Maine Tidal Power; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 7177 [2014-02483]

Download as PDF Federal Register / Vol. 79, No. 25 / Thursday, February 6, 2014 / Notices interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on February 18, 2014. Dated: January 30, 2014. Kimberly D. Bose, Secretary. (866) 208–3372 (voice) or 202–502–8659 (TTY), or send a fax to 202–208–2106 with the required accommodations. All interested persons are permitted to attend. For further information please contact Anna Fernandez at (202) 502– 6682 or email Anna.Fernandez@ ferc.gov. Dated: January 30, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–02487 Filed 2–5–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12704–007] Maine Tidal Power; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Competing Applications [FR Doc. 2014–02486 Filed 2–5–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP14–173–000] mstockstill on DSK4VPTVN1PROD with NOTICES Discovery Gas Transmission LLC; Notice of Technical Conference Take notice that a technical conference will be held on Thursday, February 27, 2014, at 10:00 a.m., in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The purpose of the technical conference is to examine the issues raised with regard the November 15, 2013 filing made by Discovery Gas Transmission LLC (Discovery) wherein Discovery proposed to increase its Hurricane Mitigation and Reliability Enhancement Surcharge.1 Commission Staff and interested persons will have the opportunity to discuss all of the issues raised by Discovery’s filing. Discovery should be prepared to address all the concerns raised in the protests. FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an email to accessibility@ferc.gov or call toll free 1 See Discovery Gas Transmission LLC, 145 FERC ¶ 61,297 (2013). VerDate Mar<15>2010 18:18 Feb 05, 2014 Jkt 232001 On December 2, 2013, Maine Tidal Power filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Half Moon Cove Tidal Power Project (Half Moon Cove Project) to be located in Cobscook and Passamaquoddy Bay, near the cities of Eastport and Perry, Washington County, Maine. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new 1,200-foot-long tidal wall with a crest elevation of approximately 27 feet above mean sea level (msl); (2) a new 60-foot-wide, 20foot-high filling and empting gate; (3) the 850-acre Half Moon Cove with a surface elevation of 13.0 feet above msl; (4) a new 60-foot-wide, 125-foot-long gated powerhouse with four turbine generating units with a total capacity of 21.5 megawatts; (5) a new 34.5 kilovolt, 7.1-mile-long transmission line extending from the project powerhouse to an existing substation owned by Bangor Hydroelectric Company located in the town of Pembroke, ME (the point of interconnection with the distribution grid); and (6) appurtenant facilities. The estimated annual generation of the Half PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 7177 Moon Cove Project would be 30,000 megawatt-hours. Applicant Contact: Mr. Normand Laberge, Maine Tidal Power, 46 Place Cove Road, Trescott, Maine 04652; phone: (207) 733–5513. FERC Contact: Tom Dean; phone: (202) 502–6041; or thomas.dean@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–12704–007. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12704) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: January 30, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–02483 Filed 2–5–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14556–000] Gridflex Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 12, 2013, the Gridflex Energy, LLC, filed an application for a E:\FR\FM\06FEN1.SGM 06FEN1

Agencies

[Federal Register Volume 79, Number 25 (Thursday, February 6, 2014)]
[Notices]
[Page 7177]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-02483]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12704-007]


Maine Tidal Power; Notice of Preliminary Permit Application 
Accepted For Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On December 2, 2013, Maine Tidal Power filed an application for a 
successive preliminary permit, pursuant to section 4(f) of the Federal 
Power Act (FPA), proposing to study the feasibility of the Half Moon 
Cove Tidal Power Project (Half Moon Cove Project) to be located in 
Cobscook and Passamaquoddy Bay, near the cities of Eastport and Perry, 
Washington County, Maine. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) A new 
1,200-foot-long tidal wall with a crest elevation of approximately 27 
feet above mean sea level (msl); (2) a new 60-foot-wide, 20-foot-high 
filling and empting gate; (3) the 850-acre Half Moon Cove with a 
surface elevation of 13.0 feet above msl; (4) a new 60-foot-wide, 125-
foot-long gated powerhouse with four turbine generating units with a 
total capacity of 21.5 megawatts; (5) a new 34.5 kilovolt, 7.1-mile-
long transmission line extending from the project powerhouse to an 
existing substation owned by Bangor Hydroelectric Company located in 
the town of Pembroke, ME (the point of interconnection with the 
distribution grid); and (6) appurtenant facilities. The estimated 
annual generation of the Half Moon Cove Project would be 30,000 
megawatt-hours.
    Applicant Contact: Mr. Normand Laberge, Maine Tidal Power, 46 Place 
Cove Road, Trescott, Maine 04652; phone: (207) 733-5513.
    FERC Contact: Tom Dean; phone: (202) 502-6041; or 
thomas.dean@ferc.gov.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-12704-007.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-12704) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: January 30, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-02483 Filed 2-5-14; 8:45 am]