Maine Tidal Power; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 7177 [2014-02483]
Download as PDF
Federal Register / Vol. 79, No. 25 / Thursday, February 6, 2014 / Notices
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on February 18, 2014.
Dated: January 30, 2014.
Kimberly D. Bose,
Secretary.
(866) 208–3372 (voice) or 202–502–8659
(TTY), or send a fax to 202–208–2106
with the required accommodations.
All interested persons are permitted
to attend. For further information please
contact Anna Fernandez at (202) 502–
6682 or email Anna.Fernandez@
ferc.gov.
Dated: January 30, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02487 Filed 2–5–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12704–007]
Maine Tidal Power; Notice of
Preliminary Permit Application
Accepted For Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
[FR Doc. 2014–02486 Filed 2–5–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP14–173–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Discovery Gas Transmission LLC;
Notice of Technical Conference
Take notice that a technical
conference will be held on Thursday,
February 27, 2014, at 10:00 a.m., in a
room to be designated at the offices of
the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426.
The purpose of the technical
conference is to examine the issues
raised with regard the November 15,
2013 filing made by Discovery Gas
Transmission LLC (Discovery) wherein
Discovery proposed to increase its
Hurricane Mitigation and Reliability
Enhancement Surcharge.1
Commission Staff and interested
persons will have the opportunity to
discuss all of the issues raised by
Discovery’s filing. Discovery should be
prepared to address all the concerns
raised in the protests.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
1 See Discovery Gas Transmission LLC, 145 FERC
¶ 61,297 (2013).
VerDate Mar<15>2010
18:18 Feb 05, 2014
Jkt 232001
On December 2, 2013, Maine Tidal
Power filed an application for a
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Half Moon Cove Tidal Power
Project (Half Moon Cove Project) to be
located in Cobscook and
Passamaquoddy Bay, near the cities of
Eastport and Perry, Washington County,
Maine. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new 1,200-foot-long
tidal wall with a crest elevation of
approximately 27 feet above mean sea
level (msl); (2) a new 60-foot-wide, 20foot-high filling and empting gate; (3)
the 850-acre Half Moon Cove with a
surface elevation of 13.0 feet above msl;
(4) a new 60-foot-wide, 125-foot-long
gated powerhouse with four turbine
generating units with a total capacity of
21.5 megawatts; (5) a new 34.5 kilovolt,
7.1-mile-long transmission line
extending from the project powerhouse
to an existing substation owned by
Bangor Hydroelectric Company located
in the town of Pembroke, ME (the point
of interconnection with the distribution
grid); and (6) appurtenant facilities. The
estimated annual generation of the Half
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
7177
Moon Cove Project would be 30,000
megawatt-hours.
Applicant Contact: Mr. Normand
Laberge, Maine Tidal Power, 46 Place
Cove Road, Trescott, Maine 04652;
phone: (207) 733–5513.
FERC Contact: Tom Dean; phone:
(202) 502–6041; or
thomas.dean@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–12704–007.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–12704) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: January 30, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02483 Filed 2–5–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14556–000]
Gridflex Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 12, 2013, the Gridflex
Energy, LLC, filed an application for a
E:\FR\FM\06FEN1.SGM
06FEN1
Agencies
[Federal Register Volume 79, Number 25 (Thursday, February 6, 2014)]
[Notices]
[Page 7177]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-02483]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12704-007]
Maine Tidal Power; Notice of Preliminary Permit Application
Accepted For Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On December 2, 2013, Maine Tidal Power filed an application for a
successive preliminary permit, pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the feasibility of the Half Moon
Cove Tidal Power Project (Half Moon Cove Project) to be located in
Cobscook and Passamaquoddy Bay, near the cities of Eastport and Perry,
Washington County, Maine. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) A new
1,200-foot-long tidal wall with a crest elevation of approximately 27
feet above mean sea level (msl); (2) a new 60-foot-wide, 20-foot-high
filling and empting gate; (3) the 850-acre Half Moon Cove with a
surface elevation of 13.0 feet above msl; (4) a new 60-foot-wide, 125-
foot-long gated powerhouse with four turbine generating units with a
total capacity of 21.5 megawatts; (5) a new 34.5 kilovolt, 7.1-mile-
long transmission line extending from the project powerhouse to an
existing substation owned by Bangor Hydroelectric Company located in
the town of Pembroke, ME (the point of interconnection with the
distribution grid); and (6) appurtenant facilities. The estimated
annual generation of the Half Moon Cove Project would be 30,000
megawatt-hours.
Applicant Contact: Mr. Normand Laberge, Maine Tidal Power, 46 Place
Cove Road, Trescott, Maine 04652; phone: (207) 733-5513.
FERC Contact: Tom Dean; phone: (202) 502-6041; or
thomas.dean@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-12704-007.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-12704) in the docket number field to access
the document. For assistance, contact FERC Online Support.