the prior holder, Palo
Verde Solar I, LLC, to the Grant Holder.
The Grant Holder now proposes to
modify the Project’s energy generation
technology and to reduce the overall
size of the Project within the previously
approved BSPP footprint.
Specifically, the Grant Holder is
proposing to construct, operate,
maintain, and decommission the BSPP
using photovoltaic (PV) technology with
a 485 MW capacity on 4,138 acres of
BLM-administered public land.
Anticipating that a PV project would
require a smaller footprint than the
approved solar thermal trough project,
the Grant Holder relinquished to the
BLM approximately 35 percent of the
previously approved ROW grant on
March 7, 2013. In connection with its
proposed modifications to the BSPP, the
Grant Holder has submitted a Level 3
variance request seeking an amendment
VerDate Mar<15>2010
17:17 Feb 06, 2014
Jkt 232001
to the existing ROW authorization to
reduce the acreage of the project site
and change the generating technology
authorized under the ROW grant from
concentrating solar trough to PV, which
reduces the project’s capacity from
1,000 to 485 MWs (the Modified
Project).
The Draft EIS fully analyzes the Grant
Holder’s proposal to construct, operate,
maintain, and decommission a Modified
Project (Alternative 1), as well as the
BLM’s denial of the variance request
which would maintain the current ROW
grant approvals on the site as modified
by the Grant Holder’s voluntary
relinquishment (Alternative 2, No
Action). Further, as part of the Draft EIS,
Alternatives 1 and 2 are compared to the
Approved Project and the No Project
alternatives analyzed as part of the 2010
Proposed Plan Amendment/Final EIS
for the previously approved BSPP. The
Draft EIS does not supersede or replace
the BLM’s Proposed Plan Amendment/
Final EIS or other consideration of the
Approved Project, but rather tiers to that
analysis to extent applicable for analysis
of the Modified Project and alternative.
The Draft EIS analyzes the use of PV
technology in detail, including any
additional site-specific impacts
resulting from the change in technology
and additional or relocated ancillary
facilities. This includes impacts to air
quality, biological resources, climate
change, cultural resources, hazards and
public health, lands and realty, mineral
resources, noise, paleontological
resources, recreation and special
designations, socioeconomics and
environmental justice, soil resources,
traffic and travel management, visual
resources, water resources, and
wildland fire ecology.
The BLM conducted Native American
tribal consultations in accordance with
Section 106 of the National Historic
Preservation Act and Federal policy in
connection with the previously
approved BSPP, which resulted in the
development of a Programmatic
Agreement. During that process tribes
expressed their views and concerns
about the importance and sensitivity of
specific cultural resources to which they
attach religious and cultural
significance. In connection with its
review of the Modified Project and
throughout the implementation of the
PA, the BLM will continue to give tribal
concerns due consideration, including
impacts to historic properties to which
tribes attach religious and cultural
significance and Indian trust assets. The
BLM will also carry out its
responsibilities to consult with tribes on
a government-to-government basis and
other members of the public pursuant to
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
7475
Section 106, Executive Order 13175,
other laws and policies, and the existing
PA to the extent applicable to the
consideration of the Grant Holder’s
proposed amendment to the BSPP ROW
grant.
Federal, State, and local agencies,
along with other stakeholders that may
be interested or affected by the BLM’s
decision on this project are invited to
participate in the comment process and,
if eligible, may request or be requested
by the BLM to participate as a
cooperating agency. Please note that
public comments and information
submitted including names, street
addresses, and email addresses of
persons who submit comments will be
available for public review and
disclosure at the above address during
regular business hours (8 a.m. to 4 p.m.),
Monday through Friday, except
holidays.
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1506.6 & 1506.10.
Thomas Pogacnik,
Deputy State Director.
[FR Doc. 2014–02545 Filed 2–6–14; 8:45 am]
BILLING CODE 4310–40–P
INTERNATIONAL TRADE
COMMISSION
[USITC SE–14–004]
Sunshine Act Meetings
United
States International Trade Commission.
TIME AND DATE: February 14, 2014 at 11
a.m.
PLACE: Room 101, 500 E Street SW.,
Washington, DC 20436, Telephone:
(202) 205–2000.
STATUS: Open to the public.
MATTERS TO BE CONSIDERED:
1. Agendas for future meetings: none
2. Minutes
3. Ratification List
4. Vote in Inv. Nos. 701–TA–511 and
731–TA–1246–1247 (Preliminary)
(Certain Crystalline Silicon
Photovoltaic Products from China
and Taiwan). The Commission is
currently scheduled to complete
AGENCY HOLDING THE MEETING:
E:\FR\FM\07FEN1.SGM
07FEN1
Agencies
[Federal Register Volume 79, Number 26 (Friday, February 7, 2014)]
[Notices]
[Pages 7474-7475]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-02545]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA 048811, LLCAD01500, L51010000.LVRWB13B5340.ER0000]
Notice of Availability of the Draft Environmental Impact
Statement for the Proposed Right-of-Way Amendment for the Blythe Solar
Power Project, California
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act of
1969, as amended, and the Federal Land Policy and Management Act of
1976, as amended, the Bureau of Land Management (BLM) Palm Springs--
South Coast Field Office, Palm Springs, California, has prepared a
Draft Environmental Impact Statement (EIS) for the proposed right-of-
way (ROW) grant amendment for the Blythe Solar Power Project (BSPP),
Riverside County, California, and by this notice is announcing a 45-day
public comment period on the EIS.
DATES: To ensure that comments will be considered, the BLM must receive
written comments on the Draft EIS within 45 days following the date the
Environmental Protection Agency publishes its Notice of Availability in
the Federal Register. The BLM will announce future meetings or hearings
and any other public involvement activities at least 15 days in advance
through public notices, media releases, and/or mailings.
ADDRESSES: You may submit comments related to the proposed ROW
[[Page 7475]]
amendment for the BSPP by any of the following methods:
Web site: https://www.blm.gov/ca/st/en/fo/palmsprings/solar_projects/Blythe_Solar_Power_Project.html
Email: capssolarblythe@blm.gov.
Fax: 760-833-7199, Attn: Frank McMenimen.
Mail: Frank McMenimen, Project Manager, BLM Palm Springs--
South Coast Field Office, 1201 Bird Center Drive, Palm Springs, CA
92262.
Copies of the Draft EIS are available from the Palm Springs--South
Coast Field Office at the above address and online at the project Web
site.
FOR FURTHER INFORMATION CONTACT: Frank McMenimen, BLM Project Manager,
telephone 760-833-7150; address 1201 Bird Center Drive, Palm Springs,
CA 92262; email capssolarblythe@blm.gov. Persons who use a
telecommunications device for the deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1-800-877-8339 to contact the above
individual during normal business hours. The FIRS is available 24 hours
a day, 7 days a week, to leave a message or question with the above
individual. You will receive a reply during normal business hours.
SUPPLEMENTARY INFORMATION: The project area is located 8 miles west of
Blythe and 3 miles north of Interstate 10 (I-10). The BSPP was
permitted and approved by the BLM as a 1,000-megawatt (MW) solar
thermal generating plant in 2010. NextEra Blythe Solar Energy Center,
LLC (Grant Holder) purchased via bankruptcy the (un-built) project
assets of the prior BSPP grant holder in 2012. In connection with that
purchase, on August 22, 2012, the BLM approved the assignment of the
BSPP ROW grant from the prior holder, Palo Verde Solar I, LLC, to the
Grant Holder. The Grant Holder now proposes to modify the Project's
energy generation technology and to reduce the overall size of the
Project within the previously approved BSPP footprint.
Specifically, the Grant Holder is proposing to construct, operate,
maintain, and decommission the BSPP using photovoltaic (PV) technology
with a 485 MW capacity on 4,138 acres of BLM-administered public land.
Anticipating that a PV project would require a smaller footprint than
the approved solar thermal trough project, the Grant Holder
relinquished to the BLM approximately 35 percent of the previously
approved ROW grant on March 7, 2013. In connection with its proposed
modifications to the BSPP, the Grant Holder has submitted a Level 3
variance request seeking an amendment to the existing ROW authorization
to reduce the acreage of the project site and change the generating
technology authorized under the ROW grant from concentrating solar
trough to PV, which reduces the project's capacity from 1,000 to 485
MWs (the Modified Project).
The Draft EIS fully analyzes the Grant Holder's proposal to
construct, operate, maintain, and decommission a Modified Project
(Alternative 1), as well as the BLM's denial of the variance request
which would maintain the current ROW grant approvals on the site as
modified by the Grant Holder's voluntary relinquishment (Alternative 2,
No Action). Further, as part of the Draft EIS, Alternatives 1 and 2 are
compared to the Approved Project and the No Project alternatives
analyzed as part of the 2010 Proposed Plan Amendment/Final EIS for the
previously approved BSPP. The Draft EIS does not supersede or replace
the BLM's Proposed Plan Amendment/Final EIS or other consideration of
the Approved Project, but rather tiers to that analysis to extent
applicable for analysis of the Modified Project and alternative.
The Draft EIS analyzes the use of PV technology in detail,
including any additional site-specific impacts resulting from the
change in technology and additional or relocated ancillary facilities.
This includes impacts to air quality, biological resources, climate
change, cultural resources, hazards and public health, lands and
realty, mineral resources, noise, paleontological resources, recreation
and special designations, socioeconomics and environmental justice,
soil resources, traffic and travel management, visual resources, water
resources, and wildland fire ecology.
The BLM conducted Native American tribal consultations in
accordance with Section 106 of the National Historic Preservation Act
and Federal policy in connection with the previously approved BSPP,
which resulted in the development of a Programmatic Agreement. During
that process tribes expressed their views and concerns about the
importance and sensitivity of specific cultural resources to which they
attach religious and cultural significance. In connection with its
review of the Modified Project and throughout the implementation of the
PA, the BLM will continue to give tribal concerns due consideration,
including impacts to historic properties to which tribes attach
religious and cultural significance and Indian trust assets. The BLM
will also carry out its responsibilities to consult with tribes on a
government-to-government basis and other members of the public pursuant
to Section 106, Executive Order 13175, other laws and policies, and the
existing PA to the extent applicable to the consideration of the Grant
Holder's proposed amendment to the BSPP ROW grant.
Federal, State, and local agencies, along with other stakeholders
that may be interested or affected by the BLM's decision on this
project are invited to participate in the comment process and, if
eligible, may request or be requested by the BLM to participate as a
cooperating agency. Please note that public comments and information
submitted including names, street addresses, and email addresses of
persons who submit comments will be available for public review and
disclosure at the above address during regular business hours (8 a.m.
to 4 p.m.), Monday through Friday, except holidays.
Before including your address, phone number, email address, or
other personal identifying information in your comment, you should be
aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Authority: 40 CFR 1506.6 & 1506.10.
Thomas Pogacnik,
Deputy State Director.