Independent Market Monitor for PJM v. PJM Interconnection, L.L.C.; Notice of Complaint, 6892-6893 [2014-02373]
Download as PDF
6892
Federal Register / Vol. 79, No. 24 / Wednesday, February 5, 2014 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–02427 Filed 2–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2042–013;
ER10–1941–005; ER11–3840–003; ER10–
1938–008; ER13–1407–002; ER13–1670–
002; ER10–1934–007; ER10–1893–007;
ER10–1888–005; ER10–1885–005; ER10–
1884–005; ER10–1883–005; ER10–1878–
005; ER10–1876–005; ER10–1875–005;
ER10–1873–005; ER12–1987–003; ER10–
1947–005; ER10–1864–005; ER10–1862–
007; ER12–2261–003; ER10–1865–005.
Applicants: Calpine Energy Services,
L.P., Calpine Gilroy Cogen, L.P., Calpine
Greenleaf, Inc., Calpine Power
America—CA, LLC, CCFC Sutter
Energy, LLC,CES Marketing V, LLC,CES
Marketing IX, LLC,CES Marketing X,
LLC, Creed Energy Center, LLC, Delta
Energy Center, LLC, Geysers Power
Company, LLC, Gilroy Energy Center,
LLC, Goose Haven Energy Center, LLC,
Los Esteros Critical Energy Facility LLC,
Los Medanos Energy Center, LLC,
Metcalf Energy Center, LLC, O.L.S.
Energy-Agnews, Inc., Otay Mesa Energy
Center, LLC, Pastoria Energy Facility
L.L.C., Power Contract Financing,
L.L.C., Russell City Energy Company,
LLC, South Point Energy Center, LLC.
Description: Notification of Change in
Status of the Calpine Corporation
subsidiaries Southwest MBR Sellers.
Filed Date: 1/29/14.
Accession Number: 20140129–5133.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–661–001.
Applicants: SG2 Imperial Valley LLC.
VerDate Mar<15>2010
16:50 Feb 04, 2014
Jkt 232001
Description: Amended Market-Based
Rate Tarriff of SG2 Imperial Valley, LLC
to be effective 2/1/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5086.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–787–000.
Applicants: Macho Springs Solar,
LLC.
Description: Amended Asset
Appendices to be effective N/A.
Filed Date: 1/29/14.
Accession Number: 20140129–5098.
Comments Due: 5 p.m. ET 2/10/14.
Docket Numbers: ER14–1181–000.
Applicants: Commonwealth Edison
Company, Commonwealth Edison
Company of Indiana,, PJM
Interconnection, L.L.C.
Description: ComEd submits revisions
to PJM OATT Attach H–13A re stated
depreciation rates to be effective 3/31/
2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5072.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1182–000.
Applicants: Commonwealth Edison
Company, Commonwealth Edison
Company of Indiana, Inc., PJM
Interconnection, L.L.C.
Description: ComEd submits a Letter
Agmt re Depreciation Rates-Original
Service Agmt No. 3747 to be effective 3/
31/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5075.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1183–000.
Applicants: Southwestern Electric
Power Company.
Description: SWEPCO-TexLa PSA
Amendment SPP Integrated Market to
be effective 3/1/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5105.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1184–000.
Applicants: Southwestern Electric
Power Company.
Description: SWEPCO–ETEC PSA
Amendment SPP Integrated Market to
be effective 3/1/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5106.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1185–000.
Applicants: Southwestern Electric
Power Company.
Description: SWEPCO–NTEC PSA
Amendment SPP Integrated Market to
be effective 3/1/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5108.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1186–000.
Applicants: Southwestern Electric
Power Company.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Description: SWEPCO-TexLa ERCOT
PSA Amendment SPP Integrated Market
to be effective 3/1/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5109.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1187–000.
Applicants: Southwestern Electric
Power Company.
Description: SWEPCO–ETEC NTEC
PSA Amendment SPP Integrated Market
to be effective 3/1/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5111.
Comments Due: 5 p.m. ET 2/19/14.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA13–4–000.
Applicants: Shady Hills Power
Company, L.L.C.
Description: Quarterly Land
Acquisition Report of Shady Hills
Power Company, L.L.C.
Filed Date: 1/29/14.
Accession Number: 20140129–5115.
Comments Due: 5 p.m. ET 2/19/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–02428 Filed 2–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–20–000]
Independent Market Monitor for PJM v.
PJM Interconnection, L.L.C.; Notice of
Complaint
Take notice that on January 27, 2014,
pursuant to section 206 of the Rules and
E:\FR\FM\05FEN1.SGM
05FEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 24 / Wednesday, February 5, 2014 / Notices
Practice and Procedure of the Federal
Energy Regulatory Commission
(Commission), 18 CFR 385.206 (2013),
Independent Market Monitor for PJM
(Market Monitor or Complainant), filed
a formal complaint against PJM
Interconnection, L.L.C. (PJM or
Respondent) requesting that the
Commission direct PJM to include rules
in the tariff that provide: (i) A
requirement that Demand Resources
(DR) must offer daily into the PJM DayAhead Energy Market, and (ii) a cap on
offers from DR at $1,000 per MWh,
consistent with the offer cap applicable
to Generation Capacity Resources.
The Complainant states that copies of
the complaint were served on
representatives of PJM and served to the
parties in Docket No. ER14–822–000.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on February 18, 2014.
VerDate Mar<15>2010
16:50 Feb 04, 2014
Jkt 232001
6893
Dated: January 28, 2014.
Kimberly D. Bose,
Secretary.
Dated: January 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02373 Filed 2–4–14; 8:45 am]
[FR Doc. 2014–02377 Filed 2–4–14; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. OR13–34–000]
[Project No. 13287–004–NY]
City of New York; Notice of Availability
of Final Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47897), the
Office of Energy Projects has reviewed
the application for an original license
for the proposed 14.08-megawatt (MW)
Cannonsville Hydroelectric Project, to
be located on the City of New York’s
existing Cannonsville Dam, which
impounds its Cannonsville Water
Supply Reservoir. The dam and
reservoir are located on the West Branch
of the Delaware River, near the
Township of Deposit, in Delaware
County, New York. Commission staff
prepared a final Environmental
Assessment (final EA) which analyzes
the potential environmental effects of
construction and operation of the
project and concludes that issuing a
new license for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the final EA is on file with
the Commission and is available for
public inspection. The final EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
FOR FURTHER INFORMATION CONTACT:
Mudre at (202) 502–8902.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
John
Valero Terminaling and Distribution
Company; Notice for Temporary
Waiver of Filing and Reporting
Requirements
Take notice that on September 27,
2013, pursuant to Rule 204 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.202 (2011),
Valero Terminaling and Distribution
Company (‘‘VTDC’’) requested that the
Commission grant a temporary waiver of
the Interstate Commerce Act (‘‘ICA’’)
Section 6 and Section 20 tariff filing and
reporting requirements applicable to
interstate common carrier pipelines.
VTDC’s waiver request applies to its
one-third undivided ownership interest
in the McKee Products System.
Any person desiring to intervene or to
protest in the above proceeding must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5:00 p.m.
Eastern Time on the specified comment
date. It is not necessary to separately
intervene again in a subdocket related to
a compliance filing if you have
previously intervened in the same
docket. Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. In
reference to filings initiating a new
proceeding, interventions or protests
submitted on or before the comment
deadline need not be served on persons
other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 79, Number 24 (Wednesday, February 5, 2014)]
[Notices]
[Pages 6892-6893]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-02373]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL14-20-000]
Independent Market Monitor for PJM v. PJM Interconnection,
L.L.C.; Notice of Complaint
Take notice that on January 27, 2014, pursuant to section 206 of
the Rules and
[[Page 6893]]
Practice and Procedure of the Federal Energy Regulatory Commission
(Commission), 18 CFR 385.206 (2013), Independent Market Monitor for PJM
(Market Monitor or Complainant), filed a formal complaint against PJM
Interconnection, L.L.C. (PJM or Respondent) requesting that the
Commission direct PJM to include rules in the tariff that provide: (i)
A requirement that Demand Resources (DR) must offer daily into the PJM
Day-Ahead Energy Market, and (ii) a cap on offers from DR at $1,000 per
MWh, consistent with the offer cap applicable to Generation Capacity
Resources.
The Complainant states that copies of the complaint were served on
representatives of PJM and served to the parties in Docket No. ER14-
822-000.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on February 18, 2014.
Dated: January 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-02373 Filed 2-4-14; 8:45 am]
BILLING CODE 6717-01-P