PUD No. 1 of Chelan County; Notice of Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests, 3798 [2014-01281]

Download as PDF 3798 Federal Register / Vol. 79, No. 15 / Thursday, January 23, 2014 / Notices freezer). The test period also includes the target defrost and following regular freezer compressor cycles, ending at the end of a regular freezer compressor oncycle before the next defrost occurrence (refrigerator or freezer). If the previous condition does not meet 24 hours time, additional EP1 steady state segment data could be included. Steady state run cycle data can be utilized in EP1 and EP2i. Test Measurement Frequency: Measurements shall be taken at regular interval not exceeding 1 minute. Request For the reasons that DOE described in its granting of waiver and interim waiver for Sub-Zero and LG for refrigerator-freezers with shared dual compressors, Samsung believes that the expeditious granting of Waiver and Interim Waiver for the model listed below is warranted: RF33H99**** Please feel free to contact me if you have any questions regarding this Application for Petition for Waiver and Application for Interim Waiver. I will be happy to discuss should any questions arise. Sincerely, Michael Moss Director of Corporate Environmental Affairs [FR Doc. 2014–01345 Filed 1–22–14; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 637–097] sroberts on DSK5SPTVN1PROD with NOTICES PUD No. 1 of Chelan County; Notice of Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters b. Project No: 637–097 c. Date Filed: January 7, 2014 d. Applicant: Public Utility District No. 1 of Chelan County e. Name of Project: Lake Chelan Hydroelectric Project f. Location: Chelan River in Chelan County, Washington. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a—825r h. Applicant Contact: Michelle Smith, Licensing and Compliance Manager, Public Utility District No. 1 of Chelan County, 327 North Wenatchee Avenue, Wenatchee, Washington 98801. Phone: 888–663–8121, ext 4180. Email: michelle@chelanpud.org. i. FERC Contact: Shana High at (202) 502–8674, or email: shana.high@ ferc.gov. VerDate Mar<15>2010 21:50 Jan 22, 2014 Jkt 232001 j. Deadline for filing comments, motions to intervene, and protests: February 14, 2014. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P–637–097) on any comments, motions, or recommendations filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Public Utility District No. 1 of Chelan County proposes to permit Chelan Lookout LLC to construct a 70-slip marina to provide boat moorage and lake access for property owners at the Lookout at Lake Chelan, a residential development on Lake Chelan’s north shore. The 12,773 square-foot facility would be constructed on private property (29%) and Washington Department of Natural Resources leased land (71%). The application details proposed compensatory mitigation. No dredging or fill would occur, and no fuel facilities are proposed. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in PO 00000 Frm 00024 Fmt 4703 Sfmt 9990 the docket number field (P–637) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: January 15, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–01281 Filed 1–22–14; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\23JAN1.SGM 23JAN1

Agencies

[Federal Register Volume 79, Number 15 (Thursday, January 23, 2014)]
[Notices]
[Page 3798]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-01281]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 637-097]


PUD No. 1 of Chelan County; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions to Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-project use of project lands and waters
    b. Project No: 637-097
    c. Date Filed: January 7, 2014
    d. Applicant: Public Utility District No. 1 of Chelan County
    e. Name of Project: Lake Chelan Hydroelectric Project
    f. Location: Chelan River in Chelan County, Washington.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r
    h. Applicant Contact: Michelle Smith, Licensing and Compliance 
Manager, Public Utility District No. 1 of Chelan County, 327 North 
Wenatchee Avenue, Wenatchee, Washington 98801. Phone: 888-663-8121, ext 
4180. Email: michelle@chelanpud.org.
    i. FERC Contact: Shana High at (202) 502-8674, or email: 
shana.high@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: February 14, 2014.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. 
Please include the project number (P-637-097) on any comments, motions, 
or recommendations filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: Public Utility District No. 1 of Chelan 
County proposes to permit Chelan Lookout LLC to construct a 70-slip 
marina to provide boat moorage and lake access for property owners at 
the Lookout at Lake Chelan, a residential development on Lake Chelan's 
north shore. The 12,773 square-foot facility would be constructed on 
private property (29%) and Washington Department of Natural Resources 
leased land (71%). The application details proposed compensatory 
mitigation. No dredging or fill would occur, and no fuel facilities are 
proposed.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-637) to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above. Agencies may obtain copies of the 
application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: January 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-01281 Filed 1-22-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.