Drawbridge Operation Regulation; Grassy Sound Channel, Middle Township, NJ, 3495-3496 [2014-01235]
Download as PDF
Federal Register / Vol. 79, No. 14 / Wednesday, January 22, 2014 / Rules and Regulations
proceed to conduct a secret ballot of the
employees involved on the question
whether they desire to rescind the
authority of the labor organization to
make such an agreement with their
employer: Provided, however, That in
any case in which it appears to the
regional director that the proceeding
raises questions which cannot be
decided without a hearing, he may issue
and cause to be served on the parties a
notice of hearing before a hearing officer
at a time and place fixed therein. The
regional director shall fix the time and
place of the election, eligibility
requirements for voting, and other
arrangements of the balloting, but the
parties may enter into an agreement,
subject to the approval of the regional
director, fixing such arrangements. In
any such consent agreements, provision
may be made for final determination of
all questions arising with respect to the
balloting by the regional director or by
the Board.
■
19. Revise § 102.86 to read as follows:
§ 102.86
Hearing; posthearing procedure.
The method of conducting the hearing
and the procedure following the
hearing, including transfer of the case to
the Board, shall be governed, insofar as
applicable, by §§ 102.63 to 102.68 of
this part, inclusive.
By direction of the Board.
Dated: Washington, DC, January 15, 2014.
William B. Cowen,
Solicitor.
[FR Doc. 2014–01061 Filed 1–21–14; 8:45 am]
BILLING CODE 7545–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–1026]
Drawbridge Operation Regulation;
China Basin, San Francisco, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Third Street
Drawbridge across China Basin, mile 0.0
at San Francisco, CA. The deviation is
necessary to allow the public to cross
the bridge to participate in events of the
San Francisco Boat Show at AT&T Park
and neighboring sites. This deviation
allows the bridge to remain in the
pmangrum on DSK3VPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
14:36 Jan 21, 2014
Jkt 232001
closed-to-navigation position during the
deviation period.
DATES: This deviation is effective from
12 p.m. on January 23, 2014 to 6 p.m.
on January 26, 2014.
ADDRESSES: The docket for this
deviation, [USCG–2013–1026], is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email David H.
Sulouff, Chief, Bridge Section, Eleventh
Coast Guard District; telephone 510–
437–3516, email David.H.Sulouff@
uscg.mil. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations,
telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The City
of San Francisco Public Works
Department has requested a temporary
change to the operation of the Third
Street Drawbridge, mile 0.0, over China
Basin, at San Francisco, CA. The
drawbridge navigation span provides 7
feet vertical clearance above Mean High
Water in the closed-to-navigation
position. The draw opens on signal if at
least one hour notice is given as
required by 33 CFR 117.149. Navigation
on the waterway is recreational.
The drawspan will be secured in the
closed-to-navigation position from 12
p.m. to 7 p.m. on January 23 & 24, 2014;
from 10 a.m. to 7 p.m. on January 25,
2014; and from 10 a.m. to 6 p.m. on
January 26, 2014 to allow the public to
cross the bridge during events of the San
Francisco Boat Show at AT&T Park.
This temporary deviation has been
coordinated with the waterway users.
No objections to the proposed
temporary deviation were raised. The
drawspan can be operated upon one
hour advance notice for emergencies
requiring the passage of waterway
traffic.
Vessels able to pass through the
bridge in the closed position may do so
at anytime. The bridge will be able to
open for emergencies upon one hour
advance notice and there is no
immediate alternate route for vessels to
pass. The Coast Guard will also inform
the users of the waterways through our
Local and Broadcast Notices to Mariners
PO 00000
Frm 00015
Fmt 4700
Sfmt 4700
3495
of the change in operating schedule for
the bridge so that vessels can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 7, 2014.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2014–01093 Filed 1–21–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–1070]
Drawbridge Operation Regulation;
Grassy Sound Channel, Middle
Township, NJ
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Grassy Sound
Channel Bridge (Ocean Drive) across
Grassy Sound, mile 1.0, at Middle
Township, NJ. The deviation is
necessary to accommodate the ‘‘The
Wild Half’’ half marathon. This
temporary deviation allows the bridge
draw span to remain in the closed to
navigation position for 3 1⁄2 hours during
the event.
DATES: This deviation is effective from
7:30 a.m. until 11 a.m. on May 18, 2014.
ADDRESSES: The docket for this
deviation, [USCG–2013–1070] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jim
Rousseau, Bridge Administration
SUMMARY:
E:\FR\FM\22JAR1.SGM
22JAR1
3496
Federal Register / Vol. 79, No. 14 / Wednesday, January 22, 2014 / Rules and Regulations
Coast Guard
uscg.mil. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations,
telephone 202–366–9826.
33 CFR Part 117
SUPPLEMENTARY INFORMATION:
Branch Fifth District, Coast Guard;
telephone (757) 398–6557, email
James.L.Rousseau2@uscg.mil. If you
have questions on reviewing the docket,
call Cheryl Collins, Program Manager,
Docket Operations, (202) 366–9826.
DEPARTMENT OF HOMELAND
SECURITY
Cape May
County Department of Public Works,
owner of the drawbridge, has requested
on behalf of Morey’s Piers of Wildwood,
a temporary deviation from the current
operating schedule to accommodate the
‘‘The Wild Half’’ half marathon.
The existing drawbridge operation
regulations are listed at 33 CFR 117.721.
On the day of the event, the normal
operating schedule for the Grassy Sound
Channel Bridge (Ocean Drive) is open
on signal from 6 a.m. to 8 p.m. with a
two hours advance notice at all other
times.
Under this temporary deviation, the
drawbridge will be allowed to remain in
the closed to navigation position from
7:30 a.m. to 11 a.m. on Saturday, May
18, 2014 to accommodate ‘‘The Wild
Half’’ half marathon. The bridge will
operate under its normal operating
schedule at all other times. Log books
indicate there have been no opening
requests during this yearly event in 4
years and waterway users are
accustomed to the temporary closure.
The Grassy Sound Channel Bridge
(Ocean Drive) across the Grassy Sound
has a vertical clearance in the closed
position of 15 feet above mean high
water. Vessels able to pass under the
bridge in the closed position may do so
at anytime and are advised to proceed
with caution. The bridge will be able to
open for emergencies. The New Jersey
Intracoastal Waterway is an alternate
route for vessels transiting this area and
vessels may pass before and after the
closure. The Coast Guard will also
inform additional waterway users
through our Local and Broadcast
Notices to Mariners of the closure
period for the bridge so that vessels can
arrange their transits to minimize any
impacts caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
[Docket No. USCG–2013–0964]
pmangrum on DSK3VPTVN1PROD with RULES
SUPPLEMENTARY INFORMATION:
Dated: January 10, 2014.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2014–01235 Filed 1–21–14; 8:45 am]
BILLING CODE 9110–04–P
VerDate Mar<15>2010
14:36 Jan 21, 2014
Jkt 232001
Drawbridge Operation Regulation;
Upper Mississippi River, Dubuque, IA
Coast Guard, DHS.
Notice of change in deviation
from drawbridge regulation.
AGENCY:
ACTION:
On December 2, 2013, the
Coast Guard issued a temporary
deviation, lasting approximately 10
weeks, from the operating schedule that
governs the Illinois Central Railroad
Drawbridge across the Upper
Mississippi River, mile 579.9, at
Dubuque, Iowa. This temporary
deviation allows the bridge to open on
signal if at least 24 hours advance notice
is given. It is necessary to allow the
bridge owner time to perform preventive
maintenance that is essential to the
continued safe operation of the
drawbridge. Maintenance is scheduled
in the winter and when there is less
impact on navigation; instead of
scheduling work in the summer, when
river traffic increases. We are modifying
that temporary deviation to allow for
two three-day periods during the
deviation when the bridge will remain
in the closed-to-navigation position.
DATES: The temporary deviation
published in the Federal Register of
December 2, 2013, (78 FR 72022)
remains in effect; however, from 8 a.m.,
January 20, 2014 to 8 a.m., January 23,
2014 and 8 a.m. February 3, 2014, to 8
a.m., February 6, 2014, the bridge will
remain in the closed-to-navigation
position.
SUMMARY:
The docket for this
deviation, [USCG–2013–0964] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation, West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
314–269–2378, email Eric.Washburn@
ADDRESSES:
PO 00000
Frm 00016
Fmt 4700
Sfmt 9990
The
Chicago, Central & Pacific Railroad
requested a temporary deviation for the
Illinois Central Railroad Drawbridge,
across the Upper Mississippi River, mile
579.9, at Dubuque, Iowa to open on
signal if at least 24 hours advance notice
is given for 76 days from 12:01 a.m.,
December 18, 2013 to 7 a.m., March 3,
2014 to allow the bridge owner time for
preventive maintenance. The temporary
deviation published in the Federal
Register on December 2, 2013 (78 FR
72022). The Chicago, Central & Pacific
Railroad further requested, to support
preventative maintenance on the bridge,
to leave the bridge in the closed-tonavigation position for 6 days from 8
a.m., January 20, 2014 to 8 a.m., January
23, 2014 and 8 a.m., February 3, 2014
to 8 a.m., February 6, 2014. The Illinois
Central Railroad Drawbridge regularly
operates in accordance with 33 CFR
117.5, which states the general
requirement that drawbridges shall open
promptly and fully for the passage of
vessels when a request to open is given
in accordance with the subpart.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
Winter conditions on the Upper
Mississippi River coupled with the
closure of Army Corps of Engineer’s
Lock No. 18 (Mile 410.5, UMR) and
Lock No. 22 (Mile 301.2, UMR) until
11:00 a.m., March 4, 2014 will preclude
any significant navigation demands for
the drawspan opening.
The Illinois Central Railroad
Drawbridge, in the closed-to-navigation
position, provides a vertical clearance of
19.9 feet above normal pool. Navigation
on the waterway consists primarily of
commercial tows and recreational
watercraft. This temporary deviation has
been coordinated with waterway users.
No objections were received.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 9, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2014–01240 Filed 1–21–14; 8:45 am]
BILLING CODE 9110–04–P
E:\FR\FM\22JAR1.SGM
22JAR1
Agencies
[Federal Register Volume 79, Number 14 (Wednesday, January 22, 2014)]
[Rules and Regulations]
[Pages 3495-3496]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-01235]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-1070]
Drawbridge Operation Regulation; Grassy Sound Channel, Middle
Township, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Grassy Sound Channel Bridge (Ocean
Drive) across Grassy Sound, mile 1.0, at Middle Township, NJ. The
deviation is necessary to accommodate the ``The Wild Half'' half
marathon. This temporary deviation allows the bridge draw span to
remain in the closed to navigation position for 3 \1/2\ hours during
the event.
DATES: This deviation is effective from 7:30 a.m. until 11 a.m. on May
18, 2014.
ADDRESSES: The docket for this deviation, [USCG-2013-1070] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jim Rousseau, Bridge
Administration
[[Page 3496]]
Branch Fifth District, Coast Guard; telephone (757) 398-6557, email
James.L.Rousseau2@uscg.mil. If you have questions on reviewing the
docket, call Cheryl Collins, Program Manager, Docket Operations, (202)
366-9826.
SUPPLEMENTARY INFORMATION: Cape May County Department of Public Works,
owner of the drawbridge, has requested on behalf of Morey's Piers of
Wildwood, a temporary deviation from the current operating schedule to
accommodate the ``The Wild Half'' half marathon.
The existing drawbridge operation regulations are listed at 33 CFR
117.721. On the day of the event, the normal operating schedule for the
Grassy Sound Channel Bridge (Ocean Drive) is open on signal from 6 a.m.
to 8 p.m. with a two hours advance notice at all other times.
Under this temporary deviation, the drawbridge will be allowed to
remain in the closed to navigation position from 7:30 a.m. to 11 a.m.
on Saturday, May 18, 2014 to accommodate ``The Wild Half'' half
marathon. The bridge will operate under its normal operating schedule
at all other times. Log books indicate there have been no opening
requests during this yearly event in 4 years and waterway users are
accustomed to the temporary closure.
The Grassy Sound Channel Bridge (Ocean Drive) across the Grassy
Sound has a vertical clearance in the closed position of 15 feet above
mean high water. Vessels able to pass under the bridge in the closed
position may do so at anytime and are advised to proceed with caution.
The bridge will be able to open for emergencies. The New Jersey
Intracoastal Waterway is an alternate route for vessels transiting this
area and vessels may pass before and after the closure. The Coast Guard
will also inform additional waterway users through our Local and
Broadcast Notices to Mariners of the closure period for the bridge so
that vessels can arrange their transits to minimize any impacts caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 10, 2014.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2014-01235 Filed 1-21-14; 8:45 am]
BILLING CODE 9110-04-P