Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization, 2655-2656 [2014-00544]

Download as PDF Federal Register / Vol. 79, No. 10 / Wednesday, January 15, 2014 / Notices 2655 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(C)(i), as amended by HREA. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts ............................. Y wreier-aviles on DSK5TPTVN1PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended by HREA. FPA 30(a)(3)(C)(iii), as amended by HREA. On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, 1 18 CFR 385.2001–2005 (2013). VerDate Mar<15>2010 14:04 Jan 14, 2014 Jkt 232001 please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the Web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD14–11–000) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: January 8, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–00542 Filed 1–14–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–35–000] Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on December 30, 2013, Southern Star Central Gas Pipeline, Inc., (Southern Star), 4700 State Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP14–35–000, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Y Y under the Natural Gas Act. Southern Star seeks authorization to relocate, replace, and abandon sections of its 16inch EK Pipeline, 16-inch ES Pipeline and 26-inch E Pipeline to facilitate the Kansas Department of Transportation’s plan to construct and modify Highway K–10 and various interchanges, collectively known as the South Lawrence Trafficway Project (STL Project) located in Douglas County, Kansas. Southern Star will construct approximately 3.2 miles of new pipeline that will be rerouted around and lowered through the STL Project and tied into existing lines, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to Phyllis K. Medley, Senior Analyst, Regulatory Compliance, Southern Star Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, or by calling (270) 852–4653, or by fax (270) 852–5010, or by email Phyllis.k.medley@sscgp.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be E:\FR\FM\15JAN1.SGM 15JAN1 wreier-aviles on DSK5TPTVN1PROD with NOTICES 2656 Federal Register / Vol. 79, No. 10 / Wednesday, January 15, 2014 / Notices treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: January 8, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–00544 Filed 1–14–14; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 14:04 Jan 14, 2014 Jkt 232001 EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2014–0002] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP088513XX Export-Import Bank of the United States. ACTION: Notice. AGENCY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the ExportImport Bank of the United States (‘‘ExIm Bank’’), that Ex-Im Bank has received an application for final commitment for a long-term loan or financial guarantee in excess of $100 million (as calculated in accordance with Section 3(c)(10) of the Charter). Comments received within the comment period specified below will be presented to the Ex-Im Bank Board of Directors prior to final action on this Transaction. Comments received will be made available to the public. DATES: Comments must be received on or before February 10, 2014 to be assured of consideration before final consideration of the transaction by the Board of Directors of Ex-Im Bank. ADDRESSES: Comments may be submitted through Regulations.gov at WWW.REGULATIONS.GOV. To submit a comment, enter EIB–2014–0002 under the heading ‘‘Enter Keyword or ID’’ and select Search. Follow the instructions provided at the Submit a Comment screen. Please include your name, company name (if any) and EIB–2014– 0002 on any attached document. Reference: AP088513XX. Purpose and Use: Brief description of the purpose of the transaction: To support the export of U.S.manufactured commercial aircraft to Canada. Brief non-proprietary description of the anticipated use of the items being exported: To be used for long-haul passenger air service between Canada and other countries. To the extent that Ex-Im Bank is reasonably aware, the item(s) being exported are not expected to produce exports or provide services in competition with the exportation of goods or provision of services by a United States industry. Parties: Principal Supplier: The Boeing Company. Obligor: Air Canada. Guarantor(s): N/A. Description of Items Being Exported: Boeing 787 aircraft. Information on Decision: Information on the final decision for this transaction SUMMARY: PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 will be available in the ‘‘Summary Minutes of Meetings of Board of Directors’’ on https://exim.gov/ newsandevents/boardmeetings/board/. Confidential Information: Please note that this notice does not include confidential or proprietary business information; information which, if disclosed, would violate the Trade Secrets Act; or information which would jeopardize jobs in the United States by supplying information that competitors could use to compete with companies in the United States. Cristopolis Dieguez, Program Specialist, Office of the General Counsel. [FR Doc. 2014–00602 Filed 1–14–14; 8:45 am] BILLING CODE 6690–01–P FEDERAL COMMUNICATIONS COMMISSION Information Collections Being Reviewed by the Federal Communications Commission Under Delegated Authority Federal Communications Commission. ACTION: Notice and request for comments. AGENCY: As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501– 3520), the Federal Communications Commission (FCC or the Commission) invites the general public and other Federal agencies to take this opportunity to comment on the following information collection. Comments are requested concerning: Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission’s burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the SUMMARY: E:\FR\FM\15JAN1.SGM 15JAN1

Agencies

[Federal Register Volume 79, Number 10 (Wednesday, January 15, 2014)]
[Notices]
[Pages 2655-2656]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-00544]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-35-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Request Under 
Blanket Authorization

    Take notice that on December 30, 2013, Southern Star Central Gas 
Pipeline, Inc., (Southern Star), 4700 State Highway 56, Owensboro, 
Kentucky 42301, filed in Docket No. CP14-35-000, a prior notice request 
pursuant to sections 157.205 and 157.216 of the Commission's 
regulations under the Natural Gas Act. Southern Star seeks 
authorization to relocate, replace, and abandon sections of its 16-inch 
EK Pipeline, 16-inch ES Pipeline and 26-inch E Pipeline to facilitate 
the Kansas Department of Transportation's plan to construct and modify 
Highway K-10 and various interchanges, collectively known as the South 
Lawrence Trafficway Project (STL Project) located in Douglas County, 
Kansas. Southern Star will construct approximately 3.2 miles of new 
pipeline that will be rerouted around and lowered through the STL 
Project and tied into existing lines, all as more fully set forth in 
the application which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this Application should be directed to 
Phyllis K. Medley, Senior Analyst, Regulatory Compliance, Southern Star 
Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 
42301, or by calling (270) 852-4653, or by fax (270) 852-5010, or by 
email Phyllis.k.medley@sscgp.com.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be

[[Page 2656]]

treated as an application for authorization pursuant to section 7 of 
the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with he Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file 
electronically should submit an original and 5 copies of the protest or 
intervention to the Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426.

    Dated: January 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-00544 Filed 1-14-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.