Terry Porter; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 6890-6891 [2014-02371]
Download as PDF
6890
Federal Register / Vol. 79, No. 24 / Wednesday, February 5, 2014 / Notices
Abstract: OMB clearance is requested
for a comprehensive randomized control
trial study of the Retired Mentors for
New Teachers program for probationary
teachers developed by the Aurora Public
School District (APS), in Aurora
Colorado. The program uses recently
retired master teachers to provide oneon-one mentoring to probationary
teachers in high poverty elementary
schools. The program was developed by
APS over a three year period from 2008–
2011. The district has partnered with
REL Central to conduct an RCT study of
the program because it desires to
understand program impacts on teacher
retention, performance, and teacher
evaluations. The district has committed
resources to pay for the intervention as
well as for teachers to participate in any
data gathering activities, such as surveys
or focus groups. This OMB clearance
request is to collect data from 100
teachers and 8 teacher mentors. It does
not include data collection from
students.
Dated: January 30, 2014.
Stephanie Valentine,
Acting Director, Information Collection
Clearance Division, Privacy, Information and
Records Management Services, Office of
Management.
[FR Doc. 2014–02369 Filed 2–4–14; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD14–12–000]
Terry Porter; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On January 15, 2014, Terry Porter
filed a notice of intent to construct a
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act, as amended by section 4 of
the Hydropower Regulatory Efficiency
Act of 2013 (HREA). The project would
have an installed capacity of 5.1
kilowatts (kW) Porter-Akali Turbine
Project, and it would utilize an existing
6,400-long pipeline, which varies from
eight inches to four inches in diameter,
that provides water from Alkali Creek
for agricultural purposes. The project
would be located near the Town of New
Castle, Garfield County, Colorado.
Applicant Contact: Terry Porter, P.O.
Box 8, New Caste, CO 81647 Phone No.
(970) 379–5360.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A small
segment of an existing 300-feet-long,
four-inch diameter high-pressure intake
pipeline; (2) a proposed powerhouse
containing two generating units, having
a total installed capacity of 5.1-kW;
(3)proposed eight-inch-diameter
discharge pipe; and (4) appurtenant
facilities. The proposed project would
have an estimated annual generating
capacity of 22.032 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ....
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ......................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by HREA
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
VerDate Mar<15>2010
16:50 Feb 04, 2014
Jkt 232001
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
1 18
PO 00000
CFR 385.2001–2005 (2013).
Frm 00010
Fmt 4703
Sfmt 4703
Y
Y
Y
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
E:\FR\FM\05FEN1.SGM
05FEN1
Federal Register / Vol. 79, No. 24 / Wednesday, February 5, 2014 / Notices
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD14–12–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: January 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–02371 Filed 2–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice Of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1818–004;
ER10–1819–005; ER10–1820–007; ER10–
1817–005.
Applicants: Public Service Company
of Colorado, Northern States Power
Company, a Minnesota corporation,
Northern States Power Company, a
Wisconsin corporation, Southwestern
Public Service Company.
Description: Supplement to June 28,
2013 Triennial Market Power Analysis
of Public Service Company of Colorado
for the Northwest Region.
Filed Date: 1/29/14.
Accession Number: 20140129–5034.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER10–1827–003;
ER10–1825–003.
Applicants: Cleco Power LLC, Cleco
Evangeline LLC.
Description: Notice of Non-Material
Change in Status of the Cleco
Companies.
Filed Date: 1/29/14.
Accession Number: 20140129–5067.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER12–2068–006.
Applicants: Blue Sky East, LLC.
VerDate Mar<15>2010
16:50 Feb 04, 2014
Jkt 232001
Description: Amendment to December
18, 2013 Order No. 784 Compliance
Filing to be effective 12/19/2013.
Filed Date: 1/28/14.
Accession Number: 20140128–5228.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER12–2265–002.
Applicants: Canandaigua Power
Partners, LLC.
Description: Amendment to December
18, 2013 Order No. 784 Compliance
Filing to be effective 12/19/2013.
Filed Date: 1/28/14.
Accession Number: 20140128–5227.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–703–001.
Applicants: Entergy Services, Inc.
Description: EES LBA Agreement
Refile—Tenaska 1–29–2014 to be
effective 12/31/9998.
Filed Date: 1/29/14.
Accession Number: 20140129–5008.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1169–000.
Applicants: Constellation Power
Source Generation, LLC.
Description: Notice of Succession to
be effective 1/1/2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5177.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1170–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1518R5 Arkansas Electric
Cooperative Corp NITSA NOA to be
effective 1/1/2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5183.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1171–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2198R14 Kansas Power
Pool NITSA NOA to be effective 1/1/
2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5201.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1173–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: NCEMC NITSA revisions
OATT SA No. 210 to be effective 1/1/
2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5229.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1174–000.
Applicants: Southwest Power Pool,
Inc.
Description: Submission of
Unexecuted Non-Firm PTP
Transmission Service Agreement No.
2794 to be effective 1/29/2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5231.
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
6891
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1176–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2655 Kansas Municipal
Energy Agency NITSA NOA to be
effective 1/1/2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5255.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1177–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2656 Kansas Municipal
Energy Agency NITSA NOA to be
effective 1/1/2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5260.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1178–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2657 Kansas Municipal
Energy Agency NITSA NOA to be
effective 1/1/2014.
Filed Date: 1/28/14.
Accession Number: 20140128–5261.
Comments Due: 5 p.m. ET 2/18/14.
Docket Numbers: ER14–1179–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Alliant Energy Corporate Services, Inc.
Description: 2014–01–29_SA 2631
IPL-Stanhope DAF Agreement to be
effective 1/1/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5007.
Comments Due: 5 p.m. ET 2/19/14.
Docket Numbers: ER14–1180–000.
Applicants: Cleco Power LLC.
Description: Cleco Power Comp Filing
to be effective 1/30/2014.
Filed Date: 1/29/14.
Accession Number: 20140129–5056.
Comments Due: 5 p.m. ET 2/19/14.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA13–4–000.
Applicants: Flat Rock Windpower
LLC, Flat Rock Windpower II, LLC,
Marble River, LLC, and Sustaining
Power Solutions LLC.
Description: Quarterly Land
Acquisition Report of Flat Rock
Windpower LLC, et al.
Filed Date: 1/29/14.
Accession Number: 20140129–5065.
Comments Due: 5 p.m. ET 2/19/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 79, Number 24 (Wednesday, February 5, 2014)]
[Notices]
[Pages 6890-6891]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-02371]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD14-12-000]
Terry Porter; Notice of Preliminary Determination of a Qualifying
Conduit Hydropower Facility and Soliciting Comments and Motions To
Intervene
On January 15, 2014, Terry Porter filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act, as amended by section 4 of the Hydropower
Regulatory Efficiency Act of 2013 (HREA). The project would have an
installed capacity of 5.1 kilowatts (kW) Porter-Akali Turbine Project,
and it would utilize an existing 6,400-long pipeline, which varies from
eight inches to four inches in diameter, that provides water from
Alkali Creek for agricultural purposes. The project would be located
near the Town of New Castle, Garfield County, Colorado.
Applicant Contact: Terry Porter, P.O. Box 8, New Caste, CO 81647
Phone No. (970) 379-5360.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A small segment of an existing 300-feet-
long, four-inch diameter high-pressure intake pipeline; (2) a proposed
powerhouse containing two generating units, having a total installed
capacity of 5.1-kW; (3)proposed eight-inch-diameter discharge pipe; and
(4) appurtenant facilities. The proposed project would have an
estimated annual generating capacity of 22.032 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies
Statutory provision Description (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA........ The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the
distribution of water for agricultural, municipal, or
industrial consumption and not primarily for the
generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA..... The facility is constructed, operated, or maintained Y
for the generation of electric power and uses for
such generation only the hydroelectric potential of a
non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA.... The facility has an installed capacity that does not Y
exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing requirements
of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility not
required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
[[Page 6891]]
A copy of all other filings in reference to this application must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD14-12-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: January 29, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-02371 Filed 2-4-14; 8:45 am]