Brigham City Corporation; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 2654-2655 [2014-00542]
Download as PDF
2654
Federal Register / Vol. 79, No. 10 / Wednesday, January 15, 2014 / Notices
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5 p.m. Eastern time
on January 21, 2014.
Dated: January 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–00539 Filed 1–14–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14574–000]
wreier-aviles on DSK5TPTVN1PROD with NOTICES
New England Hydropower Company,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 18, 2013, the New
England Hydropower Company, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Union Pond
Dam Hydroelectric Project (proposed
project) to be located on Hockanum
River, in the city of Manchester, in
Hartford County, Connecticut. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An existing 33-foothigh, 590-foot-long earth embankment
dam with a 360-foot-long concrete
spillway; (2) the existing 50-acre Union
Pond with a storage capacity of 515
acre-feet at an elevation of about 142.3
feet above mean sea level; (3) a new 6foot-high, 8-foot-wide hydraulicallypowered sluice gate and a new 6-foothigh, 9-foot-wide trashrack with 6-inch
bar spacing; (4) a new 35-foot-long, 11.3foot-diameter concrete intake canal; (5)
a new 56-foot-long, 7.7-foot wide
Archimedes screw generator unit with
an installed capacity of 122 kilowatts;
(6) a new 10-foot-high, 12-foot-long, 18foot-wide concrete powerhouse
containing a new gearbox and electrical
controls; (7) a new 90-foot-long, 35kilovolt above-ground transmission line
connecting the powerhouse to
Connecticut Light and Power’s
distribution system; and (8) appurtenant
facilities. The estimated annual
generation of the proposed Union Pond
Dam Hydroelectric Project would be
about 575 megawatt-hours. The existing
Union Pond Dam and adjacent property
are owned by the city of Manchester.
Applicant Contact: Mr. Michael C.
Kerr, New England Hydropower
Company, LLC, P.O. Box 5524, Beverly
Farms, Massachusetts 01915; phone:
(978) 360–2547.
FERC Contact: John Ramer; phone:
(202) 502–8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14574–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14574) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–00541 Filed 1–14–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD14–11–000]
Brigham City Corporation; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On December 30, 2013, Brigham City
Corporation (Brigham) filed a notice of
intent to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The 800-kW Box Elder
Power Plant Upgrade Project would
utilize Brigham’s existing 30-inch and
24-inch-diameter water supply
distribution line. The project would be
located in Box Elder County, Utah.
Applicant Contact: Dave Burnett,
Brigham City, Utah, 20 North Main,
Brigham, UT 84302 Phone No. (435)
734–6623.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A small
segment of existing 24-inch-diameter
pipe feeding into a new 20-inchdiameter intake pipe; (2) an existing
bifurcation pipe to bypass the
powerhouse; (3) an existing powerhouse
containing one new 800-kilowatt
generating unit, which will replace an
existing 575-kW unit; (4) an existing 23foot-long, 4-foot-wide tailrace which
discharges into an existing 36-inchdiameter pipe; and (5) appurtenant
facilities. The proposed project would
have an estimated annual generating
capacity of 4,300 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by
HREA.
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
Y
VerDate Mar<15>2010
14:04 Jan 14, 2014
Jkt 232001
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
E:\FR\FM\15JAN1.SGM
15JAN1
Federal Register / Vol. 79, No. 10 / Wednesday, January 15, 2014 / Notices
2655
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(C)(i), as amended by
HREA.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .............................
Y
wreier-aviles on DSK5TPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by
HREA.
FPA 30(a)(3)(C)(iii), as amended by
HREA.
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing
requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
1 18
CFR 385.2001–2005 (2013).
VerDate Mar<15>2010
14:04 Jan 14, 2014
Jkt 232001
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD14–11–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: January 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–00542 Filed 1–14–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–35–000]
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
Take notice that on December 30,
2013, Southern Star Central Gas
Pipeline, Inc., (Southern Star), 4700
State Highway 56, Owensboro,
Kentucky 42301, filed in Docket No.
CP14–35–000, a prior notice request
pursuant to sections 157.205 and
157.216 of the Commission’s regulations
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Y
Y
under the Natural Gas Act. Southern
Star seeks authorization to relocate,
replace, and abandon sections of its 16inch EK Pipeline, 16-inch ES Pipeline
and 26-inch E Pipeline to facilitate the
Kansas Department of Transportation’s
plan to construct and modify Highway
K–10 and various interchanges,
collectively known as the South
Lawrence Trafficway Project (STL
Project) located in Douglas County,
Kansas. Southern Star will construct
approximately 3.2 miles of new pipeline
that will be rerouted around and
lowered through the STL Project and
tied into existing lines, all as more fully
set forth in the application which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to
Phyllis K. Medley, Senior Analyst,
Regulatory Compliance, Southern Star
Central Gas Pipeline, Inc., 4700 State
Highway 56, Owensboro, Kentucky
42301, or by calling (270) 852–4653, or
by fax (270) 852–5010, or by email
Phyllis.k.medley@sscgp.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
E:\FR\FM\15JAN1.SGM
15JAN1
Agencies
[Federal Register Volume 79, Number 10 (Wednesday, January 15, 2014)]
[Notices]
[Pages 2654-2655]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-00542]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD14-11-000]
Brigham City Corporation; Notice of Preliminary Determination of
a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On December 30, 2013, Brigham City Corporation (Brigham) filed a
notice of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act, as amended by section
4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 800-
kW Box Elder Power Plant Upgrade Project would utilize Brigham's
existing 30-inch and 24-inch-diameter water supply distribution line.
The project would be located in Box Elder County, Utah.
Applicant Contact: Dave Burnett, Brigham City, Utah, 20 North Main,
Brigham, UT 84302 Phone No. (435) 734-6623.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A small segment of existing 24-inch-
diameter pipe feeding into a new 20-inch-diameter intake pipe; (2) an
existing bifurcation pipe to bypass the powerhouse; (3) an existing
powerhouse containing one new 800-kilowatt generating unit, which will
replace an existing 575-kW unit; (4) an existing 23-foot-long, 4-foot-
wide tailrace which discharges into an existing 36-inch-diameter pipe;
and (5) appurtenant facilities. The proposed project would have an
estimated annual generating capacity of 4,300 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA.. The conduit the facility uses is a tunnel, canal, pipeline, Y
aqueduct, flume, ditch, or similar manmade water
conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and
not primarily for the generation of electricity.
[[Page 2655]]
FPA 30(a)(3)(C)(i), as amended by The facility is constructed, operated, or maintained for Y
HREA. the generation of electric power and uses for such
generation only the hydroelectric potential of a non-
federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by The facility has an installed capacity that does not exceed Y
HREA. 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by On or before August 9, 2013, the facility is not licensed, Y
HREA. or exempted from the licensing requirements of Part I of
the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility not
required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the Web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD14-11-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: January 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-00542 Filed 1-14-14; 8:45 am]
BILLING CODE 6717-01-P